LAKE<br />

<strong>Pinellas</strong><br />

Trail<br />

Loop<br />

Plan<br />

A Case Study<br />

November 2008<br />

(An Extension of the Existing <strong>Pinellas</strong> Trail <strong>to</strong><br />

Form a Loop Through the Entire County<br />

Connecting All Major Destinations)<br />

Brian K. Smith<br />

Executive Direc<strong>to</strong>r<br />

<strong>Pinellas</strong> County<br />

Metropolitan Planning Organization<br />

600 Cleveland Street, Suite 750<br />

Clearwater, FL 33755<br />

727-464-8200<br />

fax: 727-464-8201<br />

A 74.9-Mile Loop<br />

Divided in<strong>to</strong> 15 Segments<br />

with Identified Partners,<br />

Funding Sources,<br />

and Innovations.<br />

GULF BLVD.<br />

BELLEAIR<br />

LARGO<br />

WALSINGHAM<br />

102nd AVE. N.<br />

GULF BLVD.<br />

TARPON<br />

SPRINGS<br />

CRYSTAL<br />

BEACH<br />

OZONA<br />

K<br />

EAST AVE.<br />

113th STREET N.<br />

J<br />

SUNSET POINT RD.<br />

CLEARWATER<br />

DREW ST.<br />

SEMINOLE BLVD.<br />

ULMERTON RD.<br />

ALT. U.S. 19<br />

ALT.19<br />

GULF<br />

BELLEAIR<br />

PARK<br />

ALT.19<br />

ALDERMAN<br />

CURLEW RD.<br />

C.R.1<br />

DUNEDIN<br />

MAIN ST.<br />

KEENE RD.<br />

EAST BAY<br />

J<br />

HIGHLAND AVE.<br />

DRUID<br />

NURSERY<br />

STARKEY RD.<br />

DR.<br />

BELCHER RD.<br />

BRYAN<br />

DAIRY<br />

BLVD.<br />

TARPON AVE.<br />

KLOSTERMAN RD.<br />

TO BAY<br />

PARK ST.<br />

L<br />

NEBRASKA<br />

TAMPA RD.<br />

RD.<br />

RD.<br />

RD.<br />

BELCHER<br />

RD.<br />

TYRONE BLVD.<br />

U.S. 19<br />

JASMINE<br />

MELON<br />

A2<br />

S.R. 686<br />

66th ST. N.<br />

U.S. 19<br />

COUNTRYSIDE<br />

BLVD.<br />

S.R. 590<br />

62nd ST. N.<br />

LANDMARK DR.<br />

ENTERPRISE<br />

RD.<br />

B<br />

M<br />

C<br />

U.S. 19<br />

McMULLEN BOOTH RD.<br />

62nd AVE. N.<br />

54th AVE. N.<br />

38th AVE. N.<br />

TRINITY BLVD.<br />

GANDY<br />

34th ST. N.<br />

22nd AVE. N.<br />

ST. PETERSBURG<br />

9th AVE. N.<br />

CENTRAL<br />

N<br />

EAST<br />

RD.<br />

A1<br />

C.R.638<br />

S. R. 584<br />

BAYSIDE<br />

BRIDGE<br />

74th AVE. N.<br />

KEYSTONE RD.<br />

AVE.<br />

1st AVE. S.<br />

EAST LAKE<br />

S.R. 60<br />

S.R. 688<br />

118th AVE. N.<br />

PINELLAS PARK<br />

OLDSMAR<br />

U.S.19<br />

S.R.580<br />

SAFETY<br />

HARBOR<br />

ROOSEVELT BL.<br />

28th ST. N.<br />

I-275<br />

I-275<br />

I-275<br />

BLVD.<br />

16th ST. N.<br />

M. L. KING ST. N.<br />

I-375<br />

I-175<br />

GULFPORT<br />

22nd AVE. S.<br />

4th ST. N.<br />

1st ST. N.<br />

I-275<br />

D E<br />

F<br />

G<br />

83RD AVE. N.<br />

H<br />

I<br />

SAN MARTIN<br />

bsmith@pinellascounty.org<br />

www.pinellascounty.org/mpo<br />

PINELLAS BAYWAY<br />

54th AVE. S.


PINELLAS TRAIL LOOP PLAN -- A CASE STUDY<br />

The <strong>Pinellas</strong> Trail was originated in 1990 and by 1992 connected the St. Petersburg area along the western<br />

side of <strong>Pinellas</strong> County <strong>to</strong> Tarpon Springs. It was built on land that had been acquired from the railroad in<br />

the mid-1980s. This original section of the trail is 34 1/2 miles long. The trail is a 15-foot wide paved<br />

surface separated from mo<strong>to</strong>rized vehicles. It runs through the middle of the urban area and passes<br />

through six municipalities and several unincorporated communities. It connects the down<strong>to</strong>wn areas of<br />

these communities with residential areas, preserves, beaches, cultural facilities, parks, shopping, schools,<br />

and many other community destinations. In fact, the trail has become an influence on how development is<br />

occurring within the county. As an example, the city of Dunedin has <strong>to</strong>tally reoriented its down<strong>to</strong>wn <strong>to</strong>ward<br />

pedestrians such that it is focused around the trail which passes through the middle of the down<strong>to</strong>wn area.<br />

The Trail was originally conceived by the MPO’s Bicycle Advisory Committee as a recreation facility;<br />

however, not long after it was built residents and visi<strong>to</strong>rs began <strong>to</strong> use it as a transportation facility.<br />

Surveys of the trail use found that two-thirds of the trips on the trail are for work, school, errand running or<br />

social purposes. 80,000 people a month are found <strong>to</strong> be using the Trail. The original trail, in addition <strong>to</strong> the<br />

paved surface, contains three overpasses at Alt. U.S. 19, Bay Drive, and Ulmer<strong>to</strong>n Road. These<br />

overpasses were considered critical in making the initial trail a safe facility for people <strong>to</strong> use.<br />

Over the years, improvements have been made <strong>to</strong> the Trail, continually making it safer and more<br />

convenient <strong>to</strong> use. Six more overpasses were added across congested roadways. In addition, a half mile<br />

long trail bridge across Boca Ciega Bay was built where the original railroad trestle used <strong>to</strong> be. These latter<br />

improvements were funded from a combination of federal enhancement dollars and CMAQ dollars<br />

allocated by the MPO. This level of commitment was made <strong>to</strong> the Trail because it was now serving as a<br />

transportation service for both the residents and visi<strong>to</strong>rs <strong>to</strong> <strong>Pinellas</strong> County.<br />

