06.01.2014 Views

Operation and Maintenance Manual - Halton Company

Operation and Maintenance Manual - Halton Company

Operation and Maintenance Manual - Halton Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Closure Panel Assembly<br />

9<br />

C<br />

C<br />

D<br />

B<br />

E<br />

B<br />

A<br />

Installation Notes:<br />

1) Panels “A” <strong>and</strong> “B” are to set on top of the hood perimeter.<br />

*Vertical flange at the bottom of closure panel <strong>and</strong> vertical<br />

flange on top of hood should line up.<br />

2) Hammer clips “C” over the two vertical flanges.<br />

3) Attach panels “B” to wall using appropriate hardware “D”.<br />

4) Slide front panel “A” into place.<br />

5) Attach panels “A” <strong>and</strong> “B” together using hardware “E”<br />

*(Hardware not provided by <strong>Halton</strong>)<br />

D<br />

E<br />

B<br />

A<br />

B<br />

C<br />

C<br />

CJOM/2009/rev2/EN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!