06.02.2014 Views

Jim Freihaut: Greater Philadelphia Innovation Cluster (GPIC)

Jim Freihaut: Greater Philadelphia Innovation Cluster (GPIC)

Jim Freihaut: Greater Philadelphia Innovation Cluster (GPIC)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Goals<br />

Improve energy efficiency and operability and reduce carbon emissions of new and<br />

existing buildings.<br />

Stimulate private investment and quality job creation in the <strong>Greater</strong> <strong>Philadelphia</strong> region<br />

and beyond.


Establishing a Virtual, Vertically Integrated Product Delivery Industry<br />

from<br />

Traditionally Isolated Contributors<br />

Why Do This?


Energy Use by Sector<br />

SFC<br />

SFC = specific fuel consumption = unit desired result/fuel use, e.g. passenger mile/lbm primary fuel<br />

manufactured units/lbm primary fuel<br />

SFC<br />

1960 1980 2000<br />

Time 1960 1980 2000<br />

Time


No Improvements In Energy Efficiency; Degradation of Performance<br />

Present situation<br />

• 6% of Americans affected<br />

• 5,000 death per year in the US<br />

• 12.7 billion USD per year<br />

• Continues to increase<br />

Causes<br />

• Sensitization when exposure to certain nonvolatile<br />

chemical forms on indoor aerosols<br />

• Life style – 90% time spent indoors<br />

• Cities - Population concentration<br />

• Tight Construction


Slide: 7


Integrated Project Delivery


Co-Applicants<br />

• DOE Co-Applicant: Penn State<br />

– $122 million over 5 years<br />

• NIST Co-Applicant: DVIRC<br />

– $1.5 million over 3 years<br />

• SBA Co-Applicant: Wharton SBDC<br />

– $1.2 million over 4 years<br />

• EDA Co-Applicant: PIDC<br />

• -$5 million over 5 years<br />

DOE HUB Task Areas<br />

1. Tools for integrated design, verification, and modeling<br />

2. New components, sub-systems, and controls<br />

3. Public policy, behavior, economics, and business<br />

4. Education and workforce development<br />

5. Demonstration, deployment, and IP management<br />

Strategic t Market Focus<br />

Full-spectrum retrofit of existing average size commercial and<br />

multi-family residential buildings.<br />

Industrial Member Cost Share<br />

Bayer Material Science ,IBM, PPG ,<br />

Turner Construction, UTC<br />

~ $25 million over 5 years<br />

Pennsylvania State Funding<br />

Minimum $30 million Years 1-3<br />

Slide: 10


The Navy Yard<br />

$30 million of new Commonwealth capital funding for <strong>GPIC</strong> facilities<br />

270 existing buildings and new buildings that can be utilized as test beds<br />

Independently owned utilities including electric distribution grid<br />

Three new DOE research and education centers on site:<br />

DOE Mid-Atlantic Clean Energy Applications Center<br />

DOE Northern Mid-Atlantic Solar Training Center<br />

DOE GridStar Smart Grid Training Center<br />

Strategic location with easy access and support services<br />

Zone 4A climate that has four distinct seasons<br />

Slide: 11


HUB Physical Environment<br />

Entire Shipyard = District Systems Retrofit & Smart Grid Opportunity<br />

Single Bldg. Retrofit (HUB )<br />

Building Systems<br />

Research Building (New)<br />

Building Custer Retrofit CHP<br />

Dark Shaded Areas – Existing Buildings<br />

Lighter Shaded Areas – New Buildings<br />

• Location of existing energy and research centers<br />

• DOE Mid-Atlantic Clean Energy Applications Center<br />

• DOE Northern Mid-Atlantic Solar Training Center<br />

• DOE Grid Star Smart Grid


Building 661 Full Spectrum Energy Efficient Retrofit<br />

Two Navy Yard buildings to house HUB personnel<br />

Full-spectrum retrofit of historic Building 661<br />

New advanced integrated building sciences laboratory<br />

Living laboratories to transform the industry’s<br />

current fragmented serial process into system<br />

performance driven with integrated, parallel, team<br />

processes.<br />

Slide: 13


Integrated Design, Verification and Delivery Tools & Method<br />

Real Implementation Processes/Problems Drive Development<br />

Building 661<br />

Deep Retrofit to HUB Center<br />

New Laboratory Construction<br />

Slide: 14<br />

April 8, 2010<br />

BUSINESS SENSITIVE<br />

INFORMATION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!