No. Issue Response<br />

11 (Continued) A summary <strong>of</strong> the <strong>project</strong> background noise monitoring is provided in Section 3.1 <strong>of</strong> Appendix D, Volume 2<br />

<strong>of</strong> the EIS which states:<br />

"Background noise surveys to characterise and quantify the acoustical environment in the area<br />

surrounding the Project were conducted in two programmes between 5 August and 4 September<br />

2004. Nine unattended noise loggers were positioned at selected representative dwellings<br />

commencing Thursday 5 and Thursday 19 August 2004, for the first and second campaigns<br />

respectively.<br />

In order to supplement the unattended logger measurements and to assist in identifying the<br />

character and duration <strong>of</strong> background noise sources, operator-attended daytime, evening and<br />

night-time surveys were also conducted at all nine logging locations. The measurement<br />

methodology and analysis procedures are described in Appendix C2. The operator-attended<br />

measurement results are summarised in Table 6.”<br />

Section 3.1 <strong>of</strong> Appendix D, Volume 2 <strong>of</strong> the EIS then presents a comprehensive summary <strong>of</strong> the measured<br />

background data, including:<br />

• Table 6 – Operator-Attended Background Noise Environment August 2004 (dBA re 20 μPA);<br />

• Table 7 – Unattended Background Noise Environment August 2004 (dBA re 20 μPA); and<br />

• Table 8 – Noise Environment for Project Assessment Purposes (dBA re 20 μPA).<br />

The data provided in Table 8 <strong>of</strong> Appendix D, Volume 2 <strong>of</strong> the EIS was then used for assessment purposes.<br />

This data set is considered to be adequate for the purpose <strong>of</strong> the noise assessment.<br />

Background noise levels and weather condition detailed results contained in Appendices C2 and C3 to<br />

C11, Volume 2 <strong>of</strong> the EIS are available upon request. These appendices predominantly comprise raw<br />

data and graphs. As discussed above, Section 3.1 <strong>of</strong> Appendix D, Volume 2 <strong>of</strong> the EIS, presents the<br />

analysis <strong>of</strong> this data. Appendices C2 and C3 to C11 were requested by one community member and were<br />

promptly provided to this person.<br />

Since publication <strong>of</strong> the EIS, meteorological monitoring at the site has continued. This data confirms that<br />

winds generally from an easterly direction are a feature <strong>of</strong> the site. This data also indicates that dwellings<br />

within the Noise Management and Affectation zones presented in Table 46 in Appendix D, Volume 2 <strong>of</strong> the<br />

EIS remain unchanged.<br />

Windrose Data and the Air Quality Assessment<br />

An air quality impact assessment for the Project was conducted by Holmes Air Sciences and is presented<br />

in Appendix E, Volume 2 <strong>of</strong> the EIS.<br />

WIL-03\2\2\ISSUES AND RESPONSES ALL TABLES.DOC Page 17 <strong>of</strong> 119