Pre-design Reports (1) 2007 Updated Fill Volumes (2)<br />

Landfill Phase<br />

20% MC<br />

(scfm)<br />

35% MC<br />

(scfm)<br />

Scenario 1<br />

(35% MC with Constraints)<br />

(scfm)<br />

Phase 1 250 425 480<br />

Phase 2 550 675 980<br />

Phase 3 2,200 2,650 3,675<br />

Total at Landfill Closure 2,500 2,820 4,360<br />

Notes:<br />

(1) As estimated in the CH2M HILL July 2002 and October 2004 Pre-design reports.<br />

(2) Updated waste volumes estimated by SHA in the April 2007 report.<br />

MC = Moisture Content