Constancia<br />

In March 2011, we completed the acquisition of Norsemont<br />

Mining, owner of the Constancia advanced-stage copper<br />

development project, located in the Andes mountain range<br />

of southern Peru.<br />

Constancia is a perfect fit with our strategy in that it is a largescale<br />

porphyry deposit that offers significant exploration upside<br />

in an established mining-friendly jurisdiction with access to<br />

good infrastructure. We also have the financial capacity and<br />

mine development expertise to accelerate the development<br />

of Constancia.<br />

The plan is to mine the Constancia deposit as a low-cost open pit,<br />

using large-scale bulk mining techniques. With this new asset in<br />

our portfolio, our future combined copper production is expected<br />

to grow by approximately 155% between 2011 and 2016.<br />

Constancia will also contribute to our precious metals production,<br />

which is expected to increase by 130% during the same period.<br />

We have also announced a 2011 pre-construction program<br />

for the Constancia project of US$116 million. The program<br />

contemplates early equipment procurement for long lead<br />

items, a resource model update, a metallurgy review and pit<br />

optimization study, geotechnical and condemnation drilling and<br />

a US$9 million exploration program. The amounts budgeted for<br />

key items are as follows:<br />

Constancia 2011 Program Budget<br />

(US$ millions)<br />

Environmental, permitting, land 12<br />

General and administrative 12<br />

Engineering 10<br />

Preliminary construction estimate 27<br />

Preliminary procurement estimate 46<br />

Exploration 9<br />

Total 116<br />

Plans for Constancia 1<br />

Ownership 2 100%<br />

Projected life of mine<br />

Average annual copper production<br />

Concentrator capacity<br />

By-products<br />

Capital costs<br />

Cash costs 3<br />

15 years<br />

85,000 tonnes<br />

70,000 tonnes per day<br />

Molybdenum, gold, silver<br />

US$920 million<br />

US$0.93/lb copper<br />

Reserves Proven Probable<br />

Tonnes (millions) 195.00 177.00<br />

Cu (%) 0.42 0.37<br />

Mo (g/t) 117 92<br />

Ag (g/t) 3.49 3.66<br />

Au (g/t) 0.04 0.05<br />

1 Based on NI 43-101 technical report titled, “Constancia Project Technical <strong>Report</strong>”, dated February 21, 2011.<br />

2 Subject to <strong>HudBay</strong> completing compulsory acquisition of remaining ~2% of Norsemont shares it does not currently own.<br />

3 Excludes sustaining CAPEX, which equates to approximately $0.09/lb Cu.<br />