SCANA ANALYST DAY<br />
April 8, 2010<br />
V.C. <strong>Summer</strong><br />
A Proven Track Record of Success<br />
Jeff Archie<br />
Sr. VP Nuclear Operations,<br />
SCE&G
SCANA ANALYST DAY<br />
April 8, 2010<br />
Fairfield<br />
Pumped<br />
Storage<br />
VCS<br />
Spoils Area<br />
Parr Reactor<br />
Site<br />
Parr Hydro<br />
2
3<br />
SCANA ANALYST DAY<br />
April 8, 2010
History of Nuclear Excellence<br />
SCANA ANALYST DAY<br />
April 8, 2010
Prototype for Nuclear Power Plants<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
5
Decommissioning of Parr Reactor<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
1960 1966<br />
2006 2009<br />
6
Parr: June 2009<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
7
Parr: September 2009<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
8
26 Years of Successful Performance<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• V.C. <strong>Summer</strong> has generated approximately 172,766 GWh<br />
(through 2009), enough energy to supply the state of<br />
South Carolina for 2 years.<br />
• V.C. <strong>Summer</strong> set a continuous run record in 2009 by<br />
operating nonstop for 475 consecutive days.<br />
• V.C. <strong>Summer</strong> continues to receive excellent reviews<br />
through industry peer review processes.<br />
9
SCANA ANALYST DAY<br />
April 8, 2010<br />
People and Experience<br />
10
Longevity and Loyalty<br />
• Average age of Unit 1 employees : 47<br />
• Average age of New Nuclear Deployment (NND)<br />
employees: 41<br />
(38 percent of NND employees are younger than 35)<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
11
Longevity and Loyalty<br />
• Average years of service for Unit 1 employees: 16<br />
• Number of employees at NND who worked at<br />
Unit 1 during construction: 12<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
12
Commitment to Continuous Learning<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
AP1000 Simulator<br />
©2010 Westinghouse Electric Company LLC<br />
Nuclear Learning Center<br />
Unit 1 Simulator<br />
13
Commitment to Continuous Learning<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• Donated $100,000 to Midlands Tech Quick Jobs Center<br />
• Started an internship program in 2008 for Fairfield County high school<br />
students<br />
• Partnered with Midlands Tech to develop a two-year associate degree<br />
program for non-licensed operators<br />
• Established longtime partnerships with institutions of higher learning:<br />
• Midlands Tech, Aiken Tech, Spartanburg Tech, and York Tech<br />
• Health physics<br />
• Mechanical maintenance<br />
• Health maintenance<br />
• Clemson, S.C. State University, and University of South Carolina<br />
• <strong>Summer</strong> internship program in engineering and health<br />
physics<br />
• Pipeline to meet demands of the new nuclear workforce<br />
14
SCANA ANALYST DAY<br />
April 8, 2010<br />
Stakeholder Support<br />
15
Economic Boost to Fairfield County<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• SCE&G paid $21.2 million for V.C. <strong>Summer</strong> in property taxes<br />
to Fairfield County in 2010.<br />
• Third highest of all county tax payments<br />
• About 54 percent dedicated to schools<br />
• SCE&G has paid $287 million in property taxes for V.C.<br />
<strong>Summer</strong> since 1984.<br />
16
Local Support<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
17
State Support<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• Seven nuclear reactors at four sites in South Carolina<br />
account for more than 50 percent of the electricity<br />
generated in the state.<br />
• The South Carolina General Assembly enacted the Base<br />
Load Review Act in 2007.<br />
• The Public Service Commission voted 7-0 in February<br />
2009 to approve SCE&G and Santee Cooper’s<br />
new nuclear project.<br />
18
SCANA ANALYST DAY<br />
April 8, 2010<br />
Committed to Doing What’s Right<br />
19
