ED-EDM-P-7<br />
PROCEDURE<br />
FOR<br />
LICENSING<br />
ELECTRICAL FITTERS<br />
Issue: 3.0 23-03-2010 Unclassified Page 1 of 18
Issue: 3.0 23-03-2010 Unclassified Page 2 of 18
Table of Contents<br />
Contents<br />
Page<br />
Title Page 1<br />
Table of Contents 3<br />
Purpose 4<br />
Scope 4<br />
Responsibilities and Authorities 4<br />
Abbreviations, Definitions of Terms and Key References 4<br />
Procedure 5<br />
5.1 Applying for New Licences 5<br />
5.2 Validity of the Licences 6<br />
5.3 Renewing the Licences 6<br />
5.4 Replacing Lost or Worn out or Destroyed Licences 6<br />
6.0 Cancellation of License and Re-test 6<br />
Appendices<br />
1 Application Form for New/Renew/Replace Licence 7<br />
2 Schedule of Fees 8<br />
3 Specimen copy of Certificate from KAHRAMAA 9<br />
4 Specimen copy of Fitter Licence 10<br />
5. Electrical Fitter Licensing Test- Assessment Sheet 11<br />
Issue: 3.0 23-03-2010 Unclassified Page 3 of 18
1. Purpose<br />
The purpose of this procedure is to describe:<br />
how to apply for a Electrical Fitter Licence<br />
how to renew the licence, and<br />
how to request for a replacement licence.<br />
Electricity jointers performing electrical fitter work in Qatar are required by law to<br />
possess a valid electrical fitter licence issued by KAHRAMAA. In Qatar,<br />
KAHRAMAA issues Electrical Fitter licences to work on electricity distribution<br />
systems with voltage level up to 11kV.<br />
Electrical fitter work includes performing limited specialist work for installation,<br />
operation and maintenance of switchgears and electricity distribution substation<br />
equipment and any machinery that control, protect and monitor the electricity flow.<br />
The licences are issued by KAHRAMAA after reviewing the applications and testing<br />
the applicants to ensure that the Fitters have the right qualifications for the work.<br />
This is to ensure their safety and to protect the electricity distribution network.<br />
2. Scope<br />
All persons such as KM, Contractors staff etc. performing Electrical Fitting work in<br />
Qatar are by law required to have a valid licence issued by KAHRAMAA.<br />
3. Responsibilities & Authorities<br />
KAHRAMAA Electricity Distribution Department is responsible for processing all<br />
applications for Electrical Fitter licences.<br />
KAHRAMAA’s authority is set out in Article No. 4 of the Emiri Resolution No.(45)-<br />
2009.<br />
4. Abbreviations, Definition of Terms & Key References<br />
HV : High voltage EDD : Electricity Distribution Dept<br />
Term<br />
Electrical Fitter<br />
licence<br />
Description<br />
Subject to particular conditions or restrictions included in the<br />
licence, an electrical fitter licence authorises the holder to perform<br />
electrical work on any apparatus, equipments and conductors<br />
which are normally operated at KAHRAMAA Distribution Network<br />
voltages upto 33 kV to the extent of the following:<br />
(a) Installation,<br />
(b) Repair,<br />
(c) Maintence,<br />
(d) Test<br />
Issue: 3.0 23-03-2010 Unclassified Page 4 of 18
5. Procedure<br />
5.1 Applying for new licence<br />
5.1.1 You will need to fill out the application form, Application for Electrical Fitter<br />
Licence ED-EDM-P-7/F1 ( appendix 1 ). Take care in completing the form<br />
and provide all the information required. Incomplete or incorrect applications<br />
may be considered withdrawn. The application fee is not refunded for<br />
unsuccessful candidate.<br />
5.1.2 Pre-requisite qualifications and experience are:<br />
