17.01.2014 Views

Dry Coring and Dry Wire Sawing in Reinforced Concrete

Dry Coring and Dry Wire Sawing in Reinforced Concrete

Dry Coring and Dry Wire Sawing in Reinforced Concrete

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Dry</strong> <strong>Cor<strong>in</strong>g</strong> <strong>and</strong> Cutt<strong>in</strong>g – Typical Applications<br />

<strong>Dry</strong> <strong>Cor<strong>in</strong>g</strong> <strong>and</strong> <strong>Dry</strong> <strong>Wire</strong> <strong>Saw<strong>in</strong>g</strong><br />

<strong>in</strong> Re<strong>in</strong>forced <strong>Concrete</strong><br />

BAUMA - IACDS 2010<br />

Applications<br />

• Probes to assess level of contam<strong>in</strong>ation <strong>in</strong> chemical <strong>and</strong> nuclear plants<br />

• Removal of anchors to prepare surface removal <strong>in</strong> power plants<br />

• Drill<strong>in</strong>g of through holes for <strong>in</strong>stallations <strong>in</strong> sensitive environment<br />

• <strong>Saw<strong>in</strong>g</strong> of open<strong>in</strong>gs <strong>in</strong> re<strong>in</strong>forced concrete<br />

• <strong>Saw<strong>in</strong>g</strong> of wood/concrete structures e.g. parquet on concrete<br />

• Rehabilitation of historical build<strong>in</strong>gs<br />

Mart<strong>in</strong> Gödickemeier,<br />

Ernst Siegenthaler<br />

Hilti Corporation, Schaan, Pr<strong>in</strong>cipality of Liechtenste<strong>in</strong><br />

Challenges<br />

• Drill<strong>in</strong>g <strong>and</strong> saw<strong>in</strong>g methods <strong>in</strong>volved usually need water cool<strong>in</strong>g<br />

• Cool<strong>in</strong>g water leads to secondary damage <strong>in</strong> sensitive environment<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 1<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 2<br />

Proposed Solutions for <strong>Dry</strong> Cutt<strong>in</strong>g <strong>and</strong> <strong>Cor<strong>in</strong>g</strong><br />

Conventional Technology needs water cool<strong>in</strong>g<br />

Applications<br />

Hilti solutions<br />

<strong>Dry</strong> drill<strong>in</strong>g <strong>in</strong><br />

re<strong>in</strong>forced concrete<br />

• Polycrystall<strong>in</strong>e diamond<br />

cutters PCD<br />

• Efficiency of drill<strong>in</strong>g<br />

process allows dry<br />

operation<br />

• Through holes for<br />

diamond wire<br />

<strong>Dry</strong> wire saw<strong>in</strong>g <strong>in</strong><br />

re<strong>in</strong>forced concrete <strong>and</strong> steel<br />

• Electroplated Diamond wire<br />

• Cool<strong>in</strong>g length allows for dry<br />

operation<br />

• Cutt<strong>in</strong>g of re<strong>in</strong>forced concrete<br />

• Cutt<strong>in</strong>g of steel structures<br />

Segment matrix<br />

Re<strong>in</strong>forced concrete<br />

10 mm<br />

Plough<strong>in</strong>g<br />

Crack<strong>in</strong>g<br />

Diamond<br />

1 mm<br />

Cutt<strong>in</strong>g direction<br />

500 microns<br />

• Process with low efficiency<br />

• Primarily a gr<strong>in</strong>d<strong>in</strong>g process<br />

f<strong>in</strong>e debris produced<br />

• Water cool<strong>in</strong>g needed except<br />

for wire saw<strong>in</strong>g<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 3<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 4<br />

1


Polycrystall<strong>in</strong>e Diamond PCD for <strong>Dry</strong> Drill<strong>in</strong>g<br />