As the <strong>Pinellas</strong> Trail established trails as a viable means of transportation, many communities became<br />

interested in developing trails connecting <strong>to</strong> the original corridor. The MPO's Bicycle Advisory Committee<br />

saw the need <strong>to</strong> document and plan these efforts in<strong>to</strong> one cohesive program. The Committee met with<br />

every jurisdiction in the county that had responsibility for constructing such facilities. Based upon that<br />

effort, a Trailways Plan was developed containing over 200 miles of trails within the urban area. These<br />

trails were all practical projects which had community support. The trails formed a complete system of<br />

connectivity within the county.<br />

During this process, the Committee identified a 20-mile long power line corridor along the east side of the<br />

county parallel <strong>to</strong> the existing <strong>Pinellas</strong> Trail. The Committee worked with the county and MPO <strong>to</strong> negotiate<br />

the use of that corridor, which was at the time controlled by Florida Power, for the purpose of a multiuse<br />

trail. The negotiations were successful and the power company provided a 99-year lease <strong>to</strong> the county for<br />

the construction of the trail. In return, the power company was given naming rights <strong>to</strong> call the trail the<br />

Florida Power Trail. Florida Power became Progress Energy and the project has continued on. The first<br />

segment of this trail has now been built and is in use.


It should be noted there is a benefit <strong>to</strong> have an existing trail such as the <strong>Pinellas</strong> Trail established within the<br />

community already because, as new trails are proposed, there is a higher comfort level in the community of<br />

what <strong>to</strong> expect when the trail is built. In that context, the MPO hosts a Trail Security Task Force consisting<br />

of all the law enforcement agencies along the existing corridor who meet quarterly for coordination and<br />

exchange of information. In addition, the MPO performed a study of real estate value and how that has<br />

positively affected the properties along the existing trail.<br />

In late 2006, the Bicycle Advisory Committee realized the Trailways Plan needed <strong>to</strong> be better defined, with<br />

an emphasis placed upon a continuous trail looping through the county serving as a main connecting line<br />

for the entire system. The result of this effort was a corridor referred <strong>to</strong> as the <strong>Pinellas</strong> Trail Loop. This<br />

included the existing <strong>Pinellas</strong> Trail, with improvements on the west side of the county and the Progress<br />

Energy Trail on the east side of the county. This loop is 74-miles long and connects all of the major<br />

destinations within the county. The loop also provides for regional connections <strong>to</strong> the adjacent counties.<br />

With some minor adjustments, the loop utilizes the facilities that already existed within the Trailways plan.<br />

When the Bicycle Advisory Committee first identified this trail loop plan, it appeared <strong>to</strong> be <strong>to</strong>o large an<br />

undertaking for the policy people <strong>to</strong> consider. The Committee carefully broke the entire loop plan in<strong>to</strong> 15<br />

manageable segments. Each of these segments was identified on a master map and then individually<br />

mapped. A master chart was developed keyed <strong>to</strong> this mapping which documented concerns and<br />

characteristics of each of those segments. This chart also includes partners that are involved, the activities<br />

<strong>to</strong> be undertaken, and the possible funding sources.<br />

Through this procedure, all of the key agencies developed a higher comfort level with the plan because it<br />

appeared <strong>to</strong> be manageable. The way this management plan is structured, there are activities furthering<br />

the various segments which are occurring at the same time. It should also be noted that with this approach<br />

and the various participants, creative ways are being identified <strong>to</strong> efficiently define and configure the Trail<br />

segments. This is resulting in considerable cost savings and also cost sharing among the segment<br />

partners. Using this approach, the Committee has set the goal of having this <strong>Pinellas</strong> Trail Loop plan built<br />

within 10 years. It should be noted that each segment sometimes has entirely different characteristics,<br />

partners, and funding sources. An example is the new segment of Trail that takes the <strong>Pinellas</strong> Trail in<strong>to</strong> the<br />

down<strong>to</strong>wn area of St. Petersburg. This effort involved the Trust for Public Land negotiating the purchase of<br />

this corridor from the railroad. While this was being negotiated, the County held the corridor integrity<br />

constant with the exercise of the federal rail banking procedure. An earmark had been obtained through<br />

Congressman Bill Young's office <strong>to</strong> complete the purchase of the corridor. FDOT assisted with this<br />

transaction. The city of St. Petersburg then agreed <strong>to</strong> build the trail using grant funds. <strong>Pinellas</strong> County<br />

<strong>to</strong>ok action <strong>to</strong> provide transportation impact fees for the funding of the overpass <strong>to</strong> be built by the city on<br />

U.S. 19 <strong>to</strong> connect this section of trail <strong>to</strong> the existing trail.<br />

This Loop Plan can serve as a blueprint for other jurisdictions <strong>to</strong> follow since every possible scenario of a<br />

trail configuration is included within this plan. At the present time, not all the funding is identified that is<br />

necessary <strong>to</strong> complete this plan. To date, funding for this plan had been derived from the local<br />

infrastructure sales tax, MPO federal enhancement funds, transportation impact fees, federal earmark,<br />

financial assistance from the Trust for Public Land Inc., developer contributions, and MPO federal CMAQ<br />

