Applied Environmental Conditions<br />

for Clearing KAHRAMAA Projects<br />

....<br />

–<br />

االشتراطات البيئية<br />

لتصاريح مشاريع كهرماء<br />

تابع<br />

5. The contractor should implement the HSE<br />

manual & safety procedures that approved<br />

by KAHRAMAA top .management.<br />

6. The site should be kept clean and wastes<br />

at work site should be disposed on a<br />

continuous basis to avoid accidents during<br />

work progress.<br />

7. The contactor should coordinate with the<br />

local municipality to make sure that all the<br />

waste materials & debris has been removed<br />

or disposed as per applicable procedures.<br />

8. Any deletion or amendment in this permit<br />

will cancel its validity and HSE has right to<br />

take necessary action against the<br />

contractor or the lined dept.<br />

‏ٌجب على المقاول إتباع دلٌل الصحة والسالمة والبٌئة<br />

المعتمد من كهرماء...‏<br />

من مسؤولٌات المقاول االهتمام بنظافة الموقع وإزالة<br />

المخلفات من موقع العمل باستمرار لتجنب وقوع<br />

الحوادث أثناء سٌر العمل.‏<br />

‏ٌجب على المقاول التنسٌق مع البلدٌة المختصة<br />

لضمان التخلص من جمٌع أنواع المخلفات الناتجة و<br />

حسب اإلجراءات المتبعة.‏<br />

أي حذف أو تعدٌل فً‏ التصرٌح البٌئً‏ بدون موافقة<br />

إدارة الصحة والسالمة والبٌئة ‏ٌعد مخالفة لالشتراطات<br />

البٌئٌة وٌلغً‏ صالحٌته،‏ وٌكون إلدارة الصحة<br />

والسالمة والبٌئة الحق فً‏ اتخاذ اإلجراء الضروري<br />

ضد المقاول أو الجهة المخالفة.‏<br />

.5<br />

.6<br />

.7<br />

.8<br />

9. This permit or a copy there of should be<br />

kept at project site.<br />

10. The permit does not dispense the<br />

approval of other necessary authorized<br />

utilities.<br />

11. HSE shall have the right to audit the<br />

implementation of clearance given condition<br />

if necessary.<br />

12. Once the work is completed; the<br />

contactor the line department should inform<br />

HSE.<br />

13. The contractor must remove all<br />

machineries and equipment at the project<br />

completion the site should be left clean .to<br />

this, a certificate issued by the concerned<br />

municipality should be obtained.<br />

14. HSE will not carry any blames for<br />

delaying if contractor or line department did<br />

not submit all necessary information on<br />

time with this form.<br />

9. ضرورة االحتفاظ بنسخة من التصرٌح البٌئً‏ فً‏ موقع<br />

المشروع.‏<br />

هذا التصرٌح ال ‏ٌغنً‏ عن موافقة الجهات الخدمٌة<br />

المختصة األخرى.‏<br />

‏ٌحق إلدارة الصحة والسالمة والبٌئة التأكد<br />

والتدقٌق على تطبٌق شروط التصرٌح عند الضرورة.‏<br />

‏ٌجب على اإلدارة المعنٌة أو المقاول إبالغ إدارة<br />

الصحة والسالمة والبٌئة عند االنتهاء من المشروع.‏<br />

‏ٌجب على المقاول إزالة جمٌع اآلالت والمعدات<br />

بعد االنتهاء من المشروع وترك الموقع نظٌفاً‏ وإٌداع<br />

إدارة الصحة والسالمة والبٌئة نسخة من شهادة البلدٌة<br />

المختصة بذلك لضمها إلى الملف.‏<br />

إدارة الصحة والسالمة والبٌئة غٌر مسؤولة عن<br />

أي تأخٌر قد ‏ٌحدث فً‏ حالة عدم قٌام المقاول أو<br />

اإلدارة المعنٌة بتقدٌم كافة المعلومات الضرورٌة فً‏<br />

الوقت المحدد مع نموذج التصرٌح البٌئً.‏<br />

.10<br />

.11<br />

.12<br />

.13<br />

.14