The applicant must have secondary level education and basic fundamental<br />
knowledge in electricity. With (4-6) years experience in the concerned<br />
field.<br />
The applicant must be able to read, write and understand English as well<br />
as Fitting instruction manuals and drawings. He must attend and pass an<br />
oral test on English language to qualify for the practical test.<br />
The applicant must not be color blind. (To identify Red, Yellow & Blue<br />
color in Busbar or in termination).<br />
5.1.3 What you need to include?<br />
Two passport size photographs.<br />
If your application is approved , then the payment receipt issued by KM<br />
Customer Service cashier for the right amount of fees as per schedule of<br />
fees in Appendix 2 ( For Contractors)<br />
5.1.4 KAHRAMAA EDD will advise all approved applicants of the date, time and<br />
venue for the practical test. Any Materials required for the tests will be<br />
provided by KAHRAMAA.<br />
5.1.5 Test procedures<br />
a. The concerned Fitter must pass the interview and practical test of the<br />
following methods:<br />
Installation of different types of 11kV and MV Equipments<br />
Maintenance of all types of 11kV and MV Equipments<br />
<br />
<br />
Trouble shooting of all types of 11kV and MV Equipments<br />
Safety regulations of Fitting work requirement mentioned in KAHRAMAA<br />
Safety Rules<br />
b. Practical Test will be carried out at KAHRAMAA Workshop or at Site under<br />
the direct supervision of KAHRAMAA representative.<br />
5.1.6. Test result<br />
1. The result of the test will be communicated in writing after the test<br />
completion date within two weeks.<br />
2. A certificate (as per appendix-3) and a trade license in laminated form with<br />
photograph (as per appendix-4) will be issued to the successful applicant by<br />
KAHRAMAA.<br />
3. Unsuccessful applicant will only be allowed to apply for re-test after regular<br />
practices of at least three months to improve his skillnes/proficiency of the<br />
weak points in the test.<br />
Issue: 3.0 23-03-2010 Unclassified Page 5 of 18
4. The decision of KAHRAMAA shall be considered as final and any complaint<br />
against the testing method or the result shall not be entertained.<br />
5. During work, all fitters must carry the licence with them and produce on<br />
demand by KAHRAMAA Engineers/Inspectors.<br />
5.2. Validity of the licences<br />
The validity of each licence shall end on the last day of each Gregorian calendar<br />
year i.e. 31 st December (same year).<br />
5.3 Renewing the Licences<br />
5.3.1 The old licence shall be submitted to KAHRAMAA with the necessary fees for<br />
renewal at least 15 days before expiry.<br />
5.3.2 You will need to fill out the application form, Application for Electrical Fitter<br />
Licence ED-EDM-P-7/F1 ( appendix 1 ). Take care in completing the form<br />
and provide all the information required. Incomplete or incorrect applications<br />
may be considered withdrawn. The application fee is not refunded for<br />
incomplete or incorrect applications.<br />
5.3.3 KAHRAMAA reserves the right to cancel or suspend any licence at any time<br />
and may require the applicant to be re-tested without having to provide any<br />
explanations.<br />
5.4 Replacing Lost or Worn out or Destroyed Licences<br />
5.4.1 If at anytime, a licence is lost or damaged, then an application for a<br />
replacement licence card must be made immediately.<br />
5.4.2 You will need to fill out the application form, Application for Electrical Fitter<br />
