- Page 1: DOE/ID-11088 Rev. 1 Idaho National
- Page 5 and 6: This page intentionally left blank.
- Page 7 and 8: This page intentionally left blank.
- Page 9 and 10: 4.2.2 ICP Contractor ..............
- Page 11 and 12: Figure 4-14. Agricultural products
- Page 13 and 14: M&O management and operating MDIFF
- Page 15 and 16: Figure 1-1. Idaho National Laborato
- Page 17 and 18: The depth to the SRPA varies from a
- Page 19 and 20: 1.3.4 Advanced Mixed Waste Treatmen
- Page 21 and 22: treatment plans, federal stewardshi
- Page 23 and 24: This page intentionally left blank.
- Page 25 and 26: defense and special programs. The I
- Page 27 and 28: 2.2.1 INL Contractor The INL contra
- Page 29 and 30: egulatory issues, the Cross-Connect
- Page 31 and 32: currently require continuous monito
- Page 33 and 34: This page intentionally left blank.
- Page 35 and 36: Direct discharge of wastewater to t
- Page 37 and 38: This page intentionally left blank.
- Page 39 and 40: Effluent Monitoring 3-10 Figure 3-3
- Page 41 and 42: the periphery of the SDA in predomi
- Page 43 and 44: This page intentionally left blank.
- Page 45 and 46: INL Site drinking water systems are
- Page 47 and 48: This page intentionally left blank.
- Page 49 and 50: This page intentionally left blank.
- Page 51 and 52: Each monitoring well in the USGS re
- Page 53 and 54:
This page intentionally left blank.
- Page 55 and 56:
This page intentionally left blank.
- Page 57 and 58:
This page intentionally left blank.
- Page 59 and 60:
near-surface soils at RWMC have bec
- Page 61 and 62:
This page intentionally left blank.
- Page 63 and 64:
This page intentionally left blank.
- Page 65 and 66:
This page intentionally left blank.
- Page 67 and 68:
Environmental Surveillance 4-28 Fig
- Page 69 and 70:
Environmental Surveillance 4-30 Fig
- Page 71 and 72:
Environmental Surveillance 4-32 Fig
- Page 73 and 74:
family dairies, others are taken fr
- Page 75 and 76:
This page intentionally left blank.
- Page 77 and 78:
This page intentionally left blank.
- Page 79 and 80:
This page intentionally left blank.
- Page 81 and 82:
The Operational Dosimetry Section o
- Page 83 and 84:
This page intentionally left blank.
- Page 85 and 86:
This page intentionally left blank.
- Page 87 and 88:
are taken using high-volume air mon
- Page 89 and 90:
This page intentionally left blank.
- Page 91 and 92:
This page intentionally left blank.
- Page 93 and 94:
The INL contractor is also responsi
- Page 95 and 96:
PLN-720, “Environmental Surveilla
- Page 97 and 98:
This page intentionally left blank.
- Page 99 and 100:
Order 450.1 (Reference 1). This met
- Page 101 and 102:
Figure 10-1. Auxiliary Reactor Area
- Page 103 and 104:
Figure 10-3. CITRC monitoring locat
- Page 105 and 106:
Figure 10-5. MFC monitoring locatio
- Page 107 and 108:
Figure 10-7. RTC monitoring locatio
- Page 109 and 110:
Figure 10-9. SMC monitoring locatio
- Page 111 and 112:
Figure 10-11. WRRTF monitoring loca
- Page 113 and 114:
This page intentionally left blank.
- Page 115 and 116:
18. 40 CFR 61, Appendix B, “Metho
- Page 117:
53. 10 CFR 830, Subpart A, “Quali