PCD carrier<br />

Cutt<strong>in</strong>g<br />

Re<strong>in</strong>forced concrete<br />

¼<strong>in</strong>ch<br />

Cutt<strong>in</strong>g direction<br />

¼<strong>in</strong>ch<br />

• Process with high efficiency<br />

• Primarily cutt<strong>in</strong>g<br />

coarse debris produced<br />

• Air cool<strong>in</strong>g feasible<br />

1 mm<br />

PCD cutt<strong>in</strong>g – Effect on Gra<strong>in</strong> Size of Debris<br />

Share <strong>in</strong> volume [%]<br />

12<br />

10<br />

8<br />

6<br />

4<br />

PCD<br />

Diamond Segment<br />

2<br />

0<br />

1 10 100 1000<br />

Gra<strong>in</strong> size [µm]<br />

• Coarse debris can be removed easily<br />

• Energetically favorable process<br />

• Coarse debris facilitates dust collection<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 5<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 6<br />

Energetic Considerations<br />

Geometrically Def<strong>in</strong>ed Cutters<br />

Diamond impregnated<br />

segments – wet<br />

PCD cutter – dry<br />

W 0 = 1900 J/mm 3 W 0 = 380 J/mm 3<br />

W heat = 1600 J/mm 3<br />

W heat = 330 J/mm 3<br />

Fracture energy<br />

Plastic<br />

deformation<br />

Plastic<br />

deformation<br />

Fracture energy<br />

5x higher efficiency with PCD<br />

Basic experiments – lathe test on re<strong>in</strong>forced concrete<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 7<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 8<br />

2


<strong>Dry</strong> drill<strong>in</strong>g with Poly Cristall<strong>in</strong>e Diamonds<br />

<strong>Dry</strong> drill<strong>in</strong>g with Poly Cristall<strong>in</strong>e Diamonds<br />

PCD Drill bit ∅ 1 5/8´´, 7 ft deep hole cor<strong>in</strong>g<br />

6.6 ft<br />

Complete core<br />

Sta<strong>in</strong>less steel with anchor<br />

Steel core<br />

Alu<br />

0.06“<br />

Graphite<br />

10“<br />

Fe St.37<br />

1“<br />

Lead<br />

4 cm<br />

C-Steel<br />

½“<br />

<strong>Concrete</strong><br />

60“<br />

C-Steel<br />

1“<br />

Lead core Graphite Alum<strong>in</strong>ium<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 9<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 10<br />

The Hilti <strong>Dry</strong> <strong>Cor<strong>in</strong>g</strong> System – DD 200 air cooled<br />

The Hilti <strong>Dry</strong> <strong>Wire</strong> <strong>Saw<strong>in</strong>g</strong> System<br />

Diamond equipment<br />

Start<strong>in</strong>g aid<br />

DS WS15-E electrical 400V wire saw cpl. system<br />

Core Bit<br />

DD-B PCD<br />

DD 200<br />

air cooled motor<br />

DD-HD 30 drillst<strong>and</strong><br />

Key features enabl<strong>in</strong>g dry saw<strong>in</strong>g<br />

• Adjustable wire speed<br />

• >10 m <strong>in</strong>ternal wire storage cool<strong>in</strong>g by convection<br />

• <strong>Wire</strong> guards to protect operator<br />

• Dust collection channels<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 11<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 12<br />

3


Hilti VC 40-U Vacuum Cleaner with APFC<br />

Cost of Diamond Tools <strong>and</strong> <strong>Cor<strong>in</strong>g</strong> Equipment<br />

