A member asked if there are any advantages or disadvantages in<br />

investing at this time.<br />

o The consultant indicated that this is an excellent time to develop a<br />

solar array, due to costs being low.<br />

A member added that URS assisted the District to prepare a grant funding<br />

request to the State Energy Conservation Office (SECO) which resulted in<br />

an award of close to $1M in grant funding and in kind-services.<br />

At the conclusion of the Solar Power presentation Curt Shaw, Director of<br />

Construction Management, went on to provide the status of information being<br />

received from the Individual Campus Plans and that 80% of the plans had been<br />

received. He outlined how the plan was to meet with the Associate Superintendents<br />

and begin vetting the requests. He outlined the considerations received to date,<br />

which included:<br />

‣ Space considerations<br />

‣ Educational adequacy<br />

‣ Special Projects<br />

<br />

<br />

<br />

<br />

The committee asked if there were any trends noted in the Individual Campus<br />

Plans.<br />

o Mr. Shaw said that Innovation Stations were being requested routinely.<br />

A member asked if the feedback from the vertical teams would be included in<br />

the consideration.<br />

o This information will be included in the process. The hope is to identify<br />

any signature programs that may be possible. This process will be driven<br />

from the top down and the Associate Superintendents will assist in making<br />

those determinations.<br />

o The intent is to provide enough support to make the all the signature<br />

programs equal and perhaps in future bond elections, there may be<br />

focus on specific signature programs.<br />

A committee member asked for clarification on vertical teams and how the<br />

committee would consider each item, and;<br />

With 18% outstanding, it is critical to receive the Individual Campus Plans<br />

from each campus.<br />

o Mr. Shaw indicated staff was contacting each school principal to<br />

complete the Individual Campus Plan.<br />

o In anticipation of items included in the ICPs, staff has set aside a<br />

placeholder in the amount of $30M to address the funding.<br />

<br />

<br />

A member asked for a report on underutilized schools and justification for<br />

building new schools, when there were schools identified for closure in the<br />

Superintendent’s Facility Master Plan Workgroup.<br />

Also a report was requested on the schools on the closure list and how space is<br />

being used at those schools now.<br />