The SCANA Way<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
Analyst Day 2009<br />
• Being transparent<br />
• Keeping lines of communication open<br />
• Maintaining commitment to the mission<br />
20
Increasing Awareness<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
“The tour left no doubt that the people who run V.C. <strong>Summer</strong><br />
are very serious about how they do business. … Nuclear is<br />
gaining the upper hand over coal on the road to the future.”<br />
The Columbia Free Times<br />
July 22, 2009<br />
21
Spirit of Cooperation<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
The spirit of cooperation among utilities during storms is the<br />
daily norm in the nuclear industry where a philosophy of<br />
continuous collaboration and resource sharing is embraced.<br />
22
Close Collaborations<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• Santee Cooper<br />
• Joint owner of Unit 1<br />
• Partner for new nuclear project<br />
• Industry Partners<br />
• INPO-Institute of Nuclear Power Operators<br />
• NEI-Nuclear Energy Institute<br />
• NPOC-New Plant Oversight Committee<br />
• NPWG-New Plant Working Group<br />
• APOG-AP1000 Owner’s Group<br />
• NuStart-Consortium for new nuclear energy<br />
development<br />
• CDSV-Carolina Power, Duke, SCE&G, and Virginia Power<br />
23
Keeping Stakeholders Informed<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• Community Coalition<br />
• Community Newsletter<br />
• Speaking Engagements<br />
• Tours with Government<br />
Officials<br />
• NND Panel Discussions<br />
• Media Relations<br />
• Analyst Day<br />
24
SCANA ANALYST DAY<br />
April 8, 2010<br />
Risk Differences<br />
Today vs 70’s & 80’s<br />
Ron Clary<br />
VP, New Nuclear Deployment,<br />
SCE&G
New Licensing Process<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
26
Design Finalization<br />
70s / 80s<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
Today<br />
• Unique Plant Design<br />
• Minimal engineering<br />
complete prior to start of<br />
construction<br />
• Construction planning was<br />
ineffective due to lack of<br />
engineering details<br />
• Standard Plant Design<br />
• >98% complete when<br />
construction begins<br />
• Better construction<br />
planning<br />
27
Design Finalization<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
70s / 80s<br />
• Considerable construction<br />
rework<br />
• Late equipment<br />
procurements led to<br />
construction work arounds<br />
• Many design changes due to<br />
changing NRC requirements<br />
Today<br />
• Reduced construction<br />
rework due to design<br />
changes<br />
• Allows earlier equipment<br />
procurement for open<br />
top installation<br />
• One step licensing limits<br />
NRC changes<br />
28
Technology<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
70s / 80s<br />
• In-situ (in place)<br />
construction<br />
• Pen & ink manual<br />
drafting with concurrent<br />
overlapping system<br />
design<br />
Today<br />
• Modular construction<br />
techniques<br />
– Crane technology<br />
– Computerized<br />
Measurements<br />
• Computer aided<br />
engineering & design<br />
29
Technology<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
70s / 80s<br />
• Manual stick welding<br />
– Less quality control<br />
– Higher reject rate<br />
• Slow, labor-intensive main<br />
frame computer project<br />
management systems<br />
Today<br />
• Automated welding<br />
– Tooling<br />
– Equipment<br />
– Materials<br />
• State of the art<br />
computer scheduling<br />
and project controls<br />
software<br />
30
China Lessons Learned<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• Design<br />
– Changes required in China are being factored into US<br />
designs<br />
• Construction<br />
– Solutions to construction difficulties in China are being<br />
factored into US designs<br />
– Module construction techniques are being refined<br />
• Startup<br />
– Initiating exchange program<br />