Licence ED-EDM-P-7/F1 ( appendix 1 ). Take care in completing the form<br />
and provide all the information required. Incomplete or incorrect applications<br />
may be considered withdrawn. The application fee is not refunded for<br />
incomplete or incorrect applications.<br />
5.4.3 KAHRAMAA reserves the right to reject any application for replacement without<br />
having to provide any explanations.<br />
6. Cancellation of license and retest<br />
KAHRAMAA reserves the right to cancel the license at any time and may ask for retest<br />
if required.<br />
The Fitter trade license will be cancelled if the license holder is found responsible for<br />
bad workmanship, violation of safety rules , negligence in work code of practice etc .<br />
Issue: 3.0 23-03-2010 Unclassified Page 6 of 18
Appendix – 1<br />
Form No. – ED-EDM-P-7/F1<br />
ELECTRICITY <strong>DISTRIBUTION</strong> DEPARTMENT<br />
Licence Application Form for Electrical Fitter<br />
Type of Application (circle the box): New Renew Replace<br />
1. Company Details<br />
Name<br />
CR NO<br />
Address P.O. Box: Tel/Fax<br />
City<br />
Country<br />
Submitted on<br />
………………………………<br />
(date)<br />
Note: Applied Company should be a pre-qualified contractor of KAHRAMAA.<br />
2. Candidate Details<br />
Name ID #<br />
Sponsor<br />
Qualification<br />
D.O.B<br />
Tel/Fax<br />
Address P.O Box: City Country<br />
Note: Applicant must not be a colour blind.<br />
Applicant must have RP of the same Company with minimum six month validity<br />
Attachments: ID/Passport copy + 2 passport size photographs + Valid RP copy<br />
3. Authorized Authority<br />
Name :<br />
Position :<br />
Signature :<br />
Company Stamp & Date:<br />
Note: Incomplete/improper applications will be rejected.<br />
4. Office use only<br />
Approved / Not Approved*<br />
JASSIM ALI SHAMS<br />
HEAD <strong>OF</strong> MAINTENANCE<br />
*Delete as required<br />
ABDULLA ALI AL DEYAB<br />
MANAGER, ELECTRICITY <strong>DISTRIBUTION</strong> DEPT<br />
ED-EDM-P-7 Issue: 3.0 23-03-2010 Page 1 of 1<br />
Issue: 3.0 23-03-2010 Unclassified Page 7 of 18
Appendix – 2: Schedule of Fees**<br />
Type of Test<br />
Cost of Test<br />
FITTER TRADE TEST QRs. 1500.00<br />
** ‘Fees are subject to change without prior notice.’ & based on materials &<br />
manpower<br />
Issue: 3.0 23-03-2010 Unclassified Page 8 of 18
Appendix – 3: Fitter Certificate from KAHRAMAA<br />
Ref:<br />
Date:<br />
Mr…..<br />
M/S………<br />
P.O. Box:<br />
Doha - Qatar<br />
SUB: FITTING ( FOREMAN/FITTER)* TRADE TEST<br />
I am pleased to advise you that, following your successful completion of Fitting<br />
tests, you have demonstrated sufficient ability to carry out 11kV/LV Fitting works as<br />
(FOREMAN/FITTER).<br />
This letter will serve as your certificate of being (FOREMAN/FITTER)* within the<br />
State of Qatar.<br />
This Certificate is valid until 31 st December, 201…….<br />
With Regards,<br />
MANAGER<br />
ELECTRICITY <strong>DISTRIBUTION</strong> DEPARTMENT<br />
CC:<br />
Head of Maintenance (Distribution)<br />
Archive<br />
*Delete as required.<br />
Issue: 3.0 23-03-2010 Unclassified Page 9 of 18
Appendix – 4: KAHRAMAA Licence Card (Specimen Copy)<br />
PHOTO<br />
Electricity Network Affairs<br />
Electricity Distribution Dept<br />
Electrical Fitter Licence<br />
شؤون شبكاث الكهرباء<br />
إدارة التىزيع الكهربائي<br />
رخصت فني تركيب<br />
NAME :<br />
ID NO.:<br />
CO.NAME:<br />
AUTHORIZED TO :<br />
VALIDITY:<br />
work as Fitting Forman/ Fitter on<br />
distribution system<br />
االسم:<br />
