final book.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7 1996-97 640.631 16 2005-06 1239.160<br />
8 1997-98 534.148 17 2006-07 965.740<br />
9 1998-99 1226.897<br />
Table-3: Surplus Waters of Godavari River at Dowlaiswaram Barrage<br />
(During Calendar Year January to December)<br />
SN Year TMC fts SN Year TMC fts<br />
1 1976 2660.224 17 1992 3311.210<br />
2 1977 2322.132 18 1993 1993.792<br />
3 1978 4081.008 19 1994 5959.230<br />
4 1979 20101.018 20 1995 3428.270<br />
5 1980 305.570 21 1996 2140.120<br />
6 1981 3331.307 22 1997 1468.630<br />
7 1982 1677.824 23 1998 2906.870<br />
8 1983 4879.689 24 1999 3407.690<br />
9 1984 1818.991 25 2000 3177.290<br />
10 1985 1744.705 26 2001 2884.360<br />
11 1986 3213.372 27 2002 1733.090<br />
12 1987 1557.242 28 2003 2985.810<br />
13 1988 4800.838 29 2004 1674.480<br />
14 1989 3460.989 30 2005 3447.080<br />
15 1990 7094.014 31 2006 4834.780<br />
16 1991 2579.641<br />
Note: Nearly 760 TMCft of allocated water (75 per cent dependability) is yet to be utilized by<br />
Andhra Pradesh.<br />
The tragedy of lands, crying for water close to rivers carrying vast quantities of water uselessly<br />
to the sea, must have been the cause of deep anguish to many of the farmers who are<br />
suffering for want of water since so many decades. Dr.YSR during his Padayathra who<br />
interacted with rural population rightly observed about the needs of water and power and<br />
determined that “Needless waste of water should be prevented and efficient utilization<br />
encouraged” This fact may be the main reason for launching of “Jalayagnam”scheme. For<br />
new schemes proposed in Kishna basin for needy areas, supplementation with waters of<br />
Godavari by diversion to Krishna basin by means of Polavaram multipurpose project and<br />
Pulichinthala schemes, so as to dispell the doubts of existing ayacutdars below Nagarjuna<br />
Sagar in Krishna basin who are opposing the new schemes proposed on Krishna river. The<br />
dependence on Krishna waters for ayacut of Nagarjuna Sagar Project can be minimized by<br />
making available Godavari waters to them.<br />
Regarding high cost of project<br />
One who studies regular visits of famine and drought situation in Pennar basin and in<br />
certain upper reaches is Krishna basin, and also flood havocs once in a while, making out of<br />
now irrigation projects for sustenance of people in the drought prone areas is most effective.<br />
<br />
17