07.02.2014 Views

General Catalogue Components for solar systems 2013_ENG - Orkli

General Catalogue Components for solar systems 2013_ENG - Orkli

General Catalogue Components for solar systems 2013_ENG - Orkli

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SELECTION GUIDE<br />

The Drain-Unit selection is determined by the height of the installation. Bear in mind the difference in height<br />

between the top of the collector array and the bottom part of the Drain-Unit positioning.<br />

N.b.: less pump power required if the Drain-Unit is installed just above the collector field.<br />

HEIGHT OF INSTALLATION* 3-5 metres 5-10 metres 10-15 metres 3- 10 metres 10-15 metres<br />

RECOMMENDED MODEL 6-metre pumps 6-metre + 6-metre pumps 11 + 6-metre pumps 11-metre pumps 11 + 6-metre pumps<br />

ECONOMY MODEL 6-metre pumps 11-metre pumps Unfit 11-metre pumps 11 + 6-metre pumps<br />

NUMBER OF COLLECTORS** 1-5 1-4 1-4 4-10 4-8<br />

*Height from the top of the <strong>solar</strong> collectors to the lowest point of the drain unit<br />

**Calculated <strong>for</strong> a collector capacity of 1.25 litres and tube 15 mm.<br />

It can be used with installations that have a larger number of collectors than other market alternatives.<br />

The volume of the circuit above the drain unit must not exceed 8 litres of working volume of the air<br />

separator in drain units with a single tank (or 16 litres <strong>for</strong> drain units with 2 tanks).<br />

Volume calculation in upper part: Volume Nº of collectors Volume of fluid<br />

= +<br />

+<br />

in collector<br />

Volume<br />

of pipes<br />

Solar heating<br />

<strong>systems</strong><br />

03<br />

DRAIN UNIT WITH INTEGRATED REGULATION<br />

• Maximum operating temperature: 110ºC.<br />

• Maximum peaks: 130ºC.<br />

• Safety valve calibration: 3 bar.<br />

• Flow indication range: 2-12 litres/min.<br />

• Maximum separation volume: 8 litres.<br />

• Connections: bicone nut <strong>for</strong> a Cu15mm o ½”M pipe.<br />

• Control options with pre-connections made.<br />

• Consult <strong>for</strong> adaptability to other regulations.<br />

TWO 6-metre PUMPS<br />

PUMPS REGULATION ARTICLE €<br />

6 metres + 6 metres Basic (3 sensors, 1 relay) 74110BA<br />

6 metres + 6 metres Vision (6 sensors, 3 relays) 74110VI<br />

Tel.: +34 943 80 94 80 Fax: +34 943 80 52 41 www.orkli.com<br />

95

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!