الرقم الشخصي:<br />
اسم الشركة:<br />
مرخص لعمل:<br />
الصالحية:<br />
This licence must be with the<br />
holder while carry out Fitting<br />
work and produce on demand by<br />
KAHRAMAA Engineers /<br />
Inspectors<br />
هذه الرخصة يجب أن تكون<br />
مع حاملها أثناء قيامه بأعمال<br />
التركيب ويجب إبرازها عند<br />
الطلب بواسطة مهندسي أو<br />
مفتشي كهرماء.<br />
Authorized to receive safety<br />
document.<br />
PTW<br />
LOA<br />
PTW<br />
LOA<br />
*مخول الستالم مستندات<br />
السالمة.<br />
سلطة لترخيص.............................. AUTHORITY…....……………………. LICENSING<br />
Issue: 3.0 23-03-2010 Unclassified Page 10 of 18
Appendix – 5: Electrical Fitter Licensing Test – Assessment Sheet<br />
Date of Test<br />
(dd/mm/yyyy):<br />
Type of Test (Tick the circle): ◦ New ◦ Renew ◦ Replace ◦ Re-test<br />
Candidate Details<br />
Name ID #<br />
Sponsor<br />
Sponsor Tel./Fax<br />
ID Validity<br />
Birth date:<br />
dd/mm/yy<br />
P.O Box: City Nationality<br />
Oral Test Assessment Results:<br />
DETAIL Pass Fail Remarks<br />
1. General Knowledge<br />
◦ ◦<br />
2. Knowledge on substation equipments ◦ ◦<br />
3. Knowledge on Installation ◦ ◦<br />
4. Knowledge on Safety ◦ ◦<br />
5. Knowledge on Maintenance ◦ ◦<br />
English Language Skill<br />
Speak ◦ ◦<br />
Read ◦ ◦<br />
Write ◦ ◦<br />
Colour blind test ( Identify Red, Yellow &<br />
Blue color of Busbar)<br />
◦ ◦<br />
Allowed to proceed to Practical Test ? ◦ Yes ◦ No<br />
Name & Signature of Examiners (minimum two)<br />
Name: _______________________________ Signature: _________________<br />
Name: _______________________________ Signature: _________________<br />
Name: _______________________________ Signature: _________________<br />
Approved by Sr. Engr. Substation<br />
_________________________<br />
Date:<br />
Issue: 3.0 23-03-2010 Unclassified Page 11 of 18
Practical Test Assessment Results:<br />
Date of Test<br />
(dd/mm/yy):<br />
Candidate Name ID #<br />
DETAIL Pass Fail Remarks<br />
1. 11kV Indoor Panels(Trouble shooting):-<br />
a) Vacuum ◦ ◦<br />
b) Oil ◦ ◦<br />
2. 11kV Outdoor Switchgears (Trouble<br />
shooting):-<br />
a) SF6 ◦ ◦<br />
b) Oil ◦ ◦<br />
3. Earthing for substation ◦ ◦<br />
4. Details of Substation Installations<br />
a) Indoor ◦ ◦<br />
b) Outdoor ◦ ◦<br />
PRACTICAL TEST RESULT ◦ Passed ◦ Failed<br />
Name & Signature of Examiners (minimum two)<br />
Name: _______________________________<br />
Name: _______________________________<br />
Name: _______________________________<br />
Signature: _________________<br />
Signature: _________________<br />
Signature: _________________<br />
Approved by Sr. Engr. Substation<br />
_________________________<br />
Date:<br />
Note:<br />
Checklist for practical test must be completed for each candidate and attached for Senior<br />
Engineer review.<br />
Issue: 3.0 23-03-2010 Unclassified Page 12 of 18
Practical Test Checklists:<br />
Candidate Name:<br />
Date of Test (dd/mm/yy):<br />
NO. DETAIL DESCRIPTION<br />
1. 11kV indoor<br />
panel-vaccum<br />
trouble sooting:<br />
a) Panel circuit<br />
earth switch<br />
stuck & fails to<br />
close earth<br />
switch<br />
b) VCB not<br />
closing in<br />
service position<br />
Ensure VCB is in off position & located at test<br />
position or outside the panel<br />
Ensure panel allignment done properly or not<br />
Ensure earth switch position<br />
Ensure earth switch pad locking condition<br />
Ensure earth switch mechanism physically to see<br />
any damage<br />
Ensure earth switch fixed & moving contact<br />
position<br />