Outlast<br />

Robust design <strong>in</strong>- <strong>and</strong><br />

outside,<br />

Jobsite suitability<br />

Outperform<br />

Compact filter <strong>and</strong> <strong>in</strong>telligent<br />

plac<strong>in</strong>g of hose connection <strong>in</strong><br />

suction head<br />

Best <strong>in</strong> class<br />

volume/capacity ratio<br />

Diamond tools<br />

Core bits 4“ 1200 USD 0.5 – 2 m life expectancy<br />

2“ 900 USD<br />

<strong>Wire</strong> (electroplated) 150 USD/m 1 m 2<br />

Easy filter access<br />

Comfortable h<strong>and</strong>l<strong>in</strong>g,<br />

easy clean<strong>in</strong>g, time sav<strong>in</strong>g<br />

Advanced Power Filter Clean<strong>in</strong>g<br />

Technology<br />

Permanent <strong>and</strong> high<br />

suction performance<br />

Diamond equipment<br />

Dust collection unit<br />

Start<strong>in</strong>g aid<br />

350 USD<br />

1000 USD<br />

Robust tank <strong>and</strong> big wheel<br />

diameter<br />

Reliability, easy<br />

transport on the jobsite<br />

Easily changeable dust bag<br />

Comfortable h<strong>and</strong>l<strong>in</strong>g,<br />

easy dust removal, time<br />

sav<strong>in</strong>g<br />

DD 200 core rig<br />

3000 USD<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 13<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 14<br />

Does it pay off? – Example Nuclear Application<br />

<strong>Dry</strong> wire saw<strong>in</strong>g <strong>in</strong> re<strong>in</strong>forced concrete<br />

30000<br />

Application Cost USD<br />

25000<br />

20000<br />

15000<br />

10000<br />

5000<br />

reducable by<br />

evaporation<br />

Waste disposal<br />

Diamond tools<br />

Manpower<br />

0<br />

Conventional<br />

<strong>Dry</strong><br />

Application: Open<strong>in</strong>g <strong>in</strong> re<strong>in</strong>forced concrete of 2 x 2 x 1.5 m<br />

Manpower 80 USD/h, <strong>in</strong>clud<strong>in</strong>g preparational work<br />

Disposal 8000 USD/m 3<br />

Total drill<strong>in</strong>g <strong>and</strong> cutt<strong>in</strong>g time comparable for conventional <strong>and</strong> dry<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 15<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 16<br />

4


<strong>Dry</strong> wire saw<strong>in</strong>g with - dust removal<br />

<strong>Dry</strong> wire saw<strong>in</strong>g – Dust Collection Channel<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 17<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 18<br />

<strong>Dry</strong> wire saw<strong>in</strong>g <strong>in</strong> nuclear power plant, UK<br />

Opportunities & Applications<br />

Renovation <strong>in</strong> critical areas<br />

• All double walled structures <strong>in</strong> sensitive environment<br />

• Wood/concrete comb<strong>in</strong>ations<br />

• Operation <strong>in</strong> sensitive environment:<br />

Food process<strong>in</strong>g/storage, IT <strong>in</strong>frastructure, concrete plants, nuclear <strong>in</strong>stallations<br />

• Historic monuments<br />

Application cost are higher than <strong>in</strong> conventional operation<br />

20x for cor<strong>in</strong>g<br />

4x forwiresaw<strong>in</strong>g<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 19<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 20<br />

5


Conclusions<br />

• Efficient <strong>and</strong> reliable dry decommision<strong>in</strong>g of re<strong>in</strong>forced concrete<br />

strucures is only possible by comb<strong>in</strong><strong>in</strong>g PCD drill<strong>in</strong>g <strong>and</strong> dry wire<br />

saw<strong>in</strong>g.<br />

• <strong>Dry</strong> drill<strong>in</strong>g of re<strong>in</strong>forced concrete is only possible with PCD<br />

technology. High energy efficiency allows air cool<strong>in</strong>g.<br />

• <strong>Dry</strong> cutt<strong>in</strong>g of re<strong>in</strong>forced concrete is possible with wire saw<strong>in</strong>g.<br />

Short engaged length of wire gives high cool<strong>in</strong>g length.<br />

Reliable dry cutt<strong>in</strong>g <strong>and</strong> cor<strong>in</strong>g of re<strong>in</strong>forced concrete <strong>and</strong> steel is available.<br />

www.hilti.com<br />

IACDS Bauma 2010 sem<strong>in</strong>ar | ZH-Goedickemeier | 2010-04 21<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!