funding.<br />

-2-


BELCHE R RD<br />

N B<br />

D R<br />

LANDMARK DR.<br />

COUNTRYSIDE BLVD.<br />

<strong>Pinellas</strong><br />

Trail Loop<br />

US US US US US HIGHWAY HIGHWAY HIGHWAY HIGHWAY HIGHWAY 19 19 19 19 19 N N N N N<br />

US 19 UNDERPASS<br />

JASMINE<br />

MELON<br />

COACHMAN PARK<br />

MEMORIAL CSWY<br />

L<br />

FUTURE<br />

BEACH TRAIL<br />

INTERCONNECT<br />

34TH ST N<br />

55<br />

34TH ST S<br />

5TH AVE N<br />

GANDY BLVD.<br />

I-275<br />

CENTRAL AVE<br />

22nd AVE. N.<br />

28TH ST N<br />

US 19 OVERPASS<br />

54th AVE. N.<br />

38th AVE. N.<br />

30th AVE. N.<br />

9th AVE. N.<br />

5TH AVE N<br />

5th AVE. N.<br />

I-375<br />

CENTRAL AVE<br />

I<br />

I-275<br />

83rd AVE. N.<br />

77th AVE. N.<br />

DR. MARTIN LUTHER KING JR. ST. N.<br />

TARPON SPRINGS<br />

CITY PARK<br />

LAKE TARPON<br />

4th STREET N.<br />

A19<br />

1st STREET N.<br />

H<br />

EAST AVENUE<br />

TURNER ST.<br />

K<br />

S MYRTLE AVE<br />

SAN MARTIN<br />

62nd AVE. N.<br />

M<br />

KEYSTONE RD<br />

KEYSTONE ROAD<br />

5TH AVE N<br />

CENTRAL AVE<br />

I-175<br />

1st AVE S<br />

TROPICANA FIELD<br />

DREW ST<br />

DR DR DR DR DR MARTIN MARTIN MARTIN MARTIN MARTIN LUTHER LUTHER LUTHER LUTHER LUTHER KING KING KING KING KING JR JR JR JR JR ST ST ST ST ST N N N N N<br />

I-175<br />

DR DR DR DR DR MARTIN MARTIN MARTIN MARTIN MARTIN LUTHER LUTHER LUTHER LUTHER LUTHER KING KING KING KING KING JR JR JR JR JR ST ST ST ST ST S S S S S<br />

