Statement - K+S Aktiengesellschaft
Statement - K+S Aktiengesellschaft
Statement - K+S Aktiengesellschaft
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>K+S</strong> Group<br />
Ramp-up Curve<br />
Production capacity<br />
in mln. t KCl/a<br />
4.0<br />
3.5<br />
3.0<br />
2.5<br />
2.0<br />
1.5<br />
1.0<br />
0.5<br />
0.0<br />
Phase 2 – Development of secondary mining<br />
Phase 1 – Primary mining<br />
Outlook for Phase 3 –<br />
Expansion of secondary mining<br />
2011'12 '13 '14 '15 '16 '17 '18 '19 '20 '21 '22 '23 '24 '25 '26 '27 '28 '29 '30 '31 '32 '33 '34 '35<br />
1.14<br />
0.86<br />
2.00<br />
Phase 1<br />
(Implementation: 2011 to 2017)<br />
Phase 2<br />
(Implementation: 2016 to 2023)<br />
Outlook for Phase 3<br />
(Implementation: 2023 to 2034)<br />
● Development of infrastructure mainly for Phases 1 + 2, preparations for Phase 3<br />
● Capacity development + ramp-up of production to 2.0 mln. t KCl/a through primary mining<br />
● Capacity expansion and ramp-up of production by 0.86 to 2.86 mln. t KCl/a<br />
through secondary mining (share of secondary mining in total capacity: 30%)<br />
● Increase in share of secondary mining in total capacity to 50%<br />
● Potential expansion of annual capacity by 1.14 to 4.0 mln. t KCl/a<br />
November 2011<br />
<strong>K+S</strong> Group<br />
5