06.03.2014 Views

Request For Proposal - Information Resource & Facilitation Centre ...

Request For Proposal - Information Resource & Facilitation Centre ...

Request For Proposal - Information Resource & Facilitation Centre ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6<br />

PART II – ESSENTIAL DETAILS OF ITEMS/SERVICES REQUIRED<br />

INVITATION OF BIDS<br />

Non-Destructive Test Equipment – Magnetic Inspection Unit (Magnetic Particle<br />

Inspection ) & Indicator Electrical Potential ( Cathode Potential Meter)<br />

REQUEST FOR PROPOSAL (RFP) NO. _DPR/MW/113008 DATED 12 Mar 2012<br />

1. Schedule of Requirements – List of items / services required is as follows:<br />

Sl No Part No Description Qty Rate Total<br />

value<br />

01 N6635-000223 Non Destructive Test Unit 07<br />

(Magnetic Particle Inspection )<br />

02 N6635-020946 Indicator Electrical Potential 07<br />

(Cathode Potential Meter)<br />

2. Technical Details: As per NSQR (enclosed)<br />

3. Two-Bid System - In respect of Two-bid system, Bidders are required to<br />

furnish clause by clause compliance of specifications bringing out clearly the<br />

deviations from specification, if any. The Bidders are advised to submit the<br />

compliance statement as per Technical Evaluation in the following format enclosed.<br />

along with Technical Bid –<br />

Para of RFP<br />

specifications<br />

item-wise<br />

Specification of<br />

item offered<br />

Compliance to<br />

RFP specification<br />

– whether Yes /<br />

No<br />

In case of noncompliance,<br />

deviation from<br />

RFP to be<br />

specified in<br />

unambiguous<br />

terms<br />

4. Delivery Period - Delivery period for supply of items would be 180 Days<br />

from the effective date of contract. Please note that Contract can be cancelled<br />

unilaterally by the Buyer in case items are not received within the contracted delivery<br />

period. Extension of contracted delivery period will be at the sole discretion of the<br />

Buyer, with applicability of LD clause.<br />

5. INCOTERMS for Delivery and Transportation – CIF/CIP Mumbai Air/Sea Port<br />

for foreign vendors and Local Delivery at site at Controller Warehousing, Material<br />

Organisation, Ghatkopar, Mumbai – 400 086 for Indian Vendors.<br />

6. Consignee details –<br />

Controller for Warehousing<br />

Material Organization<br />

Ghatkopar (West)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!