DIMENSIONS IN MILLIMETRES<br />
( DIMENSIONS IN FEET-INCHES )<br />
THIRD ANGLE<br />
PROJECTION<br />
"ALL DIMENSIONS AND DESIGN CRITERIA<br />
R<br />
SUBJECT TO CHANGE WITHOUT NOTICE." PAGE 2 OF 4 R<br />
FILE NO. 186-191 REV. 2<br />
0<br />
0<br />
A<br />
B<br />
FINISH FLOOR<br />
THICKNESS<br />
TOP OF FLOOR COVERING<br />
SHIM THICKNESS<br />
13 ( 1/2 ") TO 25 ( 1" )<br />
TOP OF ROUGH FLOOR<br />
SEE DETAIL #1<br />
WALL FINISH APPLIED AFTER<br />
<strong>VAULT</strong> DOOR IS INSTALLED,<br />
GROUTED AND TRIMMED<br />
1 1 1 mm (4 3/8 ") WALL FINISH<br />
SHOWN<br />
GENERAL CONTRACTOR NOTE<br />
IT IS "MANDATORY" THAT THE OWNERS GENERAL CONTRACTOR GROUT<br />
IN THE SPACE BETWEEN VESTIBULE AND CONCRETE WALL PANEL<br />
AFTER <strong>VAULT</strong> DOOR IS INSTALLED AND APPROVED BY DIEBOLD. GROUT<br />
TO CONSIST OF CLEAN SAND AND CEMENT USING FORMULATION TO<br />
PROVIDE AT LEAST 3,000 P. S. I. ( EQUIVALENT TO 6 BAG MIX ).<br />
CAUTION: GROUTING USING MECHANICAL OR HYDRAULIC METHODS<br />
MAY RESULT IN DAMAGE TO THE <strong>VAULT</strong> DOOR.<br />
NOTE:<br />
0<br />
13 ( 1/2 ") BEDPLATE<br />
0 0<br />
2244 (7’-4 3/8 ")<br />
0<br />
SEE DETAIL #2 AND #3<br />
WALL FINISH APPLIED AFTER <strong>VAULT</strong> DOOR IS INSTALLED 1 1 1mm (4 3/8 ") WALL FINISH SHOWN<br />
LC<br />
EMERGENCY <strong>VAULT</strong><br />
VENTILATOR<br />
WALL OPENING 0<br />
13 ( 1/2 ")<br />
0 (0")<br />
0<br />
2205 (7’-2 13/16 " ) JAMB TRIM<br />
0<br />
124 (4 7/8 ")<br />
24 ( 15/16 " )<br />
0<br />
0<br />
DOOR<br />
2057 (6’-9")<br />
0<br />
0<br />
1460 (4’-9 1/2 ") JAMB TRIM<br />
16 ( 5/8 ") 19 ( 3/4 ") 22 ( 7/8 ") 25 ( 1")<br />
3 ( 1/8 ") 6 ( 1/4 ") 10 ( 3/8 ") 13 ( 1/2 ")<br />
0<br />
171<br />
(6 3/4 ")<br />
0<br />
1988 (6’-6 1/4 ") VESTIBULE CLEAR OPENING<br />
0<br />
SECTION<br />
19 ( 3/4 ")<br />
0<br />
2197 (7’-2 1/2 ") VESTIBULE STAINLESS TRIM<br />
0<br />
E.C. TO PROVIDE AND<br />
INSTALL JUNCTION BOXES<br />
FOR POWER AND ALARM<br />
AT CONDUIT PENETRATIONS<br />
IN DOOR HEADER PANEL<br />
DAYGATE<br />
DAYGATE IN<br />
"OPEN POSITION"<br />
G.C. TO PROVIDE AND INSTALL 13mm X 559mm X 1600mm<br />
( 1/2 " X 1’-10" X 5’-3") BED PLATE WITH #5 ROD FOR<br />
ANCHORING (TYPICAL FOUR CORNERS)<br />
GROUT (SEE GENERAL<br />
CONTRACTOR NOTE)<br />
0<br />
CONCRETE<br />
VESTIBULE<br />
SETTING DETAIL FOR 1 1 1 mm (4 3/8 ") WALL FINISH SHOWN<br />
OWNER’S G.C. TO VERIFY FLOOR COVERING THICKNESS TO BE<br />
APPLIED INSIDE AND OUTSIDE <strong>VAULT</strong>. OWNER’S G.C. TO PREPARE<br />
FLOOR AS REQUIED SO FINISHED FLOOR HEIGHT MEETS OR IS<br />
FEATHERED TO EDGE OF <strong>VAULT</strong> DOOR SILL HEIGHT, BUT DOES NOT<br />
EXCEED TOP OF SILL PLATE<br />
300 ( 1 1 13/16 ")<br />
FINISH FLOOR MATERIAL INSIDE AND OUTSIDE<br />
<strong>VAULT</strong> SHOULD MEET OR BE FEATHERED TO<br />
THIS EDGE OF <strong>VAULT</strong> DOOR SILL PLATE<br />
FINISH<br />
FLOOR<br />
A<br />
0<br />
TOP OF<br />
ROUGH FLOOR<br />
0<br />
0 0<br />
13 ( 1/2 ") BED<br />
PLATE<br />
0<br />
13 ( 1/2 ")<br />
0 0<br />
DETAIL #3<br />
0<br />
1 14<br />
(4 1/2 ")<br />
0<br />
1448 (4’-9") VESTIBULE STAINLESS TRIM<br />
0 0<br />
EMERGENCY <strong>VAULT</strong><br />
VENTILATOR<br />
INTERIOR <strong>ELEVATION</strong><br />
0<br />
2244 (7’-4 3/8 ")<br />
WALL OPENING<br />
DETAIL #2<br />
0<br />
2205 (7’-2 13/16 ")<br />
JAMB TRIM<br />
DOOR SILL<br />
PLATE<br />
13 ( 1/2 ")<br />
0<br />
0<br />
DETAIL #1<br />
LIFT FOR AIR<br />
1600 (5’-3") BED PLATE0<br />
0 0<br />
0<br />
19 ( 3/4 ")<br />
STEEL SILL<br />
SHIM<br />
B THICKNESS<br />
0<br />
2197 (7’-2 1/2 ") VESTIBULE STAINLESS TRIM<br />
0