Juneau Non-Motorized Transportation Plan - City and Borough of ...
Juneau Non-Motorized Transportation Plan - City and Borough of ...
Juneau Non-Motorized Transportation Plan - City and Borough of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Juneau</strong> <strong>Non</strong>‐<strong>Motorized</strong> <strong>Transportation</strong> <strong>Plan</strong><br />
Downtown <strong>and</strong> Thane (Figure 9)<br />
Calhoun Avenue<br />
78 • Traffic calming to increase safety for pedestrians<br />
• Options include narrowing travel lanes, reducing speed limit, adding signs<br />
79<br />
Capital Avenue (Willoughby Avenue to 9 th Street)<br />
• Sidewalk needed on one side <strong>of</strong> the street<br />
Douglas Isl<strong>and</strong> (Figure 10)<br />
92<br />
Savikko Road<br />
• Sidewalks on at least one side <strong>of</strong> the street<br />
7.4 Shoulder Lanes<br />
There are several locations in <strong>Juneau</strong> where the shoulder lanes are not paved or where they are<br />
paved but are not wide enough to provide adequate space for pedestrians <strong>and</strong> cyclists to travel<br />
safely. Table 7‐4 lists needed shoulder lane improvements.<br />
Improvement No.<br />
TABLE 7‐3 SHOULDER LANE IMPROVEMENTS<br />
Description<br />
High Priority<br />
Downtown <strong>and</strong> Thane (Figure 9)<br />
Thane Road (Downtown to end)<br />
• Minimum <strong>of</strong> 5 feet on both sides<br />
66 • If there are segments where this is not possible, then a wide travel lane <strong>and</strong> share‐the‐road signs<br />
• A context sensitive street design should be used to ensure that safe design <strong>and</strong> appropriate traffic speeds<br />
• Signed as part <strong>of</strong> cross‐<strong>Juneau</strong> bikeway<br />
Mid <strong>and</strong> Low Priority<br />
Auke Bay (Figure 6) <strong>and</strong> Mendenhall Valley West (Figure 7)<br />
9<br />
Fritz Cove Road<br />
• Ensure minimum <strong>of</strong> 5 feet on both sides<br />
10<br />
Industrial Boulevard (Glacier Highway to Crazy Horse Drive)<br />
• Ensure minimum <strong>of</strong> 5 feet on both sides<br />
Glacier Highway (Lena Loop to Tee Harbor)<br />
11 • Ensure minimum <strong>of</strong> 5 feet on both sides<br />
• Signed as part <strong>of</strong> cross‐<strong>Juneau</strong> bikeway<br />
Glacier Highway (Amalga Harbor to Echo Cove)<br />
13 • Ensure minimum <strong>of</strong> 5 feet on both sides<br />
• Signed as part <strong>of</strong> cross‐<strong>Juneau</strong> bikeway<br />
17<br />
Engineer’s Cut<strong>of</strong>f <strong>and</strong> Mendenhall Peninsula Road (Glacier Highway to end <strong>of</strong> road)<br />
• Ensure minimum <strong>of</strong> 5 feet on both sides<br />
Douglas Isl<strong>and</strong> (Figure 10)<br />
North Douglas Highway (Boat Launch to the end <strong>of</strong> the road)<br />
94 • Ensure minimum <strong>of</strong> 5 feet on both sides<br />
• Signed as part <strong>of</strong> cross‐<strong>Juneau</strong> bikeway<br />
November 2009 57