<strong>Integrated</strong> <strong>River</strong> <strong>Basin</strong> <strong>Planning</strong>: <strong>India</strong> and the EU share experience on policy and practice<br />
IWRM Progress in Kerala’s Pamba <strong>Basin</strong><br />
Table 12<br />
IWRM Roadmap for the Pamba <strong>River</strong> <strong>Basin</strong><br />
Next steps Milestones Indicators<br />
June 2011<br />
Form an operational body for water resources<br />
management in the Pamba <strong>River</strong> <strong>Basin</strong><br />
Pamba <strong>River</strong> Authority operational - offices,<br />
staff, work plans and budgets identified<br />
Capacity building in IWRM December 2011 Capacity need assessment conducted, IWRM<br />
training conducted at central and decentralised<br />
level<br />
Development of communication strategy<br />
September<br />
2011<br />
Communication strategy formulated and<br />
being implemented ensuring stakeholder<br />
involvement<br />
Enforcement of existing legal framework Immediately Identified priority issues addressed e.g. illegal<br />
sand mining<br />
Adjustment of existing legal water framework<br />
for the Kerala state<br />
January 2012 Enactment of primary water legislation<br />
Full assessment of the water resources situation<br />
(quantity and quality) in the Pamba <strong>Basin</strong><br />
Setting-up a sustainable monitoring and<br />
evaluation system for water resources<br />
management & establishment of an information<br />
system on water resources<br />
Initiation of elaboration and adoption of an IWRM<br />
Action Plan for the Pamba <strong>Basin</strong><br />
Elaboration of DPRs (Detailed Project Reports)<br />
for implementation of different actions identified<br />
Elaboration of financing plan and investment<br />
strategies<br />
Implementation of the IWRM Action Plan for the<br />
Pamba <strong>River</strong> <strong>Basin</strong><br />
Development of IWRM indicators to monitor the<br />
effects from implementing the IWRM plan<br />
March 2011<br />
August 2011<br />
August 2011<br />
December<br />
2012<br />
December 2011<br />
January 2012<br />
<strong>–</strong> December<br />
2015<br />
June 2012<br />
The quantity and quality of the resource<br />
assessed based on data from the numerous<br />
intuitions involved in monitoring<br />
MIS operational - databases, GIS and modelling<br />
tools<br />
Collaboration with the World Bank supported<br />
Hydrology II project for developing Hydrology<br />
Information System (HIS)<br />
IWRM action elaborated and endorsed by the<br />
government<br />
Detailed project reports prepared for the<br />
actions identified in the IWRM plan<br />
Financing strategies and development plans<br />
adopted<br />
Identified actions implemented.<br />
Set of indicators developed to monitor that the<br />
desired effect from the reform process is being<br />
achieved. Regular evaluation reports.<br />
9 IWRM Progress<br />
in Kerala’s<br />
Pamba <strong>Basin</strong><br />
9.1 Existing Situation<br />
The transition process crystallised by an IWRM Roadmap for the Pamba <strong>River</strong><br />
indicates how to go from an IWRM Vision to an IWRM Action Plan in an orderly,<br />
well-structured process. The Pilot Project applied a method developed by DHI<br />
in collaboration with the United Nations Environmental Programme (UNEP), the<br />
10 Steps/Results of the IWRM planning process (Figure 10). This approach<br />
clearly distinguishes the different stages the process is tied to and highlights the<br />
responsibilities and external factors needed for support to the process.<br />
The status of the IWRM progress in Kerala and the Pamba <strong>River</strong> <strong>Basin</strong> is reflected<br />
in Table 13, with its 10 rows corresponding to the 10 steps/results referred to<br />
above. The table represents a synthesis of where Kerala can be found in the<br />
IWRM planning process for the Pamba <strong>River</strong> <strong>Basin</strong>. Moreover, the comments<br />
indicate how the present Pilot Project has contributed in piloting IWRM in the<br />
Pamba <strong>River</strong> <strong>Basin</strong>. The current Roadmap has been developed to serve as a<br />
guiding document for the newly set-up Pamba <strong>River</strong> <strong>Basin</strong> Authority to direct its<br />
planning according to actions identified by the stakeholders and proposed means<br />
of implementation connected to specific timelines agreed during the workshops<br />
held during this pilot project.<br />
48 49