AT GRADE CROSSING<br />

CLEVELAND ST<br />

COURT ST<br />

5TH AVE N<br />

CENTRAL AVE<br />

WEEDON<br />

ISLAND<br />

PRESERVE<br />

4TH ST N<br />

687<br />

4TH ST S<br />

651<br />

CENTRAL AVE<br />

92<br />

Trail<br />

TAMPA BAY<br />

EAST EAST EAST EAST EAST LAKE LAKE LAKE LAKE LAKE RD RD RD RD RD<br />

590<br />

1st STREET<br />

Sidepath<br />

GULF BLVD.<br />

BELLEAIR<br />

LARGO<br />

WALSINGHAM<br />

102nd AVE. N.<br />

GULF BLVD.<br />

TARPON<br />

SPRINGS<br />

CRYSTAL<br />

BEACH<br />

OZONA<br />

K<br />

EAST AVE.<br />

113th STREET N.<br />

J<br />

SUNSET POINT RD.<br />

SEMINOLE BLVD.<br />

ULMERTON RD.<br />

ALT. U.S. 19<br />

ALT.19<br />

GULF<br />

PARK<br />

ALT.19<br />

ALDERMAN<br />

DREW<br />

BELLEAIR<br />

CURLEW RD.<br />

C.R.1<br />

DUNEDIN<br />

HIGHLAND AVE.<br />

MAIN ST.<br />

DRUID<br />

NURSERY<br />

KEENE RD.<br />

EAST BAY<br />

STARKEY RD.<br />

DR.<br />

BELCHER RD.<br />

BRYAN<br />

DAIRY<br />

BLVD.<br />

TARPON AVE.<br />

NEBRASKA<br />

TAMPA RD.<br />

CLEARWATER<br />

J<br />

KLOSTERMAN RD.<br />

TO BAY<br />

PARK ST.<br />

L<br />

ST.<br />

RD.<br />

RD.<br />

RD.<br />

BELCHER<br />

RD.<br />

TYRONE BLVD.<br />

U.S. 19<br />

JASMINE<br />

MELON<br />

A2<br />

S.R. 686<br />

66th ST. N.<br />

U.S. 19<br />

COUNTRYSIDE<br />

BLVD.<br />

S.R. 590<br />

62nd ST. N.<br />

LANDMARK DR.<br />

ENTERPRISE<br />

RD.<br />

B<br />

M<br />

C<br />

U.S. 19<br />

McMULLEN BOOTH RD.<br />

62nd AVE. N.<br />

54th AVE. N.<br />

38th AVE. N.<br />

TRINITY BLVD.<br />

GANDY<br />

34th ST. N.<br />

22nd AVE. N.<br />

CENTRAL<br />

N<br />

EAST<br />

C.R.638<br />

PINELLAS BAYWAY<br />

RD.<br />

S. R. 584<br />

BAYSIDE<br />

BRIDGE<br />

74th AVE. N.<br />

LAKE<br />

A1<br />

KEYSTONE RD.<br />

9th AVE. N.<br />

AVE.<br />

1st AVE. S.<br />

EAST LAKE<br />

S.R. 60<br />

S.R. 688<br />

118th AVE. N.<br />

PINELLAS PARK<br />

U.S.19<br />

S.R.580<br />

SAFETY<br />

HARBOR<br />

ROOSEVELT BL.<br />

28th ST. N.<br />

ST. PETERSBURG<br />

GULFPORT<br />

OLDSMAR<br />

I-275<br />

I-275<br />

I-275<br />

BLVD.<br />

83RD AVE. N.<br />

16th ST. N.<br />

54th AVE. S.<br />

M. L. KING ST. N.<br />

I-375<br />

I-175<br />

22nd AVE. S.<br />

4th ST. N.<br />

1st ST. N.<br />

I-275<br />

D E<br />

F<br />

G<br />

I<br />

SAN MARTIN<br />

H<br />

10/16/08<br />

CURLEW RD<br />

A2<br />

KEENE RD. CR 1<br />

NURSERY RD.<br />

BELLEAIR RD.<br />

BELCHER RD<br />

ELCHER RD<br />

MAIN ST SR 580<br />

SR580<br />

SUNSET POINT RD.<br />

DREW ST.<br />

COUNTRYSIDE BLVD<br />

HERCULES RD.<br />

H AY 19 N<br />

US HIG W<br />

TARPON OUTFALL CANAL<br />

DRUID RD.<br />

NURSERY RD.<br />

BELCHER RD.<br />

BELLEAIR RD.<br />

US HIGHWAY 19 N<br />

LAKE TARPON<br />

586<br />

CURLEW RD<br />

US HIGHWAY 19 N<br />

BOOT<br />

RANCH<br />

BLVD. N.<br />

TAMPA ROAD<br />

FDOT OVERPASS<br />

US 19<br />

SR 580<br />

REAM WILSON TRAIL<br />

CONNECTION<br />

GULF TO BAY BLVD. SR 60<br />

LAKE ST GEORGE<br />

CHESNUT<br />

PARK<br />

ENTRANCE<br />

OLDSMAR<br />

TRAIL<br />

CONNECTION<br />

ENTERPRISE RD.<br />

US 19<br />

EAST LAKE ROAD<br />

WOODLANDS BLVD.<br />

A1<br />

MCM ULLEN BOOTH RD<br />

B<br />

SR 590<br />

TAMPA BAY<br />

MCMULLEN BOOTH RD<br />

CURLEW RD<br />

ENTERPRISE RD.<br />

McMULLEN BOOTH RD.<br />

SR 580<br />

AT GRADE<br />

CROSSING<br />

TA MPA RD<br />

Progress Energy<br />

Alignment<br />

ENTERPRISE RD E<br />

MAIN ST.<br />

BAYSIDE<br />

BRIDGE<br />

BAYSIDE<br />

BRIDGE<br />

580<br />

Countryside Blvd.<br />

Alignment<br />

Landmark Drive<br />

Alignment<br />

Composite Alignment<br />

CENTRAL AVENUE<br />

GANDY<br />

GANDY<br />

I-275<br />

DR DR DR DR DR MARTIN MARTIN MARTIN MARTIN MARTIN LUTHER LUTHER LUTHER LUTHER LUTHER KING KING KING KING KING JR JR JR JR JR ST ST ST ST ST N N N N N<br />

I-175<br />

RIO VISTA PARK<br />

4TH ST N<br />

687<br />

4TH 4TH 4TH 4TH 4TH ST ST ST ST ST N N N N N<br />

92<br />

83rd AVE. N.<br />

1st STREET N.<br />

SAN MARTIN BLVD.<br />

G<br />

H<br />

FBRIDGE<br />

T. E. Funded Project<br />

(77th Ave. N <strong>to</strong> 30th Ave. N.)<br />

Partial Funding<br />

(30th Ave. N. <strong>to</strong> 1st Ave. S.)<br />

RIO VISTA SCHOOL<br />

WEEDON<br />

ISLAND<br />

BRYAN DAIRY<br />

RD.<br />

Resource Recovery<br />

Facility<br />

D<br />

I-275<br />

Toy<strong>to</strong>wn<br />

Struthers<br />

Overpass<br />

GANDY BLVD.<br />

I-275<br />

DR. M. L. KING JR. ST. N<br />

ROOSEVELT BLVD.<br />

102nd AVE. N.<br />

E<br />

94th AVE. N.<br />

4th ST. N.<br />

GANDY BLVD. US 92<br />

Friendship Trail<br />

SAN MARTIN<br />

F<br />

Weedon<br />

Island<br />

58th ST. N.<br />

CROSS BAYOU<br />

ULMERTON RD. SR 688<br />

Underpass<br />

D<br />

US 19 N.<br />

49th ST. N.<br />

126th AVE. N.<br />

118th AVE. N.<br />

110th AVE. N.<br />

Drainageway<br />

County Utilities<br />

Corridor ROW<br />

Drainage Easement<br />

ROW<br />

County Utilites<br />

ROW<br />

34th ST. N.<br />

ROOSEVELT BLVD.<br />

28th ST. N.<br />

Resource<br />

Recovery<br />

Facility<br />

I-275<br />

Overpass<br />

GANDY BLVD.<br />

US 19<br />

HAINES BAYSHORE RD.<br />

WHITNEY RD.<br />

E. BAY DR. ROOSEVELT BLVD.<br />

150th AVE. N.<br />

66th ST. N.<br />

US 19<br />

62nd ST. N.<br />

C<br />

SR 686<br />

49th ST. N.<br />

FDOT<br />

UNDERPASS<br />

ULMERTON RD. SR 688<br />

P18/MPO/BKPD/Loop/Segments 6 10/17/08


A1 Chesnut<br />

A2 Progress Energy Trail<br />

B<br />

C<br />

D<br />

E<br />

F<br />

Progress Energy Trail<br />

DESCRIPTION MILES DIRECTION AND OPTIONS PARTICIPANTS<br />

West side of East Lake<br />

Road Chesnut Park <strong>to</strong><br />

Tampa Rd<br />

PE alignment<br />

Tampa Road <strong>to</strong> US 19<br />

PE alignment<br />

I-275 <strong>to</strong> Weedon<br />

G Rio Vista Rio Vista <strong>to</strong> 1st Street 0.5<br />

H<br />

I<br />

J<br />

K<br />

L<br />

M<br />

N<br />

PROJECT NAME<br />

Progress Energy Trail<br />

Progress Energy Trail<br />

Progress Energy Trail<br />

83rd Connec<strong>to</strong>r<br />

North Bay<br />

CSX<br />

Fred Marquis<br />

East Avenue<br />

Jasmine /Melon<br />

Keys<strong>to</strong>ne<br />

East Lake Rd<br />

PE alignment<br />

US 19 <strong>to</strong> US 19<br />

PE alignment<br />

US 19 <strong>to</strong> Ulmer<strong>to</strong>n<br />

PE alignment<br />

Ulmer<strong>to</strong>n <strong>to</strong> I-275<br />

1st Street & Coffee Pot Blvd.<br />

Rio Vista <strong>to</strong> 1st Ave S<br />

Tarpon Springs <strong>to</strong> St. Pete<br />

US 19 <strong>to</strong> US 19<br />

Clearwater Down<strong>to</strong>wn<br />

Segment<br />

O LOOP Entire Trail<br />

83rd Ave. alignment<br />

San Martin <strong>to</strong> Rio Vista<br />

1st Avenue South and CSX<br />

Water Front <strong>to</strong> US 19<br />

Live Oak - Jasmine-Melon<br />

US 19 <strong>to</strong> Keys<strong>to</strong>ne Rd.<br />

North side of Keys<strong>to</strong>ne Rd<br />

Melon St <strong>to</strong> East Lake Rd<br />

West side of East Lake Rd.<br />

Keys<strong>to</strong>ne <strong>to</strong> Chesnut Park<br />

1.8<br />

4.5<br />

5.5<br />

2.8<br />

5.3<br />

2.5<br />

0.9<br />

6.3<br />

3.0<br />

33.5<br />

East Lake Road corridor<br />

Consider sidewalk upgrade<br />

on service road<br />

3 other options are:<br />

- Countryside Blvd<br />

- Landmark Drive<br />

- Hybrid of Countryside/PE<br />

County<br />

Clearwater,<br />

County, PE<br />

2007 PROJECT<br />

COST EST.<br />

$ 10.7 M<br />

(cost will be reduced)<br />

$ 11.4 M<br />

(cost will be reduced)<br />

At-Grade Trail Penny F<br />

US 19/Enterprise<br />

Overpass<br />

FDOT<br />

F<br />

FOLLOW THROUGH<br />

Consider sidewalk upgrade on service road as a less costly alternative<br />

a) Refine Landmark Drive alternative<br />

b) Explore city constructing w/ city resources<br />

c) Pursue design/construction w/ Penny funds<br />

d) Eval recommended Hybrid PE corr w/Countryside Blvd<br />

Construction complete from Belleair Road <strong>to</strong> Bright House Field;<br />

