06.02.2014 Views

Draft Study Plan Vol 1 (PDF) - Alaska Power and Telephone Company

Draft Study Plan Vol 1 (PDF) - Alaska Power and Telephone Company

Draft Study Plan Vol 1 (PDF) - Alaska Power and Telephone Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRAFT DOCUMENT<br />

the siphon pump <strong>and</strong> control house, <strong>and</strong> construction of a small dam in the drawdown<br />

trench to prevent flow through that cut when the lake level is high. The saddle dam<br />

would be about 10 feet high <strong>and</strong> constructed of rock fill with an upstream concrete face.<br />

All equipment, materials, <strong>and</strong> personnel for the intake <strong>and</strong> saddle dam construction would<br />

be transported by helicopter to the intake site from a staging area near the powerhouse.<br />

Figure 1: Project Location <strong>and</strong> Features<br />

<strong>Draft</strong> <strong>Study</strong> <strong>Plan</strong> – June 2012 p. 2 Connelly Lake Hydroelectric Project

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!