13.01.2014 Views

Installation Instructions - H&S Performance

Installation Instructions - H&S Performance

Installation Instructions - H&S Performance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STEP 22<br />

Install the 180 degree stainless tube in the bottom of the intake manifold with the new<br />

bracket block off plate combo.<br />

STEP 23<br />

Reinstall intake manifold, replace and torque bolts to 120 in lbs. Remove the EGR Valve and<br />

replace with provided block off plate and O-ring.<br />

STEP 25<br />

Reinstall turbo, all intake and exhaust tubes including down pipe, alternator, shroud, wires<br />

etc. in reverse order. Refill with new coolant and start engine, check for any leaks and top off<br />

fluids as needed.<br />

1-888-628-1730 • www.hsperformance.com 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!