Balance of project construction <strong>to</strong> Enterprise Rd <strong>to</strong> follow completion of first<br />

phase<br />

Construction of Overpass by FDOT underway<br />

cost: $3.9 M<br />

(need <strong>to</strong> track earmarked funds)<br />

TO BE FUNDED<br />

$ 10.7 M<br />

(cost will be reduced)<br />

$ 11.4 M<br />

(cost will be reduced)<br />

EVAL ESTIM $ 1.9 M<br />

US 19/Belleair<br />

Crossing<br />

FDOT F Incorporated as an at-grade crossing in US 19 Bayside Project<br />

Pursue at-grade Trail with Penny County, PE, Largo TBD<br />

$ 7.4 M Schedule design in 08/09 construction in 09/10 with Penny $ 7.4 M<br />

Ulmer<strong>to</strong>n underpass -<br />

FDOT under construction<br />

FDOT FDOT<br />

F Underpass construction included as part of Ulmer<strong>to</strong>n Road project Construction Complete<br />

Pursue PE alignment<br />

Negotiate developer construction<br />

Collaborate with St. Pete<br />

Pursue incorporation in Gandy<br />

Improvement with FDOT<br />

Pursue north side of 83rd Avenue<br />

Incorporate in bridge rehabilitation<br />

City constructed Trail<br />

Uses existing pedestrian bridge over<br />

canal<br />

City designing 1st St. off-road side path<br />

Work with City on seeking construction<br />

fund<br />

St. Pete constructing Coffee Pot<br />

area Trail<br />

Resurface existing Trail per<br />

Penny Program ($3M)<br />

6 Blks Upgrade 6-block section <strong>to</strong> Trail design<br />

0.8<br />

3.0<br />

4.3<br />

Total<br />

74.9<br />

Constructing with existing Penny funds:<br />

- Enterprise overpass - FDOT 2008<br />

- Belleair - US 19 crossing - FDOT 2009<br />

Continue PE alignment<br />

Negotiate with utilities alignment (1.8<br />

mi)<br />

Negotiate - developer construction<br />

Seek interstate funding for overpass<br />

City designing and constructing 12-foot<br />

trail on CSX and off-road side path<br />

on<br />

1st Avenue South<br />

U.S. 19 includes Trail underpass per<br />

MPO action<br />

County Constructed Trail segment<br />

Trail <strong>to</strong> be on north side with road<br />

improvement<br />

Keys<strong>to</strong>ne Road crossing at East Lake<br />

Road <strong>to</strong> be at-grade<br />

Trail exists as side path on west of<br />

roadway<br />

County, PE,<br />

Clearwater, FDOT<br />

County, St. Pete,<br />

<strong>Pinellas</strong> Park,<br />

Utilities, FDOT,<br />

PE, Developers<br />

County, St. Pete,<br />

FDOT, PE,<br />

Developers<br />

County, St. Pete<br />

$ 7.3 M<br />

(cost reduction w/<br />

partners including<br />

trail in their projects<br />

Negotiate with developers<br />

Collaborate with City<br />

Pursue with Gandy Improvements<br />

St. Pete, County Existing<br />

N/A Existing<br />

St. Pete, County<br />

St. Pete, County,<br />

FDOT<br />

County, FDOT<br />

Clearwater,<br />

County<br />

$ 5.7 M<br />

(cost will be reduced)<br />

County committing $2M <strong>to</strong> construct the 1st Street section of this trail;<br />

the city is funding the balance of the project <strong>to</strong> the south.<br />

Total trail cost will be much less than the original $5.7M<br />

$ 17.2 M<br />

(cost reduced w/ partnerships<br />

and partners building trail)<br />

$ 7.3 M<br />

(cost reduction w/ partners<br />

including trail in their projects<br />

$ 5.7 M<br />

(cost will be reduced)<br />

12-ft trail St. Petersburg $ 1.5 M /F Existing Grand Opening 10/04/08<br />

add ped trail<br />

(5-ft)<br />

TBD $ 1.5 M Work with St. Pete on funding $ 1.5 M<br />

US 19 Overpass<br />

Impact Fees<br />

$ 3 M<br />

(modified by MPO <strong>to</strong> $3.5M)<br />

N/A<br />

$1.2 M<br />

MPO recommended County fund - BCC funding with Impact Fees;<br />

Funding agreement in negotiation for construction.<br />

Advance funding from Penny Extension.<br />

BAC <strong>to</strong> recommend problem segments for rehab funding,<br />

but full rehab is necessary- enhancement funds also sought<br />

MPO placed high priority for Federal Enhancement funding - city initiating<br />

LAP agreement w/ FDOT<br />

County Existing<br />

N/A Existing<br />

County Road construction - Penny<br />

N/A Trail incorporated in road project <strong>to</strong> be constructed '09<br />