Ensure earth switch operating lever free of<br />
movements<br />
Ensure earth switch fixed & moving contact<br />
lubrication<br />
Ensure earth switch handle not damage/bend<br />
Ensure earth switch internal mechanism properly<br />
fixed, mechanism mounting bolt tightened or not<br />
Ensure panel installation done properly or not<br />
Ensure panel VCB in proper position or not<br />
Ensure panel ckt earth switch mechanism open &<br />
earth switch in off position<br />
Ensure VCB spring charged or not<br />
Ensure all mechanical/electrical interlocks<br />
released & in proper position<br />
Ensure auxillary control plug inserted or not<br />
Ensure visually there is no any obstruction to<br />
proper position of VCB<br />
Ensure VCB mechanism healthy<br />
Ensure any tripping from protection relays &<br />
resetted the same or not<br />
Ensure tripping mechanism released or not<br />
Ensure control supply available for closing coil or<br />
not<br />
Ensure any upstream end interlock released or<br />
not<br />
REMARKS<br />
DONE<br />
NOT<br />
DONE<br />
Issue: 3.0 23-03-2010 Unclassified Page 13 of 18
NO DETAIL DESCRIPTION REMARKS<br />
1 11kv indoor<br />
panel-oil trouble<br />
sooting<br />
a) OCB fails to<br />
spring<br />
charge/closing<br />
Ensure that charging handle available<br />
Ensure that OCB mechanism fully<br />
healthy<br />
Ensure that OCB any pins or matal parts<br />
not beoken.<br />
Ensure that OCB mechanism in normal<br />
and locked.<br />
Ensure that OCB allignment properly<br />
done.<br />
Ensure that OCB properly rack in fully at<br />
particular selected position.<br />
Ensure OCB mechanism front cover<br />
properly closed<br />
Ensure OCB mechanism properly<br />
cleaned with solvent and lubricated<br />
Ensure OCB spring charged fully or not<br />
DONE<br />
NOT DONE<br />
Issue: 3.0 23-03-2010 Unclassified Page 14 of 18
Candidate Name:<br />
Date of Test (dd/mm/yy):<br />
NO DETAIL DESCRIPTION REMARKS<br />
2 11kV outdoor<br />
switchgear-SF6<br />
trouble shooting<br />
a) RMU ring<br />
switch cable<br />
access cover not<br />
able to open<br />
Ensure RMU ring switch position<br />
Ensure RMU ring switch off-earthed<br />
Ensure RMU ring switch earth on shutter<br />
properly engaged<br />
Ensure RMU ring switch earth on<br />
indication in proper position<br />
Ensure RMU ring switch mechanism<br />
healthiness<br />
Ensure RMU ring switch test lever into<br />
test position<br />
Ensure RMU ring switch cable test<br />
access cover mech lever in proper<br />
position & healthy<br />
Ensure RMU ring switch cable test<br />
access cover safety padlock removed<br />
Ensure RMU ring switch test lever free<br />
for operation.<br />
DONE<br />
NOT DONE<br />
b) TX Switch<br />
fails to close<br />
Ensure RMU Tx switch on shutter full<br />
engaged & in proper position<br />
Ensure RMU push/pull to trip lever in<br />
normal position<br />
Ensure RMU Tx switch mechanism<br />
healthy and spring charged.<br />
Ensure RMU Tx switch cable test access<br />
cover properly closed<br />
Ensure RMU Tx switch TLF fuses healthy<br />
Ensure RMU Tx switch handle acess<br />
lever healthy.<br />
Ensure Tx switch properly resetted and<br />
spring charged.<br />
Issue: 3.0 23-03-2010 Unclassified Page 15 of 18
NO DETAIL DESCRIPTION REMARKS<br />
3. Earthing of<br />
substation<br />
Knowledge of earth bore construction &<br />
connections<br />
YES<br />
NO<br />
Knowledge of earth conductor sizes.<br />
Knowledge of earth rod requirements.<br />
Knowledge of earth bore water level.<br />
