08.03.2014 Views

Donald J. Pierce NIST Center for Neutron Research - ISIS

Donald J. Pierce NIST Center for Neutron Research - ISIS

Donald J. Pierce NIST Center for Neutron Research - ISIS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Donald</strong> J. <strong>Pierce</strong><br />

<strong>NIST</strong> <strong>Center</strong> <strong>for</strong> <strong>Neutron</strong> <strong>Research</strong>


Outline<br />

Facility Overview<br />

Organization Structure<br />

NCNR In-House Capabilities<br />

RFO (<strong>Research</strong> Facility Operations) Engineering<br />

Team Functions<br />

Recent Activities<br />

Current Instrument Development Projects


Pre-Expansion Facility Layout<br />

BT8 Resid.<br />

Stress Diff.<br />

BT9 3-Axis Spec.<br />

BT7 3-Axis Spec.<br />

NG0 MACS<br />

NG1 AND/R<br />

NG1 Vert. Refl.<br />

NG1 <strong>Neutron</strong><br />

Depth Profiling<br />

NG2 Backscattering Spec.<br />

NG3 30 m SANS<br />

BT1<br />

Powd.<br />

Diff.<br />

Thermal<br />

Column<br />

BT5 USANS<br />

NG-5 SPINS<br />

NG5 Spin-Echo Spec.<br />

NG4 Disk Chopper<br />

TOF Spec.<br />

BT2 <strong>Neutron</strong><br />

Imaging Facil.<br />

BT4 FANS<br />

NG7 Hor. Refl.<br />

NG7 Prompt γ<br />

NG6 <strong>Neutron</strong> Physics<br />

NG7 Interferometer<br />

Diffraction<br />

Instruments Spectrometers Other <strong>Neutron</strong> Methods<br />

NG7 30 m SANS<br />

22 beam facilities, operating 250-260 days/yr


NCNR Facility Overview<br />

Guide Hall - Pre-Expansion


An Expanding Facility – ca. 2015


<strong>NIST</strong> <strong>Center</strong> <strong>for</strong> <strong>Neutron</strong> <strong>Research</strong><br />

Other participating<br />

groups<br />

Rob Dimeo<br />

Director<br />

Health Physics (OD)<br />

D. Brown, Leader<br />

<strong>Neutron</strong> Interaction &<br />

Dosimetry Group (PL)<br />

M. Arif, Group Leader<br />

<strong>Neutron</strong> Methods Team (CSTL)<br />

G. Downing, Team Leader<br />

Sean O’Kelly<br />

Reactor Operations &<br />

Engineering<br />

Mike Moore<br />

Senior Management<br />

Advisor<br />

Dan Neumann<br />

<strong>Neutron</strong> Condensed Matter<br />

Science<br />

Richard Ibberson<br />

<strong>Research</strong> Facility<br />

Operations


Teams and Team Leaders<br />

Chief <strong>Research</strong> Facility<br />

Operations<br />

Project office (1)<br />

Safety Officer (1)<br />

<strong>Neutron</strong>ics/shielding<br />

simulations (1)<br />

3<br />

He <strong>Neutron</strong> spin<br />

Filters (3)<br />

Building Manager (1)<br />

Don <strong>Pierce</strong><br />

Mechanical<br />

Engineering (14)<br />

(11 by end of CY 2012)<br />

George Baltic<br />

Mechanical<br />

Engineering<br />

Technicians (9+)<br />

Nick Maliszewskyj<br />

Instrument Control<br />

Systems (6 + )<br />

Steve Pheiffer<br />

Data Acquisition<br />

Software (4)<br />

Richard Azuah<br />

Data Analysis Software<br />

(6)


217 total staff†<br />

† not including staff from Physics, Chemistry, or Health Physics


In-House Capabilities<br />

What we can do:<br />

•Cold Source Design/Fabrication/Testing<br />

•Shield Filling (steel shot/wax)<br />

•Part fabrication/modification (small volume – quick turnaround)<br />

•CNC Mills and Lathes<br />

•Moving wire EDM<br />

•Warm part modification (Warm Shop)<br />

•<strong>Neutron</strong>ic Design/Simulation of Guide Systems<br />

•<strong>Neutron</strong>/Gamma Ray Shielding Specification/Simulation<br />

•Guide Installation/Alignment<br />

•<strong>Research</strong> Facility Surveying/Metrology<br />

•Structural/Seismic/Thermal Finite Element Analysis<br />

•Assembly/Testing of Large Equipment (High Bay w/10T crane)<br />

•Self-Leveling Epoxy Floor Installation<br />

•Vacuum Testing/Mass Spectrometry


In-House Capabilities<br />

What we outsource:<br />

• 3 He Detectors<br />

•<strong>Neutron</strong> Guides<br />

•Choppers/Velocity Selectors<br />

•Cryogenic Filter Housings/Cold Traps<br />

•Building Structural Analysis (Floor Loading)<br />

•Shield Tank Fabrication<br />

•Instrument Sub-Assemblies (Design/Build)<br />

•Shield Filling (Shot/Wax)


•Engineering Lead on Instrument Development Projects<br />

•Establish Instrument Project Scope/Budget/Schedule<br />

•Determine Make/Buy Decisions<br />

•Direct Engineering Ef<strong>for</strong>t<br />

•Maintain Solid Model of NCNR <strong>Research</strong> Facility<br />

•Create/Maintain Survey and Alignment Network<br />

•Maintain Integrated Facility Development Schedule (Microsoft Project TM )<br />

•Mechanical Engineering Design of <strong>Research</strong> Facility Infrastructure<br />

•Guide/Shielding/Instrument Layout (w/input from Physics Staff)<br />

•Floor Loading Analysis (contracted)<br />

•Mechanical Engineering Design of Instrument Projects<br />

•Conceptual Design/Per<strong>for</strong>mance Requirements/Safety<br />

•Detailed Design/Analysis<br />

•Component Selection<br />

•Creation of Assembly and Fabrication Drawing Packages<br />

•Acquisition of Components and Hardware<br />

•Requirements Definition (customer)<br />

•Acquisition Participation (Contracting Officers Technical Representative)


Acquisition of Components and Hardware<br />

•Custom Assemblies<br />

•Part Fabrication/In-House Assembly and Testing<br />

•<strong>NIST</strong> Shops<br />

•Machining BOA (Basic Ordering Agreement)<br />

•Welding BOA (Shield Tanks)<br />

•NCNR Machine Shop<br />

• Contracted Design/Build Assemblies<br />

•Engineering Services Design/Build IDIQ (Indefinite<br />

Delivery/Indefinite Quantity)<br />

•Requires a submission package<br />

•Specifications/Requirements<br />

•Solid Models<br />

•Statement of Work<br />

•Guide BOA (Swiss<strong>Neutron</strong>ics, S-DH)<br />

•Full and Open Competition<br />

•Specifications/Requirements<br />

•Statement of Work


CAD Plat<strong>for</strong>m (Creo<br />

Elements/Direct Modeling TM<br />

TM )


CAD Plat<strong>for</strong>m (Creo<br />

Elements/Direct Modeling TM<br />

TM )


Recent Activities<br />

NCNR Expansion Initiative


Installation of new cold neutron guide system


Installation of of new new cold cold neutron neutron guide guide system<br />

system


Installation of new cold neutron guide system


Installation of new cold neutron guide system


MACS at BT-9


Current Projects - VSANS<br />

1.5 m travel<br />

Actuators, (2), <strong>for</strong><br />

1.5 m vessel travel


Current Projects - CANDOR


QUESTIONS?

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!