County Existing<br />

N/A Existing<br />

F = FUNDED<br />

TBD = TO BE DETERMINED<br />

FUNDING / SOURCE<br />

$ 17.2 M<br />

At-Grade Trail TBD<br />

(cost reduced w/<br />

partnerships and<br />

partners building<br />

trail)<br />

Negotiate with Utilities<br />

Negotiate with Developers<br />

Seek Federal funds for I-275 overpass<br />

Letter of Understanding with Lakes Homewoners Assoc. for Trail<br />

I-275 Overpass FDOT (TBD) $ 6.4 M $ 6.4 M<br />

TBD<br />

Bridge funding<br />

TBD<br />

TBD<br />

TBD<br />

TBD<br />

Existing<br />

TBD<br />

$ 8.5 M Evaluate funding options as part of bridge repair $ 8.5 M<br />

$ 3 M<br />

(modified by MPO <strong>to</strong> $3.5M)<br />

$ 1.2 M<br />

TOTAL<br />

$80.3 M<br />

(<strong>to</strong>tal cost will be reduced)<br />

Loop Chart 111208 11/14/2008


LAKE<br />

S.R.590<br />

HILLSBOROUGH CO.<br />

ELFERS TRAIL<br />

ELFERS SPUR-ANCLOTE CROSSING TRAIL<br />

HOWARD PARK TRAIL<br />

WHITCOMB BAYOU TRAIL<br />

MERES TRAIL<br />

TARPON SPRINGS<br />

PASCO<br />

ALT.19<br />

TARPON<br />

AVE.<br />

KLOSTERMAN<br />

RD.<br />

COUNTY<br />

RD.<br />

TRINITY BLVD.<br />

KEYSTONE RD.<br />

NORTHEAST EXTENSION-<br />

JASMINE SEGMENT<br />

STARKEY<br />

WILDERNESS TRAIL<br />

TRINITY TRAIL<br />

BROOKER CREEK TRAIL<br />

CRYSTAL BEACH<br />

ALDERMAN<br />

NEBRASKA<br />

U.S. 19<br />

EAST<br />

EAST LAKE<br />

NORTHEAST EXTENSION-<br />

KEYSTONE SEGMENT<br />

HONEYMOON ISLAND TRAIL<br />

CURLEW ROAD TRAIL<br />

DUNEDIN COMMUNITY TRAIL<br />

EDGEWATER TRAIL<br />

OLD COACHMAN TRAIL<br />

CSX TRAIL<br />

N. GREENWOOD LOOP<br />

MEMORIAL CAUSEWAY PATH<br />

CLEARWATER BEACH TRAIL<br />

EAST AVENUE CONNECTOR<br />

ROSS NORTON CONNECTION<br />

BELLEAIR ROAD TRAIL<br />

TAYLOR TRAIL<br />

BELLEAIR CAUSEWAY TRAIL<br />

LARGO BRICK TRAIL<br />

LARGO CENTRAL PARK TRAIL<br />

INDIAN ROCKS BRIDGE<br />

WALSINGHAM SPUR<br />

SEMINOLE SPC SPUR<br />

CULTURAL FACILITIES TRAIL<br />

PARK BLVD. BRIDGE<br />

LAKE SEMINOLE TRAIL<br />

GULF BEACHES BIKE PATH<br />

GULF BLVD.<br />

WELCH CAUSEWAY<br />

BELLEAIR<br />

LARGO<br />

WALSINGHAM<br />

RD.<br />

GULF BLVD.<br />

PINELLAS EQUESTRIAN TRAIL<br />

TREASURE ISLAND CAUSEWAY TRAIL<br />

PINELLAS<br />

TRAILWAYS PLAN<br />

PINELLAS TRAIL<br />

PINELLAS TRAIL<br />

EXTENSIONS<br />

COMMUNITY TRAILS<br />

GULF. BLVD.<br />

IMPROVEMENT PROGRAM<br />

PINELLAS TRAIL<br />

PROGRESS ENERGY EXT.<br />

BEACH ACCESS<br />

TO PINELLAS TRAIL<br />

Trail Overpass/Underpass<br />

<strong>Pinellas</strong> County MPO<br />

OZONA<br />

ALT. U.S. 19<br />

113th STREET N.<br />

102nd AVE. N.<br />

SEMINOLE<br />

ALT. U.S. 19<br />

ALT.19<br />

C.R.1<br />

DUNEDIN<br />

MAIN ST.<br />

SUNSET POINT RD.<br />

DREW<br />

GULF TO BAY<br />

DRUID<br />

NURSERY<br />

BELLEAIR<br />

KEENE RD.<br />

STARKEY RD.<br />

PARK<br />

TA MPA RD.<br />

CURLEW RD.<br />

RD.<br />

BRYAN<br />

DAIRY<br />

PARK ST.<br />

BELCHER RD.<br />

CLEARWATER<br />

EAST BAY DR.<br />

SEMINOLE BLVD.<br />

HIGHLAND AVE.<br />

BELCHER<br />

ULMERTON RD.<br />

37TH ST.<br />

TRAIL<br />

COREY<br />

CAUSEWAY<br />

SOUTH<br />

BEACHES<br />

TRAIL<br />

CHILDS PARK<br />

TRAIL<br />

(CLAM BAYOU)<br />

BAYWAY TRAIL<br />

SOUTH<br />

ST.<br />

BLVD.<br />

TYRONEBL.<br />

FORT DESOTO<br />

PARK TRAIL<br />

S.R. 580<br />

RD.<br />

RD.<br />

RD.<br />

SR 590<br />

66th ST. N.<br />

U.S. 19<br />

S.R. 686<br />

U.S. 19<br />

McMULLEN BOOTH RD.<br />

62nd AVE. N.<br />

54th AVE. N.<br />

38th AVE. N.<br />

GANDY<br />

34th ST. N.<br />

22nd AVE. N.<br />

9th AVE. N.<br />

CENTRAL<br />

BAYWAY<br />

C.R.752<br />

C.R.102<br />

BAYSIDE<br />

BRIDGE<br />

S.R. 60<br />

S.R. 688<br />

118th AVE. N.<br />

PINELLAS PARK<br />

74th AVE. N.<br />

OLDSMAR<br />

S.R.584 S.R. 580<br />

28th ST. N.<br />

ST. PETERSBURG<br />

5th AVE. N.<br />

SAFETY HARBOR<br />

AVE.<br />

I-275<br />

I-275<br />

22nd AVE. S.<br />

BAYSHORE TRAIL<br />

ROOSEVELT BL.<br />

I-275<br />

SKYWAY<br />

BRIDGE<br />

16th ST. N.<br />

54th AVE. S.<br />

M. L. KING ST. N.<br />

4th ST. N.<br />

LANDMARK TRAIL<br />

OLDSMAR/SAFETY HARBOR<br />

CROSSING TRAIL<br />

BAYSHORE TRAIL<br />

I-275<br />

OLDSMAR TRAILS<br />

ENTERPRISE TRAIL<br />

MAIN STREET TRAIL<br />

COURTNEY CAMPBELL<br />

RECREATIONAL TRAIL<br />

CLEARWATER EAST-WEST TRAIL<br />

COURTNEY CAMPBELL CONNECTION<br />

DRUID ROAD TRAIL<br />

142ND AVE. TRAIL<br />

BLV D.<br />

PINELLAS TRAIL<br />

EXTENSION<br />

(ST. PETERSBURG)<br />

BOOKER CREEK TRAIL<br />

DOWNTOWN CONNECTION<br />

TRAIL<br />

LAKE MAGGIORE TRAIL<br />

SOUTH BAY TRAIL<br />

BAYWAY TRAIL NORTH<br />

SKYWAY TRAIL<br />

GATEWAY<br />

NATURE TRAIL<br />

FRIENDSHIP TRAIL<br />

(Old Gandy bridge)<br />

WEEDON ISLAND<br />

TRAIL<br />

FREEDOM LAKE<br />

TRAIL<br />

NORTH BAY TRAIL<br />

(INCLUDES RIO VISTA<br />

CONNECTION)<br />

62ND AVE./JOE’S CREEK<br />

TRAIL<br />

NORTH BAY TRAIL<br />

P18/MPO/BKPD/Bmap1 10/24/07


THE PINELLAS TRAIL LOOP PROGRAM<br />

November 2008<br />

An oversight initiative by the Bicycle Advisory Committee (BAC) <strong>to</strong> assist the <strong>Pinellas</strong> County community in<br />

completing the loop within 10 years.<br />

A1. Chesnut Park Connec<strong>to</strong>r (1.8 miles) – Chesnut Park <strong>to</strong> Tampa Road<br />

The Trail is proposed <strong>to</strong> continue on the west side of East Lake Road and tie in<strong>to</strong> the extension of the<br />

