DRAFT DOCUMENT<br />

5.1 PREVIOUS STUDIES<br />

5.0 DRAFT STUDY PLAN<br />

Previous Studies Conducted<br />

Stream gaging – the USGS installed a stream gage at the outlet of Connelly Lake<br />

in July 1993 <strong>and</strong> collected data for slightly over one year. ADF&G is currently<br />

gaging at or near the outlet of Chilkoot Lake for the past several years; which will<br />

end in 2013. GLH installed a stream gage at the Connelly Lake outlet in<br />

September 2011 <strong>and</strong> a stream gage just above the Connelly Creek confluence with<br />

the Chilkoot River in May 2012.<br />

<br />

<br />

<br />

<br />

<br />

Water temperature – a temperature datalogger was placed in the Chilkoot River<br />

below Connelly Creek’s confluence with the river <strong>and</strong> with the stream gage at the<br />

Connelly Lake outlet.<br />

Fish habitat survey – conducted by ADF&G in 1995 through a contract with<br />

Haines Light & <strong>Power</strong>, the utility at that time. No fish were found in Connelly<br />

Lake or in the outlet stream down to the Chilkoot River. Fish surveys were<br />

conducted between September 25 <strong>and</strong> September 28, 2011, by The Shipley<br />

Group, a contractor for GLH. The surveys took place along the access road<br />

streams <strong>and</strong> above Chilkoot Lake. At the time of these surveys ADF&G was also<br />

surveying the Chilkoot River Valley above Chilkoot Lake.<br />

Geotechnical survey – a preliminary geotech survey was conducted in 1993 <strong>and</strong><br />

found that:<br />

o The dam axis is characterized by massive, relatively solid diorite bedrock<br />

at each abutment. Between the abutments, an overburden of boulders,<br />

peat, <strong>and</strong> s<strong>and</strong> were found to a depth of up to 36-inches.<br />

o The powerhouse site (upper riverside site [Northerly]) is situated on an<br />

inactive floodplain terrace. The upper 2’ of soil consists of clean s<strong>and</strong>,<br />

which is underlain by s<strong>and</strong>y gravel <strong>and</strong> the terrace as seen in a riverbank<br />

cut consists of dense course gravel in a s<strong>and</strong> matrix. The terrace soil abuts<br />

steeply sloping diorite bedrock which would be a good source of borrow<br />

for rip rap <strong>and</strong> embankment construction.<br />

Hydrology evaluation – a preliminary evaluation to determine average annual<br />

<strong>and</strong> average monthly stream flow for energy production was made in 1993.<br />

Figure 8 above shows the difference between the Chilkoot River drainage <strong>and</strong><br />

Connelly Lakes drainage, which is significantly smaller. The PAD also contains a<br />

table comparing the Connelly Lake USGS gage data with ADF&G gage data at<br />

the river mouth <strong>and</strong> correlation with other nearby drainages. The hydrology<br />

evaluation will continue until more gage data is collected.<br />

Baseline environmental assessment – The USF&WS, 29 helped us narrow down<br />

the TEC species we need to evaluate for this document. We were advised to<br />

29 Personal e-mail communication with Steve Brockman, USF&WS, on March 8, 2012.<br />

<strong>Draft</strong> <strong>Study</strong> <strong>Plan</strong> – June 2012 p. 40 Connelly Lake Hydroelectric Project