Installation Instructions - H&S Performance
Installation Instructions - H&S Performance
Installation Instructions - H&S Performance
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STEP 22<br />
Install the 180 degree stainless tube in the bottom of the intake manifold with the new<br />
bracket block off plate combo.<br />
STEP 23<br />
Reinstall intake manifold, replace and torque bolts to 120 in lbs. Remove the EGR Valve and<br />
replace with provided block off plate and O-ring.<br />
STEP 25<br />
Reinstall turbo, all intake and exhaust tubes including down pipe, alternator, shroud, wires<br />
etc. in reverse order. Refill with new coolant and start engine, check for any leaks and top off<br />
fluids as needed.<br />
1-888-628-1730 • www.hsperformance.com 11