Operation and Maintenance Manual - Halton Company
Operation and Maintenance Manual - Halton Company
Operation and Maintenance Manual - Halton Company
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Closure Panel Assembly<br />
9<br />
C<br />
C<br />
D<br />
B<br />
E<br />
B<br />
A<br />
Installation Notes:<br />
1) Panels “A” <strong>and</strong> “B” are to set on top of the hood perimeter.<br />
*Vertical flange at the bottom of closure panel <strong>and</strong> vertical<br />
flange on top of hood should line up.<br />
2) Hammer clips “C” over the two vertical flanges.<br />
3) Attach panels “B” to wall using appropriate hardware “D”.<br />
4) Slide front panel “A” into place.<br />
5) Attach panels “A” <strong>and</strong> “B” together using hardware “E”<br />
*(Hardware not provided by <strong>Halton</strong>)<br />
D<br />
E<br />
B<br />
A<br />
B<br />
C<br />
C<br />
CJOM/2009/rev2/EN