Knowledge of measurement of earth<br />
bore water level & depth.<br />
Knowledge of earth bore backfilling<br />
material<br />
Knowledge of KM standard requirements<br />
of earth resistance<br />
Knowledge of indoor/outdoor sub station<br />
loop earthing & loop earthing condition.<br />
Issue: 3.0 23-03-2010 Unclassified Page 16 of 18
NO DETAIL DESCRIPTION REMARKS<br />
4.<br />
Sub-station<br />
installation<br />
a) indoor<br />
Knowledge for installation sequence of<br />
indoor switchgear to refer scheme drawing.<br />
Knowledge of indoor substation<br />
measurement before installation of indoor<br />
switchgear.<br />
Knowledge of panel allighments, grouting,<br />
bolting & coupling.<br />
Knowledge of main busbar fitting and torque<br />
tigntness at compartment<br />
Knowledge of provision of shroud on main<br />
busbar<br />
Knowledge of CB's test, service operation<br />
with interlock sequence<br />
YES<br />
NO<br />
Knowledge of panel circuit/busbar earthing<br />
Knowledge to provide lubrication for moving<br />
parts & application of petroleum jelly on main<br />
& earth contact<br />
Knowledge to provide ac supply<br />
connection,dc supply connection, tx-prv<br />
connection,mv panel ref connection<br />
Knowledge of battery charger battery bank<br />
connection & operation of battery charger<br />
Knowledge of sub-station main earth & loop<br />
earth connections to indoor panel<br />
Knowledge of tools & tool rack fixing<br />
Knowledge of sub-station name plate<br />
requirement<br />
Knowledge of sub-station transformer<br />
installation like centering & levelling of<br />
transformer,transformer oil level, earth<br />
connection, tap changer position, prv<br />
connection. etc<br />
Knowledge of free standing/bolt-on feeder<br />
pillar installation like feeder pillar level,<br />
grouting, provision of 30ahrc fuse, cable<br />
connection to s/stn db & earthing connection<br />
Knowledge of indoor sub-station civil work,<br />
floor painting, lighting, shaker plates<br />
requirements, door arrangement of fixing km<br />
sub-station padlock<br />
Issue: 3.0 23-03-2010 Unclassified Page 17 of 18
NO DETAIL DESCRIPTION REMARKS<br />
4) Sub-station<br />
Installation<br />
b) Outdoor<br />
Knowledge of outdoor switchgear<br />
installation sequence to refer scheme<br />
drawing<br />
Knowledge to check plinth condition &<br />
measurement before installation of<br />
outdoor switchgear<br />
Knowledge of RMU/fuse switch/ring<br />
switch allingment, levelling, grouting<br />
YES<br />
NO<br />
Knowledge of 11kv HRC/tlf fuse capacity<br />
Knowledge of outdoor switchgear oil/gas<br />
level.<br />
Knowlegde of procedure for band joint,<br />
end cap sleeving & covers<br />
Knowledge of fixing earth fault indicator,<br />
cbct requirement and auxillary connection<br />
to earth fault indicator<br />
Knowledge of testing earth fault indicator<br />
Knowledge of outdoor switchgear<br />
operation & interlock sequence<br />
Knowledge of outdoor switchgear<br />
greasing & testing mechanism<br />
Knowledge of outdoor switchgear main<br />
earth/loop earth connection<br />
Knowledge of outdoor sub-station<br />
transformer installation like centering &<br />
levelling of transformer,transformer oil<br />
level, earth connection, any leakage, tap<br />
changer position,<br />
Knowledge of free standing/bolt-on<br />
feeder pillar installation like feeder pillar<br />
level, grouting, provision of 30A HRC<br />
fuse, cable connection to efi & earthing<br />
connection<br />
Issue: 3.0 23-03-2010 Unclassified Page 18 of 18