General Catalogue Components for solar systems 2013_ENG - Orkli
General Catalogue Components for solar systems 2013_ENG - Orkli
General Catalogue Components for solar systems 2013_ENG - Orkli
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SELECTION GUIDE<br />
The Drain-Unit selection is determined by the height of the installation. Bear in mind the difference in height<br />
between the top of the collector array and the bottom part of the Drain-Unit positioning.<br />
N.b.: less pump power required if the Drain-Unit is installed just above the collector field.<br />
HEIGHT OF INSTALLATION* 3-5 metres 5-10 metres 10-15 metres 3- 10 metres 10-15 metres<br />
RECOMMENDED MODEL 6-metre pumps 6-metre + 6-metre pumps 11 + 6-metre pumps 11-metre pumps 11 + 6-metre pumps<br />
ECONOMY MODEL 6-metre pumps 11-metre pumps Unfit 11-metre pumps 11 + 6-metre pumps<br />
NUMBER OF COLLECTORS** 1-5 1-4 1-4 4-10 4-8<br />
*Height from the top of the <strong>solar</strong> collectors to the lowest point of the drain unit<br />
**Calculated <strong>for</strong> a collector capacity of 1.25 litres and tube 15 mm.<br />
It can be used with installations that have a larger number of collectors than other market alternatives.<br />
The volume of the circuit above the drain unit must not exceed 8 litres of working volume of the air<br />
separator in drain units with a single tank (or 16 litres <strong>for</strong> drain units with 2 tanks).<br />
Volume calculation in upper part: Volume Nº of collectors Volume of fluid<br />
= +<br />
+<br />
in collector<br />
Volume<br />
of pipes<br />
Solar heating<br />
<strong>systems</strong><br />
03<br />
DRAIN UNIT WITH INTEGRATED REGULATION<br />
• Maximum operating temperature: 110ºC.<br />
• Maximum peaks: 130ºC.<br />
• Safety valve calibration: 3 bar.<br />
• Flow indication range: 2-12 litres/min.<br />
• Maximum separation volume: 8 litres.<br />
• Connections: bicone nut <strong>for</strong> a Cu15mm o ½”M pipe.<br />
• Control options with pre-connections made.<br />
• Consult <strong>for</strong> adaptability to other regulations.<br />
TWO 6-metre PUMPS<br />
PUMPS REGULATION ARTICLE €<br />
6 metres + 6 metres Basic (3 sensors, 1 relay) 74110BA<br />
6 metres + 6 metres Vision (6 sensors, 3 relays) 74110VI<br />
Tel.: +34 943 80 94 80 Fax: +34 943 80 52 41 www.orkli.com<br />
95