17.03.2014 Views

Statement - K+S Aktiengesellschaft

Statement - K+S Aktiengesellschaft

Statement - K+S Aktiengesellschaft

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>K+S</strong> Group<br />

Capex: Potash One Feasibility Study vs. <strong>K+S</strong>-Review<br />

USD billion<br />

3.5<br />

CAD billion<br />

3.5<br />

3.25<br />

3.0<br />

3.0<br />

2.90*<br />

0.10<br />

0.25 Phase 2<br />

(0.86 mln. t)<br />

2.70<br />

Phase 2<br />

(0.86 mln. t)<br />

2.5<br />

Phase 2<br />

(0.86 mln. t)<br />

Phase 1<br />

(2 mln. t)<br />

2.5<br />

Phase 1<br />

(2 mln. t)<br />

Phase 1<br />

(2 mln. t)<br />

2.0<br />

Potash One (USD)<br />

2.0<br />

Potash One (CAD)<br />

Higher direct and indirect<br />

capex<br />

Upgrade: Granulation +<br />

industrial potash<br />

<strong>K+S</strong> Legacy<br />

<br />

<br />

The capex expected for Phases 1 + 2 are in total about CAD 350 million higher than what is stated in<br />

the feasibility study of Potash One<br />

This is primarily attributable to an optimisation of the product mix (facilities for the production of<br />

granulated potassium chloride and industrial potash)<br />

* Conversion of USD into CAD at the exchange rate valid at the time of publication of the feasibility study: 1.07 CAD/USD<br />

November 2011<br />

<strong>K+S</strong> Group<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!