FINAL REPORT - Grand River Conservation Authority
FINAL REPORT - Grand River Conservation Authority
FINAL REPORT - Grand River Conservation Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Grand</strong> <strong>River</strong> Watershed-Wide Wastewater Optimization Pilot Project<br />
Workshop participants were assigned a member from the Facilitation Support<br />
Team to assist with the workshop assignment and gain experience in the<br />
facilitation role. The scheduling and approach for completion of the assignments<br />
by WWTP staff and facilitation support staff were reviewed and discussed in the<br />
workshop. Blank binders with labeled sections were handed out to organize<br />
plant-specific data and information for the pilot. Members of the Facilitation<br />
Support Team were provided with an Excel spreadsheet template for collating<br />
and summarizing WWTP data. They were requested to meet on-site with WWTP<br />
staff to:<br />
<br />
Conduct a brief WWTP walkthrough to gain an understanding of plant layout;<br />
Review the status of data collection for performance and loading and the<br />
status of performance against C of A requirements;<br />
Jointly calculate performance checks in Table 5 and discuss significance of<br />
findings<br />
Table 5: Performance & Loading Checks<br />
Per Capita Per capita annual average flow rate i.e. 350<br />
L/person•d<br />
Per capita BOD 5 loading i.e. 80 g/person•d<br />
Per capita TSS loading i.e. 90 g/person•d<br />
Ratios Peak day flow/annual average flow<br />
Ratios: TSS/BOD 5 & TKN/BOD 5<br />
Sludge accountability Projected sludge produced for 12-month period;<br />
Reported sludge produced for 12-month period;<br />
Sludge accountability as %<br />
The Optimization Steward provided the Facilitation Support Team with advice via<br />
e-mail and telephone consultation.<br />
At the conclusion of the workshop, a course evaluation form was distributed to<br />
workshop participants and members of the Steering Committee. Appendix A<br />
contains a summary of the participant feedback provided on the evaluation<br />
forms. The Facilitation Team met to debrief the workshop. The debriefing notes<br />
are contained in Appendix B. An application was prepared and submitted to<br />
obtain Continuing Education Units (CEUs) for those participating in the workshop<br />
16 | Page