High speed Hi-Point dramatically cuts installation time<br />

High speed Hi-Point<br />

dramatically cuts<br />

installation time<br />

The roof installation programme for a multi-storey luxury<br />

apartment block in Liverpool was dramatically cut to just<br />

two days, thanks to the use of the new Hi-Point roofing<br />

system from <strong>Kalzip</strong>.<br />

At 27 storeys the residential development, which is part of the<br />

mixed use Unity Project, presented numerous challenges, not<br />

least because of its location in the heart of the city centre.<br />

Owing to the scale of the project; speed of installation,<br />

increased safety and reduced man-hours working at height,<br />

were prime considerations for designers Dane Architectural<br />

and main contractors Laing O’Rourke. The striking 1.5 degree<br />

pitched Hi-Point gull wing roof, which sits 94 metres above the<br />

ground, proved to be the ideal solution.<br />

The full 22 modules, which were precision manufactured and<br />

assembled by <strong>Kalzip</strong> under factory controlled conditions, were<br />

lifted and bolted into position in just two days allowing<br />

significant reductions to be made in both the roof installation<br />

programme and the overall site time.<br />

The frames for the roof sections were constructed from cold<br />

rolled channel sections produced by <strong>Kalzip</strong> Construction and<br />

Engineering Products, and, as whole life performance and<br />

durability were also important factors in the specification of the<br />

roof, the Hi-Point system was equipped with a fully insulated,<br />

built up <strong>Kalzip</strong> system. Incorporating steel liner panels from<br />

<strong>Kalzip</strong> Panels and Profiles the system was topped with 1.2 mm<br />

clad stucco embossed <strong>Kalzip</strong> 400 aluminium standing seam<br />

sheets. A range of <strong>Kalzip</strong> fabrications including verge and roof<br />

flashings, mono ridge and verge capping details, were also<br />

specified in a stainless steel finish to complement the wall<br />

panels, all of which were manufactured by the <strong>Kalzip</strong><br />

Fabrication department.<br />

The 398 square metre <strong>Kalzip</strong> standing seam roof also features<br />

a 25 metre long thermoplastic polyolefin (TPO) walkable<br />

insulated membrane gutter, produced in two modules for<br />

connection on site. Fully recyclable, the TPO gutters are also<br />

environmentally friendly and produce no harmful gas emissions<br />

during the manufacture or the hot-air welding process.<br />