Putting Hi-Point to the test<br />
Putting Hi-Point to the test<br />
The six hour roof<br />
Putting Hi-Point to the test, the MOD/Defence Estates urgently<br />
required ten new accommodation buildings within an<br />
extremely tight, if not almost impossible, timescale.<br />
After lifting into position, 748 square metres of pre-coated<br />
Hi-Point standing seam roofing were installed in just six hours.<br />
Thereafter the weathering process of joints, gutters and<br />
fascias was completed.<br />
The roofing components were manufactured at the dedicated<br />
Hi-Point factory in Haydock and transported to site as a ‘kit of<br />
parts’ for assembly. Due to both the number and size of the<br />
roofs, assembly took place on a nearby, disused World War II<br />
runway where the roofs could be ‘called off’ and installed as<br />
required.<br />
Hi-Point off-site roof system 11