12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong>:<br />

A <strong>Michigan</strong> Urban Retrofit Low Impact Stormwater Management System<br />

Discussion of the Project, Results of Post Construction Monitoring and Methods Used<br />

MWEA <strong>Water</strong>shed Seminar – December 8, 2011<br />

1


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Twenty percent of the world’s available<br />

fresh water is in the Great Lakes<br />

• “Don’t go to <strong>Michigan</strong>, that land of ills, the word means ague,<br />

fever, and chills”<br />

• Drainage critical to settlement of <strong>Michigan</strong> – adopted drainage law<br />

in first State Legislative session in 1838<br />

• Elected county official in charge of managing drainage<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong> are in the<br />

headwaters of the Great Lakes<br />

2


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong> are located in <strong>Towar</strong> <strong>Garden</strong>s<br />

neighborhood, an urbanized area near state capital, Lansing<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Towar</strong> <strong>Garden</strong>s neighborhood:<br />

• Approximately 200-acre area<br />

• Over 400 single-family homes & several<br />

multi-family and commercial<br />

developments<br />

• Affordable housing<br />

• Platted originally in 1920s-1940s<br />

• 40% Impervious<br />

3


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Towar</strong> <strong>Garden</strong>s developed over the years with no organized drainage system<br />

for collection or conveyance of stormwater which resulted in widespread and<br />

longstanding flooding<br />

Flooding along Roadways – Roads in Poor Repair & Impassable at Times<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Flooding in Yards<br />

Standing water would remain for days<br />

after 30-minute rainfall or less than<br />

one-year storms resulting in loss of<br />

use of private property and unhealthy<br />

conditions<br />

4


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Flooding of Basements - Sump pumps ran constantly in<br />

many homes & illegal connections to sanitary system<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Why LID for <strong>Towar</strong> <strong>Garden</strong>s?<br />

• Allowed for feasibly overcoming site constraints<br />

– Flat, low-lying topography with poorly-drained soils<br />

– Narrow rights-of-way with multiple utility conflicts<br />

– Rear yards lower than front yards<br />

– Downstream outlet elevation limitations for gravity flow<br />

– Lack of available land for detention w/o removing affordable<br />

housing<br />

• Cost of conventional system was prohibitive for 400 modest homes<br />

($20 million vs. $9.8 million)<br />

• Met NPDES Phase II requirements<br />

5


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

What are the <strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong>?<br />

• 200-acre watershed<br />

• 10-year pipe design; 100-year detention design<br />

• 8.25 miles of drain constructed<br />

– Collection and treatment system: underdrained rain gardens and roadside<br />

ditches (150 rain gardens/5.6 acres)<br />

– Conveyance system: roadway concrete drain pipes (none larger than 24”)<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Overall System<br />

Treatment Train<br />

6


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Roadside <strong>Rain</strong> <strong>Garden</strong>s<br />

• Underdrained infiltration bed with amended soil profile overlay<br />

• Small, most 400 to 4,000 square feet<br />

• 6” topsoil/compost<br />

• 6” sand (geotextile fabric separating aggregate)<br />

• 12” aggregate<br />

• 12” underdrain (perforated dual wall HDPE, nonwrapped)<br />

• Overflow weir<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Rear Yard <strong>Rain</strong> <strong>Garden</strong>s<br />

• Underdrained infiltration bed with amended soil<br />

profile overlay<br />

• Large, most 0.10 to 0.50 acres<br />

• 6” topsoil/compost<br />

6” sand (geotextile fabric separating aggregate)<br />

• 12” aggregate<br />

• 12” underdrain on most (perforated dual wall HDPE,<br />

non-wrapped)<br />

7


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Regional Indigenous<br />

Plants<br />

• Why are they important?<br />

• What is different about<br />

native plants?<br />

• What's wrong with using<br />

hybrids?<br />

• Compromise is sometimes<br />

necessary.<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Planting<br />

Design<br />

Plant Team<br />

• Wetland Scientist<br />

• Soil Scientist<br />

• Arborist<br />

• Botanist<br />

8


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Rain</strong> <strong>Garden</strong> Planting Facts<br />

