23.03.2014 Views

DISTRIBUTION AUTHORIZATION CODE OF PRACTICE - Kahramaa

DISTRIBUTION AUTHORIZATION CODE OF PRACTICE - Kahramaa

DISTRIBUTION AUTHORIZATION CODE OF PRACTICE - Kahramaa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ED-EDM-P-7<br />

PROCEDURE<br />

FOR<br />

LICENSING<br />

ELECTRICAL FITTERS<br />

Issue: 3.0 23-03-2010 Unclassified Page 1 of 18


Issue: 3.0 23-03-2010 Unclassified Page 2 of 18


Table of Contents<br />

Contents<br />

Page<br />

Title Page 1<br />

Table of Contents 3<br />

Purpose 4<br />

Scope 4<br />

Responsibilities and Authorities 4<br />

Abbreviations, Definitions of Terms and Key References 4<br />

Procedure 5<br />

5.1 Applying for New Licences 5<br />

5.2 Validity of the Licences 6<br />

5.3 Renewing the Licences 6<br />

5.4 Replacing Lost or Worn out or Destroyed Licences 6<br />

6.0 Cancellation of License and Re-test 6<br />

Appendices<br />

1 Application Form for New/Renew/Replace Licence 7<br />

2 Schedule of Fees 8<br />

3 Specimen copy of Certificate from KAHRAMAA 9<br />

4 Specimen copy of Fitter Licence 10<br />

5. Electrical Fitter Licensing Test- Assessment Sheet 11<br />

Issue: 3.0 23-03-2010 Unclassified Page 3 of 18


1. Purpose<br />

The purpose of this procedure is to describe:<br />

how to apply for a Electrical Fitter Licence<br />

how to renew the licence, and<br />

how to request for a replacement licence.<br />

Electricity jointers performing electrical fitter work in Qatar are required by law to<br />

possess a valid electrical fitter licence issued by KAHRAMAA. In Qatar,<br />

KAHRAMAA issues Electrical Fitter licences to work on electricity distribution<br />

systems with voltage level up to 11kV.<br />

Electrical fitter work includes performing limited specialist work for installation,<br />

operation and maintenance of switchgears and electricity distribution substation<br />

equipment and any machinery that control, protect and monitor the electricity flow.<br />

The licences are issued by KAHRAMAA after reviewing the applications and testing<br />

the applicants to ensure that the Fitters have the right qualifications for the work.<br />

This is to ensure their safety and to protect the electricity distribution network.<br />

2. Scope<br />

All persons such as KM, Contractors staff etc. performing Electrical Fitting work in<br />

Qatar are by law required to have a valid licence issued by KAHRAMAA.<br />

3. Responsibilities & Authorities<br />

KAHRAMAA Electricity Distribution Department is responsible for processing all<br />

applications for Electrical Fitter licences.<br />

KAHRAMAA’s authority is set out in Article No. 4 of the Emiri Resolution No.(45)-<br />

2009.<br />

4. Abbreviations, Definition of Terms & Key References<br />

HV : High voltage EDD : Electricity Distribution Dept<br />

Term<br />

Electrical Fitter<br />

licence<br />

Description<br />

Subject to particular conditions or restrictions included in the<br />

licence, an electrical fitter licence authorises the holder to perform<br />

electrical work on any apparatus, equipments and conductors<br />

which are normally operated at KAHRAMAA Distribution Network<br />

voltages upto 33 kV to the extent of the following:<br />

(a) Installation,<br />

(b) Repair,<br />

(c) Maintence,<br />

(d) Test<br />

Issue: 3.0 23-03-2010 Unclassified Page 4 of 18


5. Procedure<br />

5.1 Applying for new licence<br />

5.1.1 You will need to fill out the application form, Application for Electrical Fitter<br />

Licence ED-EDM-P-7/F1 ( appendix 1 ). Take care in completing the form<br />

and provide all the information required. Incomplete or incorrect applications<br />

