28.01.2014 Views

FINAL REPORT - Grand River Conservation Authority

FINAL REPORT - Grand River Conservation Authority

FINAL REPORT - Grand River Conservation Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Grand</strong> <strong>River</strong> Watershed-Wide Wastewater Optimization Pilot Project<br />

Workshop participants were assigned a member from the Facilitation Support<br />

Team to assist with the workshop assignment and gain experience in the<br />

facilitation role. The scheduling and approach for completion of the assignments<br />

by WWTP staff and facilitation support staff were reviewed and discussed in the<br />

workshop. Blank binders with labeled sections were handed out to organize<br />

plant-specific data and information for the pilot. Members of the Facilitation<br />

Support Team were provided with an Excel spreadsheet template for collating<br />

and summarizing WWTP data. They were requested to meet on-site with WWTP<br />

staff to:<br />

<br />

Conduct a brief WWTP walkthrough to gain an understanding of plant layout;<br />

Review the status of data collection for performance and loading and the<br />

status of performance against C of A requirements;<br />

Jointly calculate performance checks in Table 5 and discuss significance of<br />

findings<br />

Table 5: Performance & Loading Checks<br />

Per Capita Per capita annual average flow rate i.e. 350<br />

L/person•d<br />

Per capita BOD 5 loading i.e. 80 g/person•d<br />

Per capita TSS loading i.e. 90 g/person•d<br />

Ratios Peak day flow/annual average flow<br />

Ratios: TSS/BOD 5 & TKN/BOD 5<br />

Sludge accountability Projected sludge produced for 12-month period;<br />

Reported sludge produced for 12-month period;<br />

Sludge accountability as %<br />

The Optimization Steward provided the Facilitation Support Team with advice via<br />

e-mail and telephone consultation.<br />

At the conclusion of the workshop, a course evaluation form was distributed to<br />

workshop participants and members of the Steering Committee. Appendix A<br />

contains a summary of the participant feedback provided on the evaluation<br />

forms. The Facilitation Team met to debrief the workshop. The debriefing notes<br />

are contained in Appendix B. An application was prepared and submitted to<br />

obtain Continuing Education Units (CEUs) for those participating in the workshop<br />

16 | Page

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!