• 111 pounds of wildflower<br />

seeds (95 species)<br />

• 52,000 perennial forbs (125<br />

species)<br />

• 36,000 cubic yards of compost<br />

• 51,000 cubic yards of topsoil<br />

Note: 1,100 trees & shrubs (52<br />

species)<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Project Constructed March 2006 – December 2007<br />

So what is the difference in <strong>Towar</strong> <strong>Garden</strong>s Post-Construction?<br />

• Before<br />

– Many complaints of flooding of structures, streets and<br />

property reported after minor rainfall.<br />

– Landowner surveys revealed that 64% had drainage problems<br />

and 13.5% had basement flooding<br />

• After<br />

– Put to the Test: No flooding observed, no drainage problems<br />

or flooding reported.<br />

9


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

10


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

11


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

12


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Before<br />

After<br />

13


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Flooding overwhelms the Sanitary Sewer System<br />

• The sanitary sewer was the only<br />

outlet for storm water for many<br />

homes<br />

• 46 direct connections were<br />

eliminated<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Analysis Of Sump Pump And Dehumidifier Operating Costs (Pre & Post Construction)<br />

Based On Records From Two Flood Prone Homes<br />

• Pre-construction: homeowners frequently reported<br />

sump pump use “all the time”<br />

• Post-construction: homeowners frequently report<br />

reduction in sump pump use<br />

• Estimated total annual savings of $350 per home<br />

• Average annual assessment is $255 per home<br />

$500.00<br />

$450.00<br />

$400.00<br />

$350.00<br />

$300.00<br />

$250.00<br />

$200.00<br />

$150.00<br />

$100.00<br />

$50.00<br />

$-<br />

$218 Savings<br />

Total Sump<br />

Pump Annual<br />

Savings<br />

$132 Savings<br />

Total<br />

Dehumidifier<br />

Annual Savings<br />

$350 Savings<br />

Total Annual<br />

Savings<br />

Before Project<br />

After Project<br />

14


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

The Goal of LID<br />

“The goal of Low Impact Development (LID)<br />

is the cornerstone of stormwater<br />

management with the goal of mimicking a<br />

site’s pre-settlement hydrology by using<br />

design techniques that infiltrate, filter,<br />

store, evaporate and detain runoff close to<br />

its source.”<br />

− SEMCOG LID Manual<br />

Christopher Columbus Landing in America<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Purpose of testing<br />

Testing finds answers to specific questions.<br />

Our questions:<br />

• Q1: Was LID goal of mimicking pre-settlement hydrology<br />

accomplished?<br />

• Q2: What TP, TN and TSS loads do rain gardens remove?<br />

15


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Testing balances three elements<br />

How much is enough?<br />

• Knowledge<br />

• Money<br />

• Time<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Why these parameters?<br />

TSS,TP,TN<br />

• Know the watershed<br />

• Know the pollutant sources<br />

• Know the receiving waters<br />

16


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Four levels of monitoring<br />

1. Regular schedule for<br />

inspections<br />

2. Grab sampling and field<br />

measurements<br />

3. Sampling rain events<br />

4. Simulated events<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

1. Observation and Inspection<br />

• Crew on site at least once a week<br />

• Logging observations and work performed daily<br />

17


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

2. Grab Sampling and Field Measurement<br />

• Take Grab samples 1-2 times per<br />

year<br />

• Gather Quanta meter and<br />

turbidity meter readings<br />

• Test infiltration rate of rain<br />

garden<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

3. <strong>Rain</strong> Event<br />

• Actual Performance<br />

• Natural hydrologic cycle<br />

• At mercy of mother nature<br />

• Common storms, lack uncommon and<br />

extreme storms<br />

• Must be always ready to collect and<br />

process samples.<br />

4. Simulated Event<br />

• Idealized<br />

• Impossible to synthesize full hydrologic<br />

cycle in field tests<br />

• Very controlled environment<br />

• Takes more people and resources and is<br />

more stressful<br />

• Able to collect data at very high resolution<br />

18


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

“It Takes Two to Test”<br />

Test comparatively:<br />

• Upstream/Downstream<br />

• LID/No LID<br />

• Treated/Untreated<br />

• Sheet Flow/Stream Flow<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Sampling/Testing Equipment<br />