may be considered withdrawn. The application fee is not refunded for<br />

unsuccessful candidate.<br />

5.1.2 Pre-requisite qualifications and experience are:<br />

The applicant must have secondary level education and basic fundamental<br />

knowledge in electricity. With (4-6) years experience in the concerned<br />

field.<br />

The applicant must be able to read, write and understand English as well<br />

as Fitting instruction manuals and drawings. He must attend and pass an<br />

oral test on English language to qualify for the practical test.<br />

The applicant must not be color blind. (To identify Red, Yellow & Blue<br />

color in Busbar or in termination).<br />

5.1.3 What you need to include?<br />

Two passport size photographs.<br />

If your application is approved , then the payment receipt issued by KM<br />

Customer Service cashier for the right amount of fees as per schedule of<br />

fees in Appendix 2 ( For Contractors)<br />

5.1.4 KAHRAMAA EDD will advise all approved applicants of the date, time and<br />

venue for the practical test. Any Materials required for the tests will be<br />

provided by KAHRAMAA.<br />

5.1.5 Test procedures<br />

a. The concerned Fitter must pass the interview and practical test of the<br />

following methods:<br />

Installation of different types of 11kV and MV Equipments<br />

Maintenance of all types of 11kV and MV Equipments<br />

<br />

<br />

Trouble shooting of all types of 11kV and MV Equipments<br />

Safety regulations of Fitting work requirement mentioned in KAHRAMAA<br />

Safety Rules<br />

b. Practical Test will be carried out at KAHRAMAA Workshop or at Site under<br />

the direct supervision of KAHRAMAA representative.<br />

5.1.6. Test result<br />

1. The result of the test will be communicated in writing after the test<br />

completion date within two weeks.<br />

2. A certificate (as per appendix-3) and a trade license in laminated form with<br />

photograph (as per appendix-4) will be issued to the successful applicant by<br />

KAHRAMAA.<br />

3. Unsuccessful applicant will only be allowed to apply for re-test after regular<br />

practices of at least three months to improve his skillnes/proficiency of the<br />

weak points in the test.<br />

Issue: 3.0 23-03-2010 Unclassified Page 5 of 18


4. The decision of KAHRAMAA shall be considered as final and any complaint<br />

against the testing method or the result shall not be entertained.<br />

5. During work, all fitters must carry the licence with them and produce on<br />

demand by KAHRAMAA Engineers/Inspectors.<br />

5.2. Validity of the licences<br />

The validity of each licence shall end on the last day of each Gregorian calendar<br />

year i.e. 31 st December (same year).<br />

5.3 Renewing the Licences<br />

5.3.1 The old licence shall be submitted to KAHRAMAA with the necessary fees for<br />

renewal at least 15 days before expiry.<br />

5.3.2 You will need to fill out the application form, Application for Electrical Fitter<br />

Licence ED-EDM-P-7/F1 ( appendix 1 ). Take care in completing the form<br />

and provide all the information required. Incomplete or incorrect applications<br />

may be considered withdrawn. The application fee is not refunded for<br />

incomplete or incorrect applications.<br />

5.3.3 KAHRAMAA reserves the right to cancel or suspend any licence at any time<br />

and may require the applicant to be re-tested without having to provide any<br />

explanations.<br />

5.4 Replacing Lost or Worn out or Destroyed Licences<br />

5.4.1 If at anytime, a licence is lost or damaged, then an application for a<br />

replacement licence card must be made immediately.<br />

5.4.2 You will need to fill out the application form, Application for Electrical Fitter<br />

Licence ED-EDM-P-7/F1 ( appendix 1 ). Take care in completing the form<br />

and provide all the information required. Incomplete or incorrect applications<br />

may be considered withdrawn. The application fee is not refunded for<br />

incomplete or incorrect applications.<br />

5.4.3 KAHRAMAA reserves the right to reject any application for replacement without<br />

having to provide any explanations.<br />

6. Cancellation of license and retest<br />

KAHRAMAA reserves the right to cancel the license at any time and may ask for retest<br />

if required.<br />

The Fitter trade license will be cancelled if the license holder is found responsible for<br />

bad workmanship, violation of safety rules , negligence in work code of practice etc .<br />

