28.01.2014 Views

FINAL REPORT - Grand River Conservation Authority

FINAL REPORT - Grand River Conservation Authority

FINAL REPORT - Grand River Conservation Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Grand</strong> <strong>River</strong> Watershed-Wide Wastewater Optimization Pilot Project<br />

Table 8: List of Report-outs presented at Workshop #3,<br />

Jarvis Community Centre, February 22 nd , 2011.<br />

Presenter WWTP WWTP Type Receiver Population<br />

Served<br />

M. Free & Paris Extended <strong>Grand</strong> 12,000<br />

T. Howarth WWTP<br />

D. Ford Plattsville<br />

Lagoon<br />

J. Denhoed<br />

S. Neal<br />

Fergus<br />

WWTP<br />

R. Lacharity New<br />

Hamburg<br />

WWTP<br />

Aeration<br />

Lagoons with<br />

intermittent<br />

sand filters<br />

Conventional<br />

Activated<br />

Sludge with<br />

tertiary filters<br />

Sequencing<br />

Batch<br />

Reactor with<br />

tertiary filters<br />

<strong>River</strong><br />

Nith <strong>River</strong> 1,168<br />

<strong>Grand</strong><br />

<strong>River</strong><br />

12,000<br />

Nith <strong>River</strong> 11,000<br />

D. Forth Cayuga<br />

WWTP<br />

Oxidation<br />

ditch<br />

<strong>Grand</strong><br />

<strong>River</strong><br />

T. Howarth Hamilton Conventional Hamilton<br />

Woodward Activated Harbour<br />

WWTP Sludge<br />

M. Anderson Dundalk Lagoons with Foley<br />

Lagoon tertiary filters Drain<br />

M. Anderson Roll-up of process loading evaluations (per capita<br />

flows, etc.) and next steps<br />

1,643<br />

480,000<br />

1,558<br />

At the conclusion of the workshop, awards were presented to those completing<br />

the take-away assignments and the Facilitation Support Team. Workshop<br />

participants were asked for comments and suggestions for follow-up optimization<br />

activities. Appendix E contains a summary of the participant feedback and<br />

suggestions for follow-up. The comments and suggestions from the participants<br />

were brought forward to the Steering Committee for their consideration in<br />

developing future optimization activities within the watershed.<br />

Communication and Outreach<br />

A communications plan for the WWOP was developed and implemented.<br />

Communication elements delivered included:<br />

A report to the GRCA board (June 10 th , 2010) to introduce the project and<br />

invite municipal participation;<br />

22 | Page

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!