<strong>MAURITIUS</strong> <strong><strong>PO</strong>RTS</strong> <strong>AUTHORITY</strong><br />

<strong>PO</strong> <strong>Box</strong> <strong>379</strong><br />

<strong>Port</strong> Administration Building<br />

Mer Rouge – <strong>Port</strong> Louis<br />

Republic of Mauritius<br />

Phone +230 240 0415/20<br />

Fax +230 240 0856<br />

E-mail mpaisd@bow.intnet.mu<br />

Web: www.mauport.com<br />

The Mauritius Marine Authority, set up in 1976, was replaced by the Mauritius <strong>Port</strong>s Authority<br />

(MPA) after the enactment of the <strong>Port</strong>s Act 1998 as from 1 st August 1998. Under this new legal<br />

framework, the MPA is now established as a landlord port authority with regulating and controlling<br />

powers over port activities and services, including the function of providing marine services, and<br />

also being responsible for overall planning and development together with land management.<br />

MPA has concluded a contract with the Cargo Handling Corporation Ltd (CHCL) for the operation<br />

of the New Container Terminal (NCT). The concession contract covers all the various aspects of<br />

operations and management such as:


• Working hours<br />

• Operational strategy<br />

• Vessels management<br />

• Tariffs<br />

• Operation and maintenance of port equipment<br />

• Security and safety<br />

CARGO HANDLING COR<strong>PO</strong>RATION<br />

<strong>PO</strong> <strong>Box</strong> 285<br />

<strong>Port</strong> Louis Harbour<br />

Mer Rouge<br />

<strong>Port</strong>-Louis<br />

Republic of Mauritius<br />

Phone +230 242 2232/33/34<br />

Fax +230 240 2237<br />

E-mail chclcpu@intnet.mu<br />

The Cargo Handling Corporation Ltd (CHCL) is a private company with State shareholding. It<br />

manages port handling operations: unloading, delivery and reception. CHCL is an independent<br />

operator, which has entered into a concession contract with MPA for general cargo and container<br />

handling at the existing terminals.<br />

CHCL has assisted in establishing management system for the newly developed Mauritius<br />

Container Terminal. This is with regard to:<br />

• The organisation of different tasks and the setting up of an operational system<br />

• The computer tracking of container movement, and<br />

• Establishing an operation manual


<strong>MAURITIUS</strong> FREE<strong>PO</strong>RT <strong>AUTHORITY</strong><br />

Deramann Tower<br />

Sir William Newton Street<br />

<strong>Port</strong>-Louis<br />

Republic of Mauritius<br />

Phone +230 212 9627<br />

Fax +230 9626<br />

E-mail mfa@freeport.intnet.mu<br />

Website http://www.freeport.gov.mu<br />

The Mauritius Freeport (MFA) was created in 1992 with the objective of positioning <strong>Port</strong> Louis as<br />

a hub and promoting its as a warehousing, distribution, marketing and logistics platform for the<br />

development of trade in the Indian ocean region.<br />

MFA is the sole authority responsible for the management and control of the Freeport zones. It<br />

acts as a facilitator, and its functions include:<br />

• Issuing of licences to companies operating in the Mauritius Freeport<br />

• Allocating operational space and any other facility or structure available in the Freeport<br />

zones<br />

• Working out agreements with third parties to provide additional or backup services to<br />

Freeport licence holders<br />

• Promoting and developing incremental trade<br />

• Assisting Freeport companies in finding reliable and competitive sources of supply, and in<br />

penetrating and developing markets for their products.<br />

Freeport activities ranges from warehousing to minor assembly and includes:<br />

• Import and re-export of dry and frozen goods<br />

• Warehousing and storage<br />

• Value added transformation through such operations as simple assembly and minor<br />

processing<br />

• Sorting, grading, cleaning and mixing<br />

• Ship building, repairs and maintenance of ships and aircrafts<br />

• Freight forwarding<br />

• Quality control and inspection services<br />

The Freeport has space in excess of 70,000m² for dry storage, cold rooms, exhibition centres and<br />

offices.


