Track Record 5, October to December 2000 - Public Transport Victoria
Track Record 5, October to December 2000 - Public Transport Victoria
Track Record 5, October to December 2000 - Public Transport Victoria
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Track</strong> <strong>Record</strong><br />
Vic<strong>to</strong>ria’s Train, Tram and Bus Services<br />
Figure 1. On-time performance for trains<br />
100.0<br />
Bayside Trains<br />
Percentage of trains running on time<br />
90.0<br />
80.0<br />
70.0<br />
60.0<br />
Connex Trains<br />
V/Line Passenger<br />
50.0<br />
Oct.-<br />
Dec. 1999<br />
Jan.-<br />
Mar. <strong>2000</strong><br />
Apr.-<br />
Jun. <strong>2000</strong><br />
Jul.-<br />
Sept. <strong>2000</strong><br />
Oct.-<br />
Dec. <strong>2000</strong><br />
Figure 2. On-time performance for trams<br />
100.0<br />
Swans<strong>to</strong>n Trams<br />
Percentage of trams running on time<br />
90.0<br />
80.0<br />
70.0<br />
60.0<br />
Yarra Trams<br />
50.0<br />
Oct.-<br />
Dec. 1999<br />
Jan.-<br />
Mar. <strong>2000</strong><br />
Apr.-<br />
Jun. <strong>2000</strong><br />
Jul.-<br />
Sept. <strong>2000</strong><br />
Oct.-<br />
Dec. <strong>2000</strong><br />
Figure 3. On-time performance for buses<br />
100.0<br />
Metro buses<br />
Percentage of buses running on time<br />
90.0<br />
80.0<br />
70.0<br />
60.0<br />
50.0<br />
Oct.-<br />
Dec. 1999<br />
Jan.-<br />
Mar. <strong>2000</strong><br />
Apr.-<br />
Jun. <strong>2000</strong><br />
Jul.-<br />
Sept. <strong>2000</strong><br />
Oct.-<br />
Dec. <strong>2000</strong><br />
Bayside Trains was the only opera<strong>to</strong>r <strong>to</strong> achieve an improvement in punctuality for the <strong>December</strong> quarter <strong>2000</strong>, with a<br />
punctuality level of 96.5 per cent compared with 96.1 per cent for the September quarter <strong>2000</strong>. Levels of punctuality for<br />
metropolitan buses, Connex Trains and the tram opera<strong>to</strong>rs fell in the <strong>December</strong> quarter <strong>2000</strong> by comparison with the<br />
September quarter <strong>2000</strong>.<br />
All train and tram opera<strong>to</strong>rs showed lower levels of punctuality in the <strong>December</strong> quarter <strong>2000</strong> by comparison with the<br />
same period in 1999.<br />
4