Issue: 3.0 23-03-2010 Unclassified Page 6 of 18


Appendix – 1<br />

Form No. – ED-EDM-P-7/F1<br />

ELECTRICITY <strong>DISTRIBUTION</strong> DEPARTMENT<br />

Licence Application Form for Electrical Fitter<br />

Type of Application (circle the box): New Renew Replace<br />

1. Company Details<br />

Name<br />

CR NO<br />

Address P.O. Box: Tel/Fax<br />

City<br />

Country<br />

Submitted on<br />

………………………………<br />

(date)<br />

Note: Applied Company should be a pre-qualified contractor of KAHRAMAA.<br />

2. Candidate Details<br />

Name ID #<br />

Sponsor<br />

Qualification<br />

D.O.B<br />

Tel/Fax<br />

Address P.O Box: City Country<br />

Note: Applicant must not be a colour blind.<br />

Applicant must have RP of the same Company with minimum six month validity<br />

Attachments: ID/Passport copy + 2 passport size photographs + Valid RP copy<br />

3. Authorized Authority<br />

Name :<br />

Position :<br />

Signature :<br />

Company Stamp & Date:<br />

Note: Incomplete/improper applications will be rejected.<br />

4. Office use only<br />

Approved / Not Approved*<br />

JASSIM ALI SHAMS<br />

HEAD <strong>OF</strong> MAINTENANCE<br />

*Delete as required<br />

ABDULLA ALI AL DEYAB<br />

MANAGER, ELECTRICITY <strong>DISTRIBUTION</strong> DEPT<br />

ED-EDM-P-7 Issue: 3.0 23-03-2010 Page 1 of 1<br />

Issue: 3.0 23-03-2010 Unclassified Page 7 of 18


Appendix – 2: Schedule of Fees**<br />

Type of Test<br />

Cost of Test<br />

FITTER TRADE TEST QRs. 1500.00<br />

** ‘Fees are subject to change without prior notice.’ & based on materials &<br />

manpower<br />

Issue: 3.0 23-03-2010 Unclassified Page 8 of 18


Appendix – 3: Fitter Certificate from KAHRAMAA<br />

Ref:<br />

Date:<br />

Mr…..<br />

M/S………<br />

P.O. Box:<br />

Doha - Qatar<br />

SUB: FITTING ( FOREMAN/FITTER)* TRADE TEST<br />

I am pleased to advise you that, following your successful completion of Fitting<br />

tests, you have demonstrated sufficient ability to carry out 11kV/LV Fitting works as<br />

(FOREMAN/FITTER).<br />

This letter will serve as your certificate of being (FOREMAN/FITTER)* within the<br />

State of Qatar.<br />

This Certificate is valid until 31 st December, 201…….<br />

With Regards,<br />

MANAGER<br />

ELECTRICITY <strong>DISTRIBUTION</strong> DEPARTMENT<br />

CC:<br />

Head of Maintenance (Distribution)<br />

Archive<br />

*Delete as required.<br />

Issue: 3.0 23-03-2010 Unclassified Page 9 of 18


Appendix – 4: KAHRAMAA Licence Card (Specimen Copy)<br />

PHOTO<br />

Electricity Network Affairs<br />

Electricity Distribution Dept<br />

Electrical Fitter Licence<br />

شؤون شبكاث الكهرباء<br />

إدارة التىزيع الكهربائي<br />

رخصت فني تركيب<br />

NAME :<br />

ID NO.:<br />

CO.NAME:<br />

AUTHORIZED TO :<br />

VALIDITY:<br />

work as Fitting Forman/ Fitter on<br />

distribution system<br />

االسم:‏<br />

الرقم الشخصي:‏<br />

اسم الشركة:‏<br />

مرخص لعمل:‏<br />

الصالحية:‏<br />

This licence must be with the<br />

holder while carry out Fitting<br />

work and produce on demand by<br />

KAHRAMAA Engineers /<br />

Inspectors<br />

هذه الرخصة يجب أن تكون<br />

مع حاملها أثناء قيامه بأعمال<br />

التركيب ويجب إبرازها عند<br />

الطلب بواسطة مهندسي أو<br />

مفتشي كهرماء.‏<br />

Authorized to receive safety<br />

document.<br />

PTW<br />

LOA<br />

PTW<br />

LOA<br />

‏*مخول الستالم مستندات<br />

السالمة.‏<br />

سلطة لترخيص..............................‏ AUTHORITY…....……………………. LICENSING<br />