31
China Lessons Learned<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
China Images are<br />
copyrighted and are<br />
courtesy of<br />
Westinghouse<br />
Electric Company,<br />
LLC<br />
Haiyang CA-20 module lift<br />
32
Sanmen CV Transport<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
China Images are copyrighted and are courtesy of Westinghouse<br />
Electric Company, LLC<br />
33
Sanmen CA-04 Module<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
China Images are copyrighted and are courtesy of Westinghouse Electric Company, LLC<br />
34
Containment Vessel Ring Lift at Sanmen<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
China Images are copyrighted and are courtesy of Westinghouse Electric Company, LLC<br />
35
Containment Vessel Ring Lift at Sanmen<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
China Images are copyrighted and are courtesy of Westinghouse Electric Company, LLC<br />
36
Containment Vessel Ring Lift at Sanmen<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
China Images are copyrighted and are courtesy of Westinghouse Electric Company, LLC<br />
37
SCANA ANALYST DAY<br />
April 8, 2010<br />
VC <strong>Summer</strong> Major Equipment<br />
Status<br />
38
Reactor Vessel<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
39
Manufacturing Schedules – 2/17/2010<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
40<br />
2009 2010 2011 2012 2013 2014<br />
U2 & U3-Reactor Coolant Loop Piping<br />
Unit 2-Accumulators<br />
Unit 2-Turbine Generator<br />
Unit 3-Turbine Generator<br />
(Complete April 2015)<br />
Unit 2-RCPs<br />
Unit 3-RCPs (Complete June 2015)<br />
Unit 3- Accumulators<br />
U2- Core Makeup Tanks U 3- Core Makeup Tanks<br />
Unit 2-Pressurizer<br />
Unit 3-Pressurizer<br />
Unit 2-Steam Generators<br />
Unit 3-Steam Generators- (Complete Feb 2015)<br />
Unit 2-Reactor Vessel<br />
Unit 3-Reactor Vessel<br />
RCP VFD Testing<br />
Unit 2-RCP VFDs<br />
Unit 3-RCP VFDs<br />
Unit 2-Containment Vessel<br />
Unit 3-Containment Vessel<br />
Unit 2-Integrated Head Package<br />
Unit 3-Integrated Head Package (Complete April 2015)<br />
Unit 2-Squib Valves<br />
Unit 3-Squib Valves<br />
Unit 2-CRDMs<br />
Unit 3-CRDMs
SCANA ANALYST DAY<br />
April 8, 2010<br />
Modular Construction<br />
William A. Fox, III, P.E.,<br />
VP & Project Director,<br />
Shaw Power, Nuclear Division
SMS Progress<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
January 2010<br />
42
Shaw Modular Solutions<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
January, 2010<br />
43
Modular Construction Experience<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• Shipbuilding industry<br />
– Large ships<br />
– Submarines<br />
• Advanced nuclear<br />
construction<br />
– GE<br />
– Areva<br />
– Toshiba<br />
– Shaw/Westinghouse<br />
• Shaw<br />
Fossil/Petrochemical<br />
construction<br />
– Numerous plants built<br />
in the US in the last 10<br />
years<br />
44
Shaw Transporting Large Module to Foundation<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
45
Shaw Modular Construction Video<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
Watch the Shaw Modular Construction Video (Windows Media, 88MB)<br />
46
SCANA ANALYST DAY<br />
April 8, 2010<br />
New Nuclear<br />
Current Project Status<br />
Steve Byrne<br />
Exec. VP Gen & Chief Nuclear Officer,<br />
SCE&G
Licensing Process<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
COLA<br />
March 2008<br />
Safety<br />
Review<br />
Environmental<br />
Review<br />
RAI’s<br />
RAI’s<br />
ACRS<br />
Draft<br />
EIS<br />
FSER<br />
FEIS<br />
Feb<br />
2011<br />
COL<br />
Mandatory<br />
Hearing<br />
Construction<br />
48
Intervention Update<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• BLRA application supported by Office of Regulatory Staff (ORS)<br />
• PSC hearing in December ‘08 – State intervention<br />
– Positive decision by 7-0 vote Feb ’09<br />
