<strong>Integrated</strong> <strong>River</strong> <strong>Basin</strong> <strong>Planning</strong>: <strong>India</strong> and the EU share experience on policy and practice<br />

IWRM Progress in Kerala’s Pamba <strong>Basin</strong><br />

Table 12<br />

IWRM Roadmap for the Pamba <strong>River</strong> <strong>Basin</strong><br />

Next steps Milestones Indicators<br />

June 2011<br />

Form an operational body for water resources<br />

management in the Pamba <strong>River</strong> <strong>Basin</strong><br />

Pamba <strong>River</strong> Authority operational - offices,<br />

staff, work plans and budgets identified<br />

Capacity building in IWRM December 2011 Capacity need assessment conducted, IWRM<br />

training conducted at central and decentralised<br />

level<br />

Development of communication strategy<br />

September<br />

2011<br />

Communication strategy formulated and<br />

being implemented ensuring stakeholder<br />

involvement<br />

Enforcement of existing legal framework Immediately Identified priority issues addressed e.g. illegal<br />

sand mining<br />

Adjustment of existing legal water framework<br />

for the Kerala state<br />

January 2012 Enactment of primary water legislation<br />

Full assessment of the water resources situation<br />

(quantity and quality) in the Pamba <strong>Basin</strong><br />

Setting-up a sustainable monitoring and<br />

evaluation system for water resources<br />

management & establishment of an information<br />

system on water resources<br />

Initiation of elaboration and adoption of an IWRM<br />

Action Plan for the Pamba <strong>Basin</strong><br />

Elaboration of DPRs (Detailed Project Reports)<br />

for implementation of different actions identified<br />

Elaboration of financing plan and investment<br />

strategies<br />

Implementation of the IWRM Action Plan for the<br />

Pamba <strong>River</strong> <strong>Basin</strong><br />

Development of IWRM indicators to monitor the<br />

effects from implementing the IWRM plan<br />

March 2011<br />

August 2011<br />

August 2011<br />

December<br />

2012<br />

December 2011<br />

January 2012<br />

<strong>–</strong> December<br />

2015<br />

June 2012<br />

The quantity and quality of the resource<br />

assessed based on data from the numerous<br />

intuitions involved in monitoring<br />

MIS operational - databases, GIS and modelling<br />

tools<br />

Collaboration with the World Bank supported<br />

Hydrology II project for developing Hydrology<br />

Information System (HIS)<br />

IWRM action elaborated and endorsed by the<br />

government<br />

Detailed project reports prepared for the<br />

actions identified in the IWRM plan<br />

Financing strategies and development plans<br />

adopted<br />

Identified actions implemented.<br />

Set of indicators developed to monitor that the<br />

desired effect from the reform process is being<br />

achieved. Regular evaluation reports.<br />

9 IWRM Progress<br />

in Kerala’s<br />

Pamba <strong>Basin</strong><br />

9.1 Existing Situation<br />

The transition process crystallised by an IWRM Roadmap for the Pamba <strong>River</strong><br />

indicates how to go from an IWRM Vision to an IWRM Action Plan in an orderly,<br />

well-structured process. The Pilot Project applied a method developed by DHI<br />

in collaboration with the United Nations Environmental Programme (UNEP), the<br />

10 Steps/Results of the IWRM planning process (Figure 10). This approach<br />

clearly distinguishes the different stages the process is tied to and highlights the<br />

responsibilities and external factors needed for support to the process.<br />

The status of the IWRM progress in Kerala and the Pamba <strong>River</strong> <strong>Basin</strong> is reflected<br />

in Table 13, with its 10 rows corresponding to the 10 steps/results referred to<br />

above. The table represents a synthesis of where Kerala can be found in the<br />

IWRM planning process for the Pamba <strong>River</strong> <strong>Basin</strong>. Moreover, the comments<br />

indicate how the present Pilot Project has contributed in piloting IWRM in the<br />

Pamba <strong>River</strong> <strong>Basin</strong>. The current Roadmap has been developed to serve as a<br />

guiding document for the newly set-up Pamba <strong>River</strong> <strong>Basin</strong> Authority to direct its<br />

planning according to actions identified by the stakeholders and proposed means<br />

of implementation connected to specific timelines agreed during the workshops<br />

held during this pilot project.<br />