Issue: 3.0 23-03-2010 Unclassified Page 10 of 18


Appendix – 5: Electrical Fitter Licensing Test – Assessment Sheet<br />

Date of Test<br />

(dd/mm/yyyy):<br />

Type of Test (Tick the circle): ◦ New ◦ Renew ◦ Replace ◦ Re-test<br />

Candidate Details<br />

Name ID #<br />

Sponsor<br />

Sponsor Tel./Fax<br />

ID Validity<br />

Birth date:<br />

dd/mm/yy<br />

P.O Box: City Nationality<br />

Oral Test Assessment Results:<br />

DETAIL Pass Fail Remarks<br />

1. General Knowledge<br />

◦ ◦<br />

2. Knowledge on substation equipments ◦ ◦<br />

3. Knowledge on Installation ◦ ◦<br />

4. Knowledge on Safety ◦ ◦<br />

5. Knowledge on Maintenance ◦ ◦<br />

English Language Skill<br />

Speak ◦ ◦<br />

Read ◦ ◦<br />

Write ◦ ◦<br />

Colour blind test ( Identify Red, Yellow &<br />

Blue color of Busbar)<br />

◦ ◦<br />

Allowed to proceed to Practical Test ? ◦ Yes ◦ No<br />

Name & Signature of Examiners (minimum two)<br />

Name: _______________________________ Signature: _________________<br />

Name: _______________________________ Signature: _________________<br />

Name: _______________________________ Signature: _________________<br />

Approved by Sr. Engr. Substation<br />

_________________________<br />

Date:<br />

Issue: 3.0 23-03-2010 Unclassified Page 11 of 18


Practical Test Assessment Results:<br />

Date of Test<br />

(dd/mm/yy):<br />

Candidate Name ID #<br />

DETAIL Pass Fail Remarks<br />

1. 11kV Indoor Panels(Trouble shooting):-<br />

a) Vacuum ◦ ◦<br />

b) Oil ◦ ◦<br />

2. 11kV Outdoor Switchgears (Trouble<br />

shooting):-<br />

a) SF6 ◦ ◦<br />

b) Oil ◦ ◦<br />

3. Earthing for substation ◦ ◦<br />

4. Details of Substation Installations<br />

a) Indoor ◦ ◦<br />

b) Outdoor ◦ ◦<br />

PRACTICAL TEST RESULT ◦ Passed ◦ Failed<br />

Name & Signature of Examiners (minimum two)<br />

Name: _______________________________<br />

Name: _______________________________<br />

Name: _______________________________<br />

Signature: _________________<br />

Signature: _________________<br />

Signature: _________________<br />

Approved by Sr. Engr. Substation<br />

_________________________<br />

Date:<br />

Note:<br />

Checklist for practical test must be completed for each candidate and attached for Senior<br />