Progress Energy Trail in the Tampa Road vicinity. The Trail will be located in the county road right-of-way<br />

but some alternatives will need <strong>to</strong> be explored <strong>to</strong> provide a good connection <strong>to</strong> the Trail <strong>to</strong> the south. This<br />

will be the same location where a connection will be made <strong>to</strong> the Oldsmar Trail, which opens regional<br />

connectivity <strong>to</strong> the east.<br />

A2. Progress Energy Trail Segment A (4.5 miles) –Tampa Road <strong>to</strong> Enterprise Road/U.S. 19<br />

The original alignment follows the powerline. Since large sections are not owned by the power company<br />

but have been permitted for various uses through easements, it is indicated that it could be very expensive<br />

<strong>to</strong> place a trail on the original alignment. The city of Clearwater has proposed two parallel north-south<br />

public right-of-way as available alternatives. These are Countryside Boulevard and Landmark Drive.<br />

These alignments have very wide public right-of-way with almost no driveway crossings, and actually have<br />

been considered by the city for years as candidates for a trail project. Discussion and coordination with the<br />

City <strong>to</strong> pursue one or both of these alternatives continues <strong>to</strong> be appropriate.<br />

A third alternative was identified that could use the Progress Energy corridor along the south end of the<br />

segment, then cross at Meadow Wood Drive <strong>to</strong> connect <strong>to</strong> Countryside Boulevard which would then used<br />

for the north segment of the trail. This alternative eliminates the need <strong>to</strong> pass though the privately owned<br />

segment <strong>to</strong> the north of the Progress Energy corridor that was identified <strong>to</strong> have high right-of-way costs.<br />

BAC asked the MPO <strong>to</strong> conduct a feasibility study <strong>to</strong> identify the most cost-effective alternative route<br />

possible <strong>to</strong> provide a connection through this area while still maintaining valuable connections <strong>to</strong> retail<br />

centers, public services, and other community destinations.<br />

B. Progress Energy Trail Segment B (5.5 miles) – Enterprise Road/U.S. 19 <strong>to</strong> Belleair Road/U.S. 19<br />

The Trail overpass of U.S. 19 at Enterprise Road is an FDOT project scheduled for construction in 2008.<br />

Utilizing Penny funding, Progress Energy has constructed the Trail in the powerline alignment from Belleair<br />

Road <strong>to</strong> Bright House Field north of Drew Street. The full contract provides for further construction<br />

northward <strong>to</strong> Enterprise Road and other areas <strong>to</strong> the south as funding permits. Engineering design for the<br />

section north of Bright House Field <strong>to</strong> the Enterprise Road interchange is nearly complete. The FDOT<br />

design for Belleair Road/U.S. 19 provides an at-grade crossing for the Trail. This is a FDOT funded project.<br />

North of Drew Street, the powerline corridor intersects with the CSX railroad, and this crossing provides an<br />

additional challenge. One alternative is <strong>to</strong> utilize the existing crossing of the railroad at the Ream Wilson<br />

Trail, Clearwater’s east-west multi-use trail. The proposed alignment would therefore follow the Ream<br />

Wilson Trail north of Bright House Field, <strong>to</strong> Old Coachman/NE Coachman intersection, where it would cross<br />

the railroad tracks. The sidewalk on NE Coachman will be widened from the railroad eastward <strong>to</strong> the<br />

powerline ROW, where the trail will continue north within the utility corridor.<br />

1


C. Progress Energy Trail Segment C (2.8 miles) – Belleair Road/US 19 <strong>to</strong> Ulmer<strong>to</strong>n Road<br />

The Trail proceeds from the east side of U.S.19 within the powerline alignment <strong>to</strong> Ulmer<strong>to</strong>n Road. It is<br />

anticipated that partial funding should be available <strong>to</strong> begin construction of Segment C and continue the<br />

Progress Energy Trail southward <strong>to</strong>ward Ulmer<strong>to</strong>n Road, where FDOT is currently constructing an<br />

underpass at Cross Bayou as part of the road construction project. The road construction and underpass is<br />

funded FDOT as part of Ulmer<strong>to</strong>n Road improvements scheduled for 2008.<br />

D. Progress Energy Trail Segment D (5.3 miles) – Ulmer<strong>to</strong>n Road <strong>to</strong> I-275<br />

The Trail through this segment for large sections does not follow the powerline alignment and diverts<br />

around the Mainland's area utilizing a county drainageway corridor and also a County Utilities property<br />

corridor. As the Trail crosses 28th Street, there are negotiations by the city of St. Petersburg for the Trail <strong>to</strong><br />

be built by developer Grady Pridgeon through this area <strong>to</strong> I-275. The crossing of I-275 will require an<br />

overpass, which will more than likely qualify for federal funding.<br />

E. Progress Energy Trail Segment E (2.5 miles) – I-275 <strong>to</strong>/Weedon Island Preserve and the Connection <strong>to</strong> the<br />

Friendship Trail<br />

The Trail follows the powerline alignment and there are many opportunities for partnerships <strong>to</strong> build the<br />