• Auto Samplers<br />

• Flow Meters<br />

• Depth Meters<br />

• Data Collectors<br />

• Quanta<br />

• Laptop computer<br />

• Survey equipment<br />

• Coolers / Ice<br />

19


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

The Procedures Manual<br />

• Methods to collect, preserve and<br />

transport<br />

• Each Technical Method<br />

• Step by step instruction guide to run<br />

each method<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Example Test Procedures<br />

-- TNT plus Low Range 0.05 - 1.50 mg/L PO 4 -P, Method 10210 (TNT843)<br />

20


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Add 2.0 mL of sample to vial<br />

-- TNTplus Low Range 0.05 - 1.50 mg/L PO 4 -P, Method 10210 (TNT843)<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Insert vial or vials into the DRB200 Reactor<br />

Close cover and heat for 1 hour at 60° C<br />

-- TNTplus Low Range 0.05 - 1.50 mg/L PO 4 -P, Method 10210 (TNT843)<br />

21


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

When the timer expires invert again 2-3<br />

times and then insert into a<br />

Spectrophotometer for readings<br />

Record the readings<br />

-- TNTplus Low Range 0.05 - 1.50 mg/L PO 4 -P, Method 10210 (TNT843)<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

TNT plus methods<br />

• Expedite the analysis<br />

• Process 3-5 times faster<br />

• Contaminate fewer samples<br />

• Minimize glassware<br />

• Reduce human errors<br />

• Tighten QA test results<br />

22


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

What is a Spectrophotometer?<br />

• Very precise device. A “Bionic eye”<br />

• Senses absorption of light frequencies<br />

• Increased pollutant concentration changes the<br />

sample color<br />

• Gives readings as mg/L of pollutant<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Software Used<br />

• Databases<br />

• iPhone®/ iPad® data collection<br />

• GIS Layers<br />

• Calculation spreadsheets<br />

23


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Performance Testing of Flow and <strong>Water</strong> Quality for Natural and Synthetic Events<br />

• Sampled 4 months starting in April 2011<br />

• 20 natural runoff events – three vegetated rain gardens tested<br />

• For synthetic runoff events – same three rain gardens tested, along<br />

with turf rain garden and turf ditch. (Nutrients were added to the<br />

influent water to determine removal efficiency)<br />

• Data collected with ISCO auto-samplers and ISCO flow meters<br />

including the following:<br />

• Flow, Depth, Duration, Volume<br />

• TSS, TP, TN<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

ANALYSIS OF POST CONSTRUCTION RAINFALL BY MONTH<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

tested post construction by<br />

420 rainfall events<br />

• Eighteen of 45 months had<br />

above average rainfall (4<br />

of the 18 were dormant<br />

months)<br />

• Three events were 10-year<br />

or greater (1 of the 3 was<br />

50-year event)<br />

24


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

May 13 th , 2011<br />

One of the Three 10-year or Greater Events<br />

1.4<br />

1.2<br />

1<br />

0.8<br />

0.6<br />

0.4<br />

0.2<br />

0<br />

July 28-29<br />

Event<br />

May 13th<br />

Event<br />

Growing Season Event – May 13th, 2011<br />

1:00:00 AM<br />

4:00:00 AM<br />

7:00:00 AM<br />

10:00:00 AM<br />

1:00:00 PM<br />

4:00:00 PM<br />

7:00:00 PM<br />

10:00:00 PM<br />

12 hours after 2.32”, 4 hour duration rainfall<br />

(10-year event)<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Dormant Season Event<br />

2/27/2009 Growing Season Event<br />

5/28/2009<br />

12 hours after snowmelt and<br />

0.8”, 5 hour duration rainfall (< 2-month event)<br />

18 hours after<br />

3.44”, 5 hour duration rainfall (50-year event)<br />

25


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Typical Depth and Flow Hydrographs (Vegetated <strong>Rain</strong> <strong>Garden</strong> – Natural Events)<br />

General Results of Natural Event Testing<br />

• All rain gardens effectively reduced peak discharge, 81%<br />

average (34% to 100% )<br />

• Eight of the twenty events had 100% volume control<br />

(produced no effluent).<br />

Volume reduction is function of<br />

• antecedent conditions<br />

• site factors<br />

• storm intensity<br />

• elevation of overflow weir<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Water</strong> Quality<br />

