fixed unit price simulation for disposal of spent fuel ... - Greenpeace UK
fixed unit price simulation for disposal of spent fuel ... - Greenpeace UK
fixed unit price simulation for disposal of spent fuel ... - Greenpeace UK
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Research Report<br />
4. RESEARCH CONCLUSIONS<br />
4.1 Fixing The Government Risk Premium at 100%<br />
The effective risk premium charged by government <strong>for</strong> <strong>spent</strong> <strong>fuel</strong> <strong>disposal</strong> is rather low at<br />
around 42% <strong>for</strong> an AP1000 or 58% <strong>for</strong> an EPR (see Section 3.4). The Fixed Unit Price could<br />
be adjusted to 100% risk premium that we believe the market is willing to bear.<br />
The revised Quantity Fixed Unit Price (Q-FUP) will be approximately a £1.4m/tU and the<br />
revised Output Fixed Unit Price (O-FUP) will be approximately 0.24p/kWh.<br />
DECC Fixed Unit Prices Required For 100% Risk Premium<br />
Power<br />
Station<br />
Spent Fuel<br />
@ 60 Yrs<br />
NDA<br />
Disposal<br />
Cost<br />
Pr<strong>of</strong>it<br />
Margin /<br />
Risk<br />
Premium<br />
Required<br />
Disposal<br />
Price<br />
Required<br />
FUP @100%<br />
Risk Premium<br />
EPR 1,391 tU £972m 100% £1,944m 1.4 £m/tU<br />
£972m 100% £1,944m 0.24 p/kWh<br />
Twin EPR 2,781 tU £1,841m 100% £3,628m 1.3 £m/tU<br />
£1,841m 100% £3,628m 0.23 p/kWh<br />
AP1000 1,061 tU £751m 100% £1,502m 1.4 £m/tU<br />
£751m 100% £1,502m 0.27 p/kWh<br />
Twin AP1000 2,126 tU £1,442m 100% £2,884m 1.4 £m/tU<br />
£1,442m 100% £2,884m 0.26 p/kWh<br />
FUPSIM modeled @ 8,200 tU baseline legacy <strong>spent</strong> <strong>fuel</strong> inventory in NDA repository,<br />
65,000 MWd/tU thermal burn-up, EPR 37.2% efficient, AP1000 34.0% efficient,<br />
60 year generating period, 100 year storage period<br />
Jackson Consulting 42