– SC Supreme Court heard FOE appeal March 4<br />
– SC Supreme Court heard SCEU appeal April 6<br />
• PSC hearing Nov ‘09 schedule rebaseline<br />
• Environmental public meetings - Local intervention<br />
– Jan ’09 Jenkinsville & Winnsboro<br />
• ASLB – Federal intervention<br />
– Same interveners as PSC hearings<br />
– Ruling Feb ‘09 – no admissible contentions<br />
– Appealed by Sierra Club, Part reversal by NRC<br />
– No admissible contentions March 2010<br />
– Appeal by Sierra Club<br />
49
Overview of Key Provisions<br />
of SCE&G’s BLRA Reporting<br />
Total Project Costs<br />
(includes escalation & contingency)<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
$12,000,000,000<br />
$10,000,000,000<br />
$10.6B<br />
$9.8B<br />
$8,000,000,000<br />
$6,000,000,000<br />
$5.6B<br />
Budget<br />
Projection<br />
$4,000,000,000<br />
$2,000,000,000<br />
$0<br />
$1.1B<br />
(budget)<br />
$913M (actual)<br />
Actual<br />
Committed<br />
2007<br />
2008<br />
2009<br />
2010<br />
2010<br />
2011<br />
2012<br />
2013<br />
2013<br />
2014<br />
2015<br />
2016<br />
2016<br />
2017<br />
2018<br />
2019<br />
50
Overview of Key Provisions<br />
of SCE&G’s BLRA Reporting<br />
Total Project Costs<br />
(2007 $'s w/ contingency)<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
$8,000,000,000<br />
$7,000,000,000<br />
$7.6B<br />
$7.6B<br />
$6,000,000,000<br />
$5,000,000,000<br />
$4,000,000,000<br />
$4.6B<br />
Budget<br />
Projection<br />
$3,000,000,000<br />
$2,000,000,000<br />
$1B<br />
(budget)<br />
Actual<br />
Committed<br />
$1,000,000,000<br />
$0<br />
$872M (actual)<br />
2007<br />
2008<br />
2009<br />
2010<br />
2010<br />
2011<br />
2012<br />
2013<br />
2013<br />
2014<br />
2015<br />
2016<br />
2016<br />
2017<br />
2018<br />
2019<br />
51
Project Personnel<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
• SCANA has 77 NND personnel on-site<br />
• Shaw has 397 personnel on-site<br />
• 225 Shaw Subcontractor personnel on-site<br />
• 170 Westinghouse/Shaw personnel home office<br />
• 1,000,000 safe man-hours in January 2010<br />
52
53<br />
SCANA ANALYST DAY<br />
April 8, 2010
Aerial View of Site – November 2008<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
NND<br />
Building
Aerial View of Site – March 2009<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
NND<br />
Building
VC <strong>Summer</strong> Site – January 2010<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
VCS Units<br />
2&3<br />
VCS<br />
Unit 1<br />
Construction<br />
City<br />
NND<br />
Building
VC <strong>Summer</strong> Site – January 2010<br />
VCS Units<br />
2&3<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
Equipment<br />
Laydown<br />
Area<br />
Warehouse<br />
Area<br />
Construction<br />
Offices
VC <strong>Summer</strong> Site – January 2010<br />
Equipment<br />
Laydown Area<br />
Mayo<br />
Creek<br />
Bridge<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
Warehouse<br />
Areas<br />
Construction<br />
Offices – Phase 1
Unit 2 Power Block Excavation<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
59
Unit 2 Power Block Excavation<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
60
CWS Pipe Installation<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
61
South Abutment Diaphragm Pour Mayo Creek Bridge<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
62
Mayo Creek Bridge<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
63
Warehouse 20A<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
64
Batch Plant Area/Equipment<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
65
Generation Mix<br />
SCANA ANALYST DAY<br />
April 8, 2010<br />
Current Generation Mix<br />
2019 Generation Mix<br />
Hydro 4%<br />
Biomass<br />
1.4%<br />
Hydro 3%<br />
Biomass<br />
1.4% Gas 7%<br />
Nuclear<br />
18%<br />
Coal 50%<br />
Gas 26%<br />
Nuclear<br />
55%<br />
Coal 34%<br />
Non-emitting<br />
23.4%<br />
As of December 31, 2009<br />
Nonemitting<br />
59.4%<br />
66