TSS Removal Efficiency, 4/21/11 Natural Event in Vegetated <strong>Rain</strong> <strong>Garden</strong><br />

The first flush removal of TSS<br />

averaged 94%, (80 to 100%)<br />

26


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Water</strong> Quality<br />

TP Removal Efficiency, 4/21/11 Natural Event in Vegetated <strong>Rain</strong> <strong>Garden</strong><br />

The first flush removal of TP averaged 71%, (29 to 94%)<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Water</strong> Quality<br />

TN Removal Efficiency 6/15/11 Synthetic Event in Vegetated <strong>Rain</strong> <strong>Garden</strong><br />

The first flush TN removal with synthetic events was as high as 97%. The first<br />

flush TN removal with natural events averaged 27% (15 to 38%)<br />

Nutrient Concentration (mg/L)<br />

50<br />

45<br />

40<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

0<br />

97%<br />

91%<br />

100%<br />

0 10 20 30 40 50 60 70 80<br />

Inf. TN Conc.<br />

Time (minutes)<br />

Eff. TN Conc.<br />

90%<br />

80%<br />

70%<br />

60%<br />

50%<br />

40%<br />

30%<br />

20%<br />

10%<br />

0%<br />

TN Reduction<br />

27


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Performance Conclusions<br />

• Treatment effectiveness is primarily a function of infiltration<br />

– Infiltration capacity and treatment effectiveness highest in<br />

vegetated rain gardens<br />

– Infiltration capacity and treatment effectiveness lower in turf rain<br />

garden<br />

– Infiltration capacity and treatment effectiveness absent in turf<br />

ditch<br />

• Peak flow reduction significant in vegetated rain gardens<br />

• Treatment capacity drops by 50% or more when mulch and<br />

deep-rooted native vegetation replaced with turf grass<br />

• Although not tested, the infiltration data suggest that larger<br />

turf rain gardens (perhaps 2 to 5 times larger) could remove<br />

pollutants as well as vegetated rain gardens<br />

• Turf ditches do little other than convey water<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

General Results of Infiltration and <strong>Water</strong> Quality Testing<br />

(<strong>Rain</strong> <strong>Garden</strong>s were designed to dewater in less than 24 hours. All tests recorded dewatering within 1 hour)<br />

Vegetated <strong>Rain</strong> <strong>Garden</strong><br />

Turf <strong>Rain</strong> <strong>Garden</strong><br />

Turf Ditch<br />

• High infiltration rate<br />

• Treated runoff (Tested TSS,<br />

TP,TN)<br />

• Low infiltration rate<br />

• Bypassed most runoff w/o<br />

treatment (Tested TP, TN)<br />

• No Infiltration<br />

• No treatment (Tested TP, TN)<br />

28


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong> Retrofit<br />

• Eliminates flooding<br />

• Removes pollutants<br />

• Reduces volume / peak discharge<br />

• Lowers cost of drainage<br />

infrastructure<br />

• Increases property values<br />

• Adds aesthetic amenity<br />

• Creates sense of place<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Given the success of <strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong>, why not more retrofits like it?<br />

Challenges of large-scale LISMS<br />

• Neophobia<br />

– Public<br />

– Public officials / Regulatory agencies<br />

– Engineers<br />

• “In your face” infrastructure<br />

– Interaction between public and infrastructure<br />

– Aesthetics<br />

• Complexity of design and execution<br />

– Relative newness and lack design guidance<br />

– Knowledgeable professionals<br />

29


12/14/2011<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

<strong>Rain</strong> <strong>Garden</strong>s require maintenance!!<br />

• Performance is so good<br />

because of the hands on<br />

routine maintenance<br />

program<br />

P a t r i c k E . L i n d e m a n n<br />

INGHAM COUNTY DRAIN COMMISSIONER<br />

<strong>Towar</strong> <strong>Rain</strong> <strong>Garden</strong> <strong>Drains</strong><br />

A Low-Impact Urban Retrofit<br />

Questions and Answers<br />

30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!