Engineer review.<br />

Issue: 3.0 23-03-2010 Unclassified Page 12 of 18


Practical Test Checklists:<br />

Candidate Name:<br />

Date of Test (dd/mm/yy):<br />

NO. DETAIL DESCRIPTION<br />

1. 11kV indoor<br />

panel-vaccum<br />

trouble sooting:<br />

a) Panel circuit<br />

earth switch<br />

stuck & fails to<br />

close earth<br />

switch<br />

b) VCB not<br />

closing in<br />

service position<br />

Ensure VCB is in off position & located at test<br />

position or outside the panel<br />

Ensure panel allignment done properly or not<br />

Ensure earth switch position<br />

Ensure earth switch pad locking condition<br />

Ensure earth switch mechanism physically to see<br />

any damage<br />

Ensure earth switch fixed & moving contact<br />

position<br />

Ensure earth switch operating lever free of<br />

movements<br />

Ensure earth switch fixed & moving contact<br />

lubrication<br />

Ensure earth switch handle not damage/bend<br />

Ensure earth switch internal mechanism properly<br />

fixed, mechanism mounting bolt tightened or not<br />

Ensure panel installation done properly or not<br />

Ensure panel VCB in proper position or not<br />

Ensure panel ckt earth switch mechanism open &<br />

earth switch in off position<br />

Ensure VCB spring charged or not<br />

Ensure all mechanical/electrical interlocks<br />

released & in proper position<br />

Ensure auxillary control plug inserted or not<br />

Ensure visually there is no any obstruction to<br />

proper position of VCB<br />

Ensure VCB mechanism healthy<br />

Ensure any tripping from protection relays &<br />

resetted the same or not<br />

Ensure tripping mechanism released or not<br />

Ensure control supply available for closing coil or<br />

not<br />

Ensure any upstream end interlock released or<br />

not<br />

REMARKS<br />

DONE<br />

NOT<br />

DONE<br />

Issue: 3.0 23-03-2010 Unclassified Page 13 of 18


NO DETAIL DESCRIPTION REMARKS<br />

1 11kv indoor<br />

panel-oil trouble<br />

sooting<br />

a) OCB fails to<br />

spring<br />

charge/closing<br />

Ensure that charging handle available<br />

Ensure that OCB mechanism fully<br />

healthy<br />

Ensure that OCB any pins or matal parts<br />

not beoken.<br />

Ensure that OCB mechanism in normal<br />

and locked.<br />

Ensure that OCB allignment properly<br />

done.<br />

Ensure that OCB properly rack in fully at<br />

particular selected position.<br />

Ensure OCB mechanism front cover<br />

properly closed<br />

Ensure OCB mechanism properly<br />

cleaned with solvent and lubricated<br />

Ensure OCB spring charged fully or not<br />

DONE<br />

NOT DONE<br />

Issue: 3.0 23-03-2010 Unclassified Page 14 of 18


Candidate Name:<br />

Date of Test (dd/mm/yy):<br />

NO DETAIL DESCRIPTION REMARKS<br />

2 11kV outdoor<br />

switchgear-SF6<br />

trouble shooting<br />

a) RMU ring<br />

switch cable<br />

access cover not<br />

able to open<br />

Ensure RMU ring switch position<br />

Ensure RMU ring switch off-earthed<br />

Ensure RMU ring switch earth on shutter<br />

properly engaged<br />

Ensure RMU ring switch earth on<br />

indication in proper position<br />

Ensure RMU ring switch mechanism<br />

healthiness<br />

Ensure RMU ring switch test lever into<br />

test position<br />

Ensure RMU ring switch cable test<br />

access cover mech lever in proper<br />

position & healthy<br />

Ensure RMU ring switch cable test<br />

access cover safety padlock removed<br />

Ensure RMU ring switch test lever free<br />

for operation.<br />

DONE<br />

NOT DONE<br />

b) TX Switch<br />

fails to close<br />

Ensure RMU Tx switch on shutter full<br />

engaged & in proper position<br />

Ensure RMU push/pull to trip lever in<br />

normal position<br />

Ensure RMU Tx switch mechanism<br />

healthy and spring charged.<br />

Ensure RMU Tx switch cable test access<br />

cover properly closed<br />

Ensure RMU Tx switch TLF fuses healthy<br />

Ensure RMU Tx switch handle acess<br />

lever healthy.<br />

Ensure Tx switch properly resetted and<br />

