2-4<br />

Table 2-3, continued<br />

Notes:<br />

Wetland type<br />

Segment<br />

Size<br />

(acres)<br />

Impact<br />

(acres)<br />

PFO/PSS O-13 0.2 0<br />

PSS/PEM O-13 0.1 0<br />

PEM O-13 0.1 0<br />

PEM O-13 0.4 0.1<br />

PFO O-18 0.0 0<br />

PEM/PSS O-18 0.2 0<br />

POW/PEM O-18 0.7 0<br />

PFO/PEM O-21 0.3 0<br />

POW/PEM O-21 1.8 0<br />

PFO O-20 0.4 0<br />

Total 12.7 1.31<br />

PEM=Palustrine Emergent; PSS=Palustrine Scrub-Shrub; POW=Palustrine Open Water;<br />

PFO= Palustrine Forested<br />

2.2 SEGMENTS O-4 THROUGH O-10<br />

The ESP anticipated that O-4 through O-10 would consist of seven distinct segments of a<br />

concrete flood protection structure/concrete fence in Hidalgo County and would affect an<br />

approximately 40-foot-wide corridor. This structure would be built where the current USIBWC<br />

levee exists; the access roads and all construction activities were to be contained within the<br />

USIBWC ROW.<br />

The structure would range from 15 to 18 feet in height based on USIBWC requirements not to<br />

affect floodwaters in Mexico in accordance with international treaty obligations. Also, a guard<br />

rail or bollard fence would be built on top of the structure to ensure the safety of drivers using<br />

the road on top of the levee. Controlled access gates in the concrete fence would allow access to<br />

the area on the <strong>Rio</strong> <strong>Grande</strong> side of the TI by irrigation personnel, emergency services,<br />

recreational users, and others. An access road was also planned adjacent to the bottom of the<br />

structure on the river side.<br />

As stated in the ESP, building the concrete flood protection structure/concrete fence would affect<br />

a corridor approximately 24 to 40 feet wide on the river (flood) side of the levee. The ESP<br />

proposed removing approximately 24 feet of levee on the flood side and anticipated that<br />

construction would have a temporary impact on approximately 16 additional feet within the<br />

USIBWC ROW. The ESP estimated that the total permanent impact area would be<br />

approximately 106.2 acres. The ESP did not discuss temporary impact acreage associated with<br />

proposed staging areas, but those areas were included in <strong>CBP</strong> data files. As Table 2-4 shows, the<br />

planned staging areas for O-4 through O-10, according to the FITT data files, were expected to<br />

total 52.8 acres.<br />