No. Issue Response<br />
11 (Continued) A summary <strong>of</strong> the <strong>project</strong> background noise monitoring is provided in Section 3.1 <strong>of</strong> Appendix D, Volume 2<br />
<strong>of</strong> the EIS which states:<br />
"Background noise surveys to characterise and quantify the acoustical environment in the area<br />
surrounding the Project were conducted in two programmes between 5 August and 4 September<br />
2004. Nine unattended noise loggers were positioned at selected representative dwellings<br />
commencing Thursday 5 and Thursday 19 August 2004, for the first and second campaigns<br />
respectively.<br />
In order to supplement the unattended logger measurements and to assist in identifying the<br />
character and duration <strong>of</strong> background noise sources, operator-attended daytime, evening and<br />
night-time surveys were also conducted at all nine logging locations. The measurement<br />
methodology and analysis procedures are described in Appendix C2. The operator-attended<br />
measurement results are summarised in Table 6.”<br />
Section 3.1 <strong>of</strong> Appendix D, Volume 2 <strong>of</strong> the EIS then presents a comprehensive summary <strong>of</strong> the measured<br />
background data, including:<br />
• Table 6 – Operator-Attended Background Noise Environment August 2004 (dBA re 20 μPA);<br />
• Table 7 – Unattended Background Noise Environment August 2004 (dBA re 20 μPA); and<br />
• Table 8 – Noise Environment for Project Assessment Purposes (dBA re 20 μPA).<br />
The data provided in Table 8 <strong>of</strong> Appendix D, Volume 2 <strong>of</strong> the EIS was then used for assessment purposes.<br />
This data set is considered to be adequate for the purpose <strong>of</strong> the noise assessment.<br />
Background noise levels and weather condition detailed results contained in Appendices C2 and C3 to<br />
C11, Volume 2 <strong>of</strong> the EIS are available upon request. These appendices predominantly comprise raw<br />
data and graphs. As discussed above, Section 3.1 <strong>of</strong> Appendix D, Volume 2 <strong>of</strong> the EIS, presents the<br />
analysis <strong>of</strong> this data. Appendices C2 and C3 to C11 were requested by one community member and were<br />
promptly provided to this person.<br />
Since publication <strong>of</strong> the EIS, meteorological monitoring at the site has continued. This data confirms that<br />
winds generally from an easterly direction are a feature <strong>of</strong> the site. This data also indicates that dwellings<br />
within the Noise Management and Affectation zones presented in Table 46 in Appendix D, Volume 2 <strong>of</strong> the<br />
EIS remain unchanged.<br />
Windrose Data and the Air Quality Assessment<br />
An air quality impact assessment for the Project was conducted by Holmes Air Sciences and is presented<br />
in Appendix E, Volume 2 <strong>of</strong> the EIS.<br />