Trail with developers through this area. This will involve cooperation between <strong>Pinellas</strong> County, the city of<br />

St. Petersburg, Progress Energy and the several developers in the corridor. The Trail will also benefit from<br />

funding opportunities as it proceeds through the Gandy highway improvement projects.<br />

(The above segments A. through E. <strong>to</strong>tal 20.6 miles)<br />

F. 83rd Avenue Connec<strong>to</strong>r Trail (0.9 miles) – San Martin/Weedon Island <strong>to</strong> Rio Vista Drive<br />

The Trail proceeds along San Martin as it crosses the bridge and proceeds along 83rd Avenue <strong>to</strong> the<br />

school at Rio Vista. The Trail will follow the public right-of-way for this county road along the north side in<br />

this area. This segment will require a bridge crossing, but that can be incorporated in<strong>to</strong> the highway bridge<br />

improvement that is much needed at the same location. This will involve cooperation between the city of<br />

St. Petersburg and <strong>Pinellas</strong> County.<br />

G. Rio Vista Trail (0.5 miles) – 83rd Avenue <strong>to</strong> 1st Street<br />

The Trail proceeds along Rio Vista Drive <strong>to</strong> the city park and then follows the berm on the north side of the<br />

canal <strong>to</strong> the pedestrian bridge then over the canal <strong>to</strong> 1st Street. This project would incorporate and amplify<br />

a significant school crossing at Rio Vista at 83rd Avenue and be incorporated in<strong>to</strong> a city park. It would<br />

provide the opportunity for support facilities and parking for the Trail. A significant portion of this Trail has<br />

already been constructed by the city of St. Petersburg.<br />

H. North Bay Trail (6.3 miles) – Rio Vista Park <strong>to</strong> 1st Avenue South<br />

The Trail proceeds along the public right-of-way of 1st Street. This project will involve a modification of the<br />

four-lane roadway for inclusion of a separated bike path. In the vicinity of 22nd Avenue, the Trail will<br />

proceed through the Coffee Pot Bayou neighborhood and park in<strong>to</strong> the down<strong>to</strong>wn area of St. Petersburg.<br />

The Trail is within City public right-of-way for its entire length. The City is proceeding with the design of this<br />

Trail and has some partial funding for it.<br />

2


I. Down<strong>to</strong>wn Connection Trail (1.9 miles) – 1st St. <strong>to</strong> US 19/ 34th Street<br />

The Trail will first follow 1st Avenue South where a separated bikeway will be constructed along the south<br />

side. At 16th Street, the Trail will follow the CSX newly acquired corridor <strong>to</strong> U.S. 19. The city of St.<br />

Petersburg is actively pursuing the design and construction of this Trail with a 12 foot pathway be followed<br />

by a 5 foot pedestrian way when funds are available -- the existing school overpass for US 19 will be<br />

utilized <strong>to</strong> connect <strong>to</strong> the existing <strong>Pinellas</strong> Trail until funding can be obtained for a Trail overpass.<br />

J. Fred Marquis <strong>Pinellas</strong> Trail (34.5 miles) – U.S.19/34th Street <strong>to</strong> U.S. 19/Anclote River<br />

This is the original section of the <strong>Pinellas</strong> Trail which was constructed by <strong>Pinellas</strong> County in the early 1990s<br />

using the funding source of the Penny for <strong>Pinellas</strong>. The MPO has allocated significant federal funding for<br />

overpasses of major roads and for the Long Bayou crossing that connected St. Petersburg <strong>to</strong> Seminole.<br />

On the north at the Anclote River, the U.S. 19 improvement of several years ago incorporated an<br />

underpass for the <strong>Pinellas</strong> Trail providing the opportunity for the Trail <strong>to</strong> continue east<br />

K. East Avenue Upgrade <strong>to</strong> the <strong>Pinellas</strong> Trail (6 blocks) – Druid Road <strong>to</strong> Drew Street<br />

The current <strong>Pinellas</strong> Trail follows East Avenue on the east side as a wide sidewalk. The plan calls for<br />

conversion of this segment <strong>to</strong> be built like the other Trail areas. This is an active rail line area. The<br />

southbound lane of the road would be eliminated and the Trail would be expanded in<strong>to</strong> that area with<br />

adequate buffering <strong>to</strong> the rail line, while also providing for landscape opportunities. This project would also<br />

be important in that it would serve as an extension of the new city streetscape program on Cleveland Street<br />

in down<strong>to</strong>wn Clearwater.<br />

L. Jasmine/Melon Street Segment 0.8 miles) – U.S. 19 <strong>to</strong> Keys<strong>to</strong>ne Road<br />

The Trail proceeds from the underpass at U.S. 19 and follows public rights-of-way <strong>to</strong> Keys<strong>to</strong>ne Road. This<br />

segment has been recently constructed by <strong>Pinellas</strong> County. The Trail follows the Live Oak right-of-way <strong>to</strong><br />

Jasmine and proceeds on a separate pathway off that road <strong>to</strong> Melon, then proceeds on a separate pathway<br />

on that corridor <strong>to</strong> terminate on the north side of Keys<strong>to</strong>ne Road.<br />

M. Keys<strong>to</strong>ne Road Segment (3.0 miles) – Tarpon Springs City Park <strong>to</strong> East Lake Road<br />

The Trail is <strong>to</strong> be built as part of the Keys<strong>to</strong>ne Road highway improvement. That project is currently funded<br />

by <strong>Pinellas</strong> County and the design is being reconfigured based on recent cost increase issues. The Trail<br />

will be a separated pathway and is anticipated <strong>to</strong> be on the north side of the road. The segment will begin<br />

at Melon Street and will terminate on the west side of the intersection with East Lake Road. The Trail will<br />

use the signalized crossing <strong>to</strong> connect <strong>to</strong> the existing <strong>Pinellas</strong> Trail <strong>to</strong> the south.<br />

N. East Lake Road Segment (4.8 miles) – Keys<strong>to</strong>ne Road <strong>to</strong> Chesnut Park<br />

The Trail is a separate pathway and is an existing facility located on the west side of East Lake Road for its<br />

length. The Trail passes the entrance <strong>to</strong> Chesnut Park and terminates at the bridge for Brooker Creek.<br />

The <strong>to</strong>tal <strong>Pinellas</strong> Trail Loop mileage is 74.9 miles.<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!