<strong>PO</strong>RT-LOUIS<br />

<strong>Port</strong>-Louis is the capital city and the only port of the island, located on the North-west coast.<br />

TERMINAL I<br />

Quay Length DepthType of Cargo<br />

A 210m 12,2mPassenger, general cargo, rice, etc…<br />

D 170m 12,2mBlack oil, wheat, molasses, edible oil,<br />

general cargo, passenger and inter-island<br />

trade<br />

E 135m 9,0mPassenger and inter-island etc.<br />

Trou Fanfaron n°1 150m 5,5mFish<br />

Trou Fanfaron n°2 165m 7,0mFish<br />

TERMINAL II<br />

Quay Length DepthType of Cargo<br />

N°1 123m 12,2mBulk fertiliser, Coal, white oil, liquid<br />

ammonia, tallow and general cargo<br />

N°2 180m 12,2mGeneral cargo, containers and cement<br />

N°3 185m 12,2mGeneral cargo and containers<br />

N°4 185m 12,2mContainers, LPG and bitumen<br />

Additionally, there are two buoy berths for anchoring smaller vessels in mid-stream. Between<br />

Quay n°1 and n°2 there is a cement reception facility where bulk cement is discharged and<br />

pumped through pipelines into silos at the rate of 400 tons per hour.<br />

TERMINAL III<br />

Quay Length DepthType of Cargo<br />

MCT 560m 13,1mContainers and petroleum products


Mauritius Container Terminal (MCT)<br />

The Mauritius Container Terminal (MCT) was inaugurated in January 1999 and is located in the<br />

northern area of the port, at Mer Rouge, adjacent to the Mauritius Freeport facilities. Investments<br />

totalling 80US$ million have been made to develop the terminal.<br />

Nautical access is through a 550m channel dredged at 14,0m and 450m wide. The turning circle<br />

has a diameter of 450m.Main features are:<br />

• Area coverage of 26 hectares, built on reclaimed land from the ocean.<br />

• Storage capacity of an annual throughput of 300,000 TEUs<br />

• Terminal fitted with 3 post panamax rail mounted gantry cranes, with 47m outreach and<br />

15m backreach, lifting capacity of 40,8 tons under spreader and 72,0 tons under hook.<br />

• Yard combination of reachstackers, front loaders, tractors and trailers<br />

• 144 reefer points for transit storage of refrigerated containers<br />

• On quay bunkering facilities<br />

• Dedicated gateways to Freeport zones<br />

• Average ship productivity per working hour of 26.3 ECM/GCH (Equivalent Container<br />

Moves/Gross Crane Hour) in financial year 2000/2001. The terminal handled 97.8 % of<br />

total container traffic in the same year.<br />

Bulk Sugar Terminal<br />

The bulk sugar terminal has a quay length of 198m, and is able to accommodate vessels drawing<br />

up to 11,2m. This facility enables the loading of sugar at a rate of 1400 tons per hour by means of<br />

a pneumatic pump from two storage sheds of 175 000 tons capacity each.<br />

Pilotage<br />

Pilotage is compulsory for all vessels over 100 GT and this service is available on a 24 hours<br />

basis.<br />

Towage<br />

There is a 45 tons bollard pull tug with capacity of 3600hp, 2 tugs of 2600hp capacity and 3 tugs<br />

of 1000hp capacity for towage operations.<br />

Working Hours<br />

All bulk cargoes are handled round the clock, seven days a week. Container and general cargo<br />

are handled up to 23:00 on weekdays at Terminal II, whereas at the MCT, the containers are<br />

handled round the clock.


