EXECUTIVE SUMMARY AND JOB PROFILE - Avalon Rare Metals
EXECUTIVE SUMMARY AND JOB PROFILE - Avalon Rare Metals
EXECUTIVE SUMMARY AND JOB PROFILE - Avalon Rare Metals
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>EXECUTIVE</strong> <strong>SUMMARY</strong> & POSITION DESCRIPTION<br />
CLIENT:<br />
POSITION:<br />
POSITION LOCATION:<br />
REPORTING TO:<br />
<strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> Inc. – www.avalonraremetals.com<br />
(TSX & NYSE AMEX : AVL)<br />
Resource Geologist<br />
Delta, BC including extensive travel to Site (Thor Lake – NWT) and Corporate office<br />
Senior Geologist<br />
COMPANY OVERVIEW:<br />
<strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> Inc. is a mineral exploration and development company focused on rare metals deposits in Canada.<br />
Its flagship project, the 100%-owned Nechalacho Deposit, Thor Lake, NWT, is emerging as one of the largest<br />
undeveloped rare earth elements resources in the world. Its exceptional enrichment in the more valuable 'heavy' rare<br />
earth elements, which are key to enabling advances in green energy technology and other growing high-tech<br />
applications, is one of the few potential sources of these critical elements outside of China, currently the source of 95%<br />
of world supply.<br />
The Thor Lake Property is located at Thor Lake in the Mackenzie Mining District of the Northwest Territories, about 5 km<br />
north of the Hearne Channel of Great Slave Lake and approximately 100 km southeast of the city of Yellowknife.<br />
Historically at the Pine Point area as the site was chosen for its full all year round accessibility. <strong>Avalon</strong> proposes to mine,<br />
mill and produce rare earth oxides, zirconium, niobium and tantalum oxides, and possibly gallium from the Nechalacho<br />
deposit, located on its Thor Lake Property. The proposed project is referred to as the Thor Lake Project (TLP).<br />
Approximately 12 million tonnes of probable reserves will be mined from the Nechalacho deposit over a period of<br />
approximately 20 years of operations with the likelihood of an increase in schedule. Construction will begin immediately<br />
upon receipt of permits and financing, and reclamation activities will commence following cessation of all operations and<br />
continue for a period of approximately three years.<br />
The proposed TLP has two site components: an underground mine and flotation plant (Nechalacho Mine and Flotation<br />
Plant site), to be located at the Thor Lake Property, and a hydrometallurgical plant (Hydrometallurgical Plant site) to be<br />
located at the existing brownfields site of the former Pine Point Mine, 85 km east of Hay River, NT on the sou th shore of<br />
Great Slave Lake.<br />
<strong>Rare</strong> earth elements (REEs) will be mined underground at a rate of 2,000 tpd and concentrated at the Nechalacho Mine<br />
and Flotation Plant site. The resulting REE concentrates will be barged across the east end of Great Slave La ke to the<br />
Hydrometallurgical Plant site. Upon arrival, the concentrate will be transported from the south shore of Great Slave Lake<br />
to the Hydrometallurgical Plant site via a haul road. The concentrate will be further processed at the Hydrometallurgical<br />
Plant. The resulting final products will be hauled to the Hay River railhead via truck, and direct shipped to <strong>Avalon</strong>’s<br />
separation facility.<br />
Flotation Plant: The process to produce the REE concentrate will involve conventional grinding, crushing and flotation<br />
techniques. Processing facilities will include a Flotation Plant that will produce a high grade concentrate that will be<br />
barged off-site to the proposed Hydrometallurgical Plant site for secondary processing.<br />
Hydrometallurgical Plant: The proposed Hydrometallurgical Plant will further process the REE concentrates from the<br />
Nechalacho Mine and Flotation Plant. The process will include acid baking, caustic cracking, water washing, filtration,<br />
caustic regeneration and evaporation, double salt precipitation, solvent extraction and product drying facilities to produce<br />
direct ship products.<br />
A full description of the project and the permitting process is available from the Review board and Mackenzie Valley Land<br />
and Water Board (MVLWB) public registry under <strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> at:<br />
www.mvlwb.ca and http://www.mvlwb.ca/mv/reg.aspx?app=MV2010D0017 & MV2010L2-0005.<br />
<strong>Avalon</strong> is well funded, has no debt and its work programs are progressing steadily.<br />
environmental stewardship are corporate cornerstones.<br />
Social responsibility and
POSITION OVERVIEW:<br />
This is a full time position reporting to Senior Resource Geologist. The Resource Geologist will provide full time support<br />
to the Geology team and is accountable for undertaking tasks relating to the implementation and on-going maintenance<br />
of a geological database, QAQC procedures and 3D modeling. You will have specific experience in earth or rare earth<br />
geology, sampling and quality, exploration programme management in open-cut and underground minerals, mining law,<br />
geophysical exploration methods, including wire-line geophysical log and seismic interpretation skills, deposit modelling<br />
and evaluation skills. A good general knowledge of open-cut and underground mining geotechnics will also be required.<br />
PRIMARY RESPONSIBILITIES:<br />
This position will be based in Delta, BC with extensive travel to and from the Project – Thor Lake Project located in The<br />
Northwest Territories. This position will be responsible for providing leadership and working with vendors to implement<br />
and maintain databases.<br />
This position is accountable for providing input into 3D model and assisting with digital input of data into model and<br />
database. Provide assistance to site personnel with respect to database and model software. Liaise between various key<br />
personnel to ensure that goals are met. Prepare cross sections, plans etc. to facilitate diamond drill program.<br />
Provide assistance on structural component of program. Measure characteristics of the Earth, such as gravity and<br />
magnetic fields, using equipment such as seismographs, gravimeters, torsion balances, and magnetometers. Test<br />
industrial earths and abrasives, soil, or rocks in order to determine their geological characteristics, using optical, x-ray,<br />
heat, acid, and precision instruments.<br />
Prepare geological maps, cross-sectional diagrams, charts, and reports concerning mineral extraction, land use, and<br />
resource management, using results of field work and laboratory research. Analyze and interpret geological,<br />
geochemical, and geophysical information from sources such as survey data, well logs, boreholes, and aerial photos.<br />
The above duties and responsibilities are representative of the nature and level of work assigned and are not necessarily<br />
all-inclusive. Travel to site including to corporate and operational offices as required. Perform any additional duties as<br />
required.<br />
QUALIFICATIONS:<br />
Minimum GIT or BSc Degree in Geology<br />
Minimum 1-2 years’ underground mining experience<br />
Strong team player and problem solver<br />
Experience with modeling/QA/QC and Minesite is an absolute asset<br />
Experience with Resource modeling software is an absolute asset<br />
Learn resource modeling<br />
Experience in managing internal databases<br />
Demonstrate and Manage QA/QC from site to model<br />
Previous experience working with Aboriginal communities is an asset.<br />
Strong computer skills (e.g. MS Office including Excel and Word) are essential.<br />
Excellent written and verbal skills<br />
Able and flexible to work rotational work schedules. Rotations will be discussed as the Project develops.<br />
OTHER:<br />
Based in Delta, BC and may work rotational shifts during exploration and operational season. The rotations will be<br />
discussed upon successful hire and may change as the Project develops.<br />
<strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> offers total rewards compensation, with a comprehensive benefits package.<br />
www.avalonraremetals.com