12.02.2014 Views

EXECUTIVE SUMMARY AND JOB PROFILE - Avalon Rare Metals

EXECUTIVE SUMMARY AND JOB PROFILE - Avalon Rare Metals

EXECUTIVE SUMMARY AND JOB PROFILE - Avalon Rare Metals

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>EXECUTIVE</strong> <strong>SUMMARY</strong> & POSITION DESCRIPTION<br />

CLIENT:<br />

POSITION:<br />

POSITION LOCATION:<br />

REPORTING TO:<br />

<strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> Inc. – www.avalonraremetals.com<br />

(TSX & NYSE AMEX : AVL)<br />

Resource Geologist<br />

Delta, BC including extensive travel to Site (Thor Lake – NWT) and Corporate office<br />

Senior Geologist<br />

COMPANY OVERVIEW:<br />

<strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> Inc. is a mineral exploration and development company focused on rare metals deposits in Canada.<br />

Its flagship project, the 100%-owned Nechalacho Deposit, Thor Lake, NWT, is emerging as one of the largest<br />

undeveloped rare earth elements resources in the world. Its exceptional enrichment in the more valuable 'heavy' rare<br />

earth elements, which are key to enabling advances in green energy technology and other growing high-tech<br />

applications, is one of the few potential sources of these critical elements outside of China, currently the source of 95%<br />

of world supply.<br />

The Thor Lake Property is located at Thor Lake in the Mackenzie Mining District of the Northwest Territories, about 5 km<br />

north of the Hearne Channel of Great Slave Lake and approximately 100 km southeast of the city of Yellowknife.<br />

Historically at the Pine Point area as the site was chosen for its full all year round accessibility. <strong>Avalon</strong> proposes to mine,<br />

mill and produce rare earth oxides, zirconium, niobium and tantalum oxides, and possibly gallium from the Nechalacho<br />

deposit, located on its Thor Lake Property. The proposed project is referred to as the Thor Lake Project (TLP).<br />

Approximately 12 million tonnes of probable reserves will be mined from the Nechalacho deposit over a period of<br />

approximately 20 years of operations with the likelihood of an increase in schedule. Construction will begin immediately<br />

upon receipt of permits and financing, and reclamation activities will commence following cessation of all operations and<br />

continue for a period of approximately three years.<br />

The proposed TLP has two site components: an underground mine and flotation plant (Nechalacho Mine and Flotation<br />

Plant site), to be located at the Thor Lake Property, and a hydrometallurgical plant (Hydrometallurgical Plant site) to be<br />

located at the existing brownfields site of the former Pine Point Mine, 85 km east of Hay River, NT on the sou th shore of<br />

Great Slave Lake.<br />

<strong>Rare</strong> earth elements (REEs) will be mined underground at a rate of 2,000 tpd and concentrated at the Nechalacho Mine<br />

and Flotation Plant site. The resulting REE concentrates will be barged across the east end of Great Slave La ke to the<br />

Hydrometallurgical Plant site. Upon arrival, the concentrate will be transported from the south shore of Great Slave Lake<br />

to the Hydrometallurgical Plant site via a haul road. The concentrate will be further processed at the Hydrometallurgical<br />

Plant. The resulting final products will be hauled to the Hay River railhead via truck, and direct shipped to <strong>Avalon</strong>’s<br />

separation facility.<br />

Flotation Plant: The process to produce the REE concentrate will involve conventional grinding, crushing and flotation<br />

techniques. Processing facilities will include a Flotation Plant that will produce a high grade concentrate that will be<br />

barged off-site to the proposed Hydrometallurgical Plant site for secondary processing.<br />

Hydrometallurgical Plant: The proposed Hydrometallurgical Plant will further process the REE concentrates from the<br />

Nechalacho Mine and Flotation Plant. The process will include acid baking, caustic cracking, water washing, filtration,<br />

caustic regeneration and evaporation, double salt precipitation, solvent extraction and product drying facilities to produce<br />

direct ship products.<br />

A full description of the project and the permitting process is available from the Review board and Mackenzie Valley Land<br />

and Water Board (MVLWB) public registry under <strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> at:<br />

www.mvlwb.ca and http://www.mvlwb.ca/mv/reg.aspx?app=MV2010D0017 & MV2010L2-0005.<br />

<strong>Avalon</strong> is well funded, has no debt and its work programs are progressing steadily.<br />

environmental stewardship are corporate cornerstones.<br />

Social responsibility and


POSITION OVERVIEW:<br />

This is a full time position reporting to Senior Resource Geologist. The Resource Geologist will provide full time support<br />

to the Geology team and is accountable for undertaking tasks relating to the implementation and on-going maintenance<br />

of a geological database, QAQC procedures and 3D modeling. You will have specific experience in earth or rare earth<br />

geology, sampling and quality, exploration programme management in open-cut and underground minerals, mining law,<br />

geophysical exploration methods, including wire-line geophysical log and seismic interpretation skills, deposit modelling<br />

and evaluation skills. A good general knowledge of open-cut and underground mining geotechnics will also be required.<br />

PRIMARY RESPONSIBILITIES:<br />

This position will be based in Delta, BC with extensive travel to and from the Project – Thor Lake Project located in The<br />

Northwest Territories. This position will be responsible for providing leadership and working with vendors to implement<br />

and maintain databases.<br />

This position is accountable for providing input into 3D model and assisting with digital input of data into model and<br />

database. Provide assistance to site personnel with respect to database and model software. Liaise between various key<br />

personnel to ensure that goals are met. Prepare cross sections, plans etc. to facilitate diamond drill program.<br />

Provide assistance on structural component of program. Measure characteristics of the Earth, such as gravity and<br />

magnetic fields, using equipment such as seismographs, gravimeters, torsion balances, and magnetometers. Test<br />

industrial earths and abrasives, soil, or rocks in order to determine their geological characteristics, using optical, x-ray,<br />

heat, acid, and precision instruments.<br />

Prepare geological maps, cross-sectional diagrams, charts, and reports concerning mineral extraction, land use, and<br />

resource management, using results of field work and laboratory research. Analyze and interpret geological,<br />

geochemical, and geophysical information from sources such as survey data, well logs, boreholes, and aerial photos.<br />

The above duties and responsibilities are representative of the nature and level of work assigned and are not necessarily<br />

all-inclusive. Travel to site including to corporate and operational offices as required. Perform any additional duties as<br />

required.<br />

QUALIFICATIONS:<br />

Minimum GIT or BSc Degree in Geology<br />

Minimum 1-2 years’ underground mining experience<br />

Strong team player and problem solver<br />

Experience with modeling/QA/QC and Minesite is an absolute asset<br />

Experience with Resource modeling software is an absolute asset<br />

Learn resource modeling<br />

Experience in managing internal databases<br />

Demonstrate and Manage QA/QC from site to model<br />

Previous experience working with Aboriginal communities is an asset.<br />

Strong computer skills (e.g. MS Office including Excel and Word) are essential.<br />

Excellent written and verbal skills<br />

Able and flexible to work rotational work schedules. Rotations will be discussed as the Project develops.<br />

OTHER:<br />

Based in Delta, BC and may work rotational shifts during exploration and operational season. The rotations will be<br />

discussed upon successful hire and may change as the Project develops.<br />

<strong>Avalon</strong> <strong>Rare</strong> <strong>Metals</strong> offers total rewards compensation, with a comprehensive benefits package.<br />

www.avalonraremetals.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!