Metric Tons 1997 1998 1999 2000 2001<br />

UNLOADED<br />

General Cargo<br />

Break-Bulk 251,315 228,342 229,077 211,048 190,756<br />

Container Cargo 691,067 743,161 770,284 837,239 893,714<br />

Sub-total 942,382 971,503 999,361 1,048,287 1,084,470<br />

Bulk<br />

Liquid Bulk<br />

Liquid Oil 858,397 873,632 925,713 935,157 963,729<br />

Other Liquid 67,221 67,604 60,157 61,294 64,278<br />

Sub-total Liquid 925,618 941,236 985,870 996,451 1,028,007<br />

Dry Bulk 866,634 976,233 1,017,239 1,243,957 1,242,825<br />

Sub-total 1,792,252 1,917,469 2,003,109 2,240,408 2,270,832<br />

TOTAL* 2,734,634 2,888,972 3,002,470 3,288,695 3,355,302<br />

LOADED<br />

General Cargo<br />

Break-Bulk 15,927 15,775 13,958 15,882 15,380<br />

Container Cargo 342,986 352,559 <strong>379</strong>,969 432,721 463,393<br />

Sub-total 358,913 368,334 393,927 448,603 478,773<br />

Bulk<br />

Liquid Bulk<br />

Liquid Oil - - -<br />

Other Liquid 112,043 153,284 107,234 89,511 151,440<br />

Sub-total Liquid 112,043 153,284 107,234 89,511 151,440<br />

Dry Bulk 501,061 542,514 468,000 360,711 536,728<br />

Sub-total 613,104 695,798 575,234 450,222 688,168<br />

TOTAL* 972,017 1,064,132 969,161 898,825 1,166,941<br />

GRAND TOTAL* 3,706,651 3,953,104 3,971,631 4,187,520 4,522,243<br />

* = Excludes transhipment cargo and bunkers loaded<br />

1997 1998 1999 2000 2001<br />

TEU's (numbers)<br />

IN<br />

Full 53,637 60,563 63,423 68,019 71,234<br />

Empty 5,384 7,422 6,178 9,245 8,193<br />

Sub-total (TEU's) 59,021 67,985 69,601 77,264 79,427<br />

Tonnage 679,487 727,766 707,141 795,697 852,241<br />

Transhipment<br />

Full 1,004 1,247 5,000 3,311 3,392


Empty 38 229 1,081 104 482<br />

Sub-total (TEU's) 1,042 1,476 6,081 3,415 3,874<br />

Tonnage 11,580 15,395 63,143 41,542 41,473<br />

Total TEU's IN<br />

Total Tonnage IN 691,067 743,161 770,284 837,239 893,714<br />

TEU's (numbers)<br />

OUT<br />

Full 26,420 28,262 30,480 35,000 37,002<br />

Empty 30,473 38,694 38,107 41,741 41,331<br />

Sub-total (TEU's) 56,893 66,956 68,587 76,741 78,333<br />

Tonnage 331,406 337,164 316,826 391,179 421,920<br />

Transhipment<br />

Full 1,004 1,247 5,000 3,311 3,392<br />

Empty 38 229 1,081 104 482<br />

Sub-total (TEU's) 1,042 1,476 6,081 3,415 3,874<br />

Tonnage 11,580 15,395 63,143 41,542 41,473<br />

Total TEU's OUT<br />

Tonnage OUT* 342,986 352,559 <strong>379</strong>,969 432,721 463,393<br />

GRAND TOTALS<br />

IN + OUT TEU's<br />

Full 80,057 88,825 93,903 103,019 108,236<br />

Empty 35,857 46,116 44,285 50,986 49,524<br />

Sub-total (TEU's) 115,914 134,941 138,188 154,005 157,760<br />

Tonnage 1,034,053 1,095,720 1,150,253 1,269,960 1,357,107<br />

Transhipment<br />

Full 2,008 2,494 10,000 6,622 6,784<br />

Empty 76 458 2,162 208 964<br />

Sub-total (TEU's) 2,084 2,952 12,162 6,830 7,748<br />

Tonnage 23,160 30,790 126,286 83,084 82,946<br />

GRAND TEU's 117,998 137,893 150,350 160,835 165,508<br />

GRAND TONNAGE 1,057,213 1,126,510 1,276,539 1,353,044 1,440,053<br />

Construction of an Oil Jetty at Mer Rouge<br />

The project for the construction of the Oil Jetty at Mer Rouge next to the area earmarked for<br />

petroleum storage, where handling of all petroleum products will be concentrated, thus improving<br />

safety within port area. Modern fighting equipment such as fire monitors, water container would<br />

also be provided and CCTV surveillance system. The project is scheduled to be completed by<br />

end 2003 to early 2004.<br />

Extension of Quay Length at MCT<br />

The increase in container traffic coupled with the recent transshipment projects has necessitated<br />

additional berthing facilities. To cope with this situation, the MPA will undertake the extension of<br />

quay length at MCT to accommodate at any one time three post panamax gearless (G x type).


Les Salines Development<br />

Some 25 hectares of land have been reclaimed, adjacent to the actual waterfront. It is proposed<br />

to develop this site for activities, which will be compatible with those of the existing waterfront.<br />

<strong>Port</strong> Security<br />

MPA is also in the process of implementing the project for the improvement of security at <strong>Port</strong><br />

Louis Harbour, following the submission of the final report from the consultant.