spring charged.<br />

Issue: 3.0 23-03-2010 Unclassified Page 15 of 18


NO DETAIL DESCRIPTION REMARKS<br />

3. Earthing of<br />

substation<br />

Knowledge of earth bore construction &<br />

connections<br />

YES<br />

NO<br />

Knowledge of earth conductor sizes.<br />

Knowledge of earth rod requirements.<br />

Knowledge of earth bore water level.<br />

Knowledge of measurement of earth<br />

bore water level & depth.<br />

Knowledge of earth bore backfilling<br />

material<br />

Knowledge of KM standard requirements<br />

of earth resistance<br />

Knowledge of indoor/outdoor sub station<br />

loop earthing & loop earthing condition.<br />

Issue: 3.0 23-03-2010 Unclassified Page 16 of 18


NO DETAIL DESCRIPTION REMARKS<br />

4.<br />

Sub-station<br />

installation<br />

a) indoor<br />

Knowledge for installation sequence of<br />

indoor switchgear to refer scheme drawing.<br />

Knowledge of indoor substation<br />

measurement before installation of indoor<br />

switchgear.<br />

Knowledge of panel allighments, grouting,<br />

bolting & coupling.<br />

Knowledge of main busbar fitting and torque<br />

tigntness at compartment<br />

Knowledge of provision of shroud on main<br />

busbar<br />

Knowledge of CB's test, service operation<br />

with interlock sequence<br />

YES<br />

NO<br />

Knowledge of panel circuit/busbar earthing<br />

Knowledge to provide lubrication for moving<br />

parts & application of petroleum jelly on main<br />

& earth contact<br />

Knowledge to provide ac supply<br />

connection,dc supply connection, tx-prv<br />

connection,mv panel ref connection<br />

Knowledge of battery charger battery bank<br />

connection & operation of battery charger<br />

Knowledge of sub-station main earth & loop<br />

earth connections to indoor panel<br />

Knowledge of tools & tool rack fixing<br />

Knowledge of sub-station name plate<br />

requirement<br />

Knowledge of sub-station transformer<br />

installation like centering & levelling of<br />

transformer,transformer oil level, earth<br />

connection, tap changer position, prv<br />

connection. etc<br />

Knowledge of free standing/bolt-on feeder<br />

pillar installation like feeder pillar level,<br />

grouting, provision of 30ahrc fuse, cable<br />

connection to s/stn db & earthing connection<br />

Knowledge of indoor sub-station civil work,<br />

floor painting, lighting, shaker plates<br />

requirements, door arrangement of fixing km<br />

sub-station padlock<br />

Issue: 3.0 23-03-2010 Unclassified Page 17 of 18


NO DETAIL DESCRIPTION REMARKS<br />

4) Sub-station<br />

Installation<br />

b) Outdoor<br />

Knowledge of outdoor switchgear<br />

installation sequence to refer scheme<br />

drawing<br />

Knowledge to check plinth condition &<br />

measurement before installation of<br />

outdoor switchgear<br />

Knowledge of RMU/fuse switch/ring<br />

switch allingment, levelling, grouting<br />

YES<br />

NO<br />

Knowledge of 11kv HRC/tlf fuse capacity<br />

Knowledge of outdoor switchgear oil/gas<br />

level.<br />

Knowlegde of procedure for band joint,<br />

end cap sleeving & covers<br />

Knowledge of fixing earth fault indicator,<br />

cbct requirement and auxillary connection<br />

to earth fault indicator<br />

Knowledge of testing earth fault indicator<br />

Knowledge of outdoor switchgear<br />

operation & interlock sequence<br />

Knowledge of outdoor switchgear<br />

greasing & testing mechanism<br />

Knowledge of outdoor switchgear main<br />

earth/loop earth connection<br />

Knowledge of outdoor sub-station<br />

transformer installation like centering &<br />

levelling of transformer,transformer oil<br />

level, earth connection, any leakage, tap<br />

changer position,<br />

Knowledge of free standing/bolt-on<br />

feeder pillar installation like feeder pillar<br />

level, grouting, provision of 30A HRC<br />

fuse, cable connection to efi & earthing<br />

connection<br />

Issue: 3.0 23-03-2010 Unclassified Page 18 of 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!