13.04.2014 Views

Track Record 5, October to December 2000 - Public Transport Victoria

Track Record 5, October to December 2000 - Public Transport Victoria

Track Record 5, October to December 2000 - Public Transport Victoria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Track</strong> <strong>Record</strong><br />

Vic<strong>to</strong>ria’s Train, Tram and Bus Services<br />

Figure 1. On-time performance for trains<br />

100.0<br />

Bayside Trains<br />

Percentage of trains running on time<br />

90.0<br />

80.0<br />

70.0<br />

60.0<br />

Connex Trains<br />

V/Line Passenger<br />

50.0<br />

Oct.-<br />

Dec. 1999<br />

Jan.-<br />

Mar. <strong>2000</strong><br />

Apr.-<br />

Jun. <strong>2000</strong><br />

Jul.-<br />

Sept. <strong>2000</strong><br />

Oct.-<br />

Dec. <strong>2000</strong><br />

Figure 2. On-time performance for trams<br />

100.0<br />

Swans<strong>to</strong>n Trams<br />

Percentage of trams running on time<br />

90.0<br />

80.0<br />

70.0<br />

60.0<br />

Yarra Trams<br />

50.0<br />

Oct.-<br />

Dec. 1999<br />

Jan.-<br />

Mar. <strong>2000</strong><br />

Apr.-<br />

Jun. <strong>2000</strong><br />

Jul.-<br />

Sept. <strong>2000</strong><br />

Oct.-<br />

Dec. <strong>2000</strong><br />

Figure 3. On-time performance for buses<br />

100.0<br />

Metro buses<br />

Percentage of buses running on time<br />

90.0<br />

80.0<br />

70.0<br />

60.0<br />

50.0<br />

Oct.-<br />

Dec. 1999<br />

Jan.-<br />

Mar. <strong>2000</strong><br />

Apr.-<br />

Jun. <strong>2000</strong><br />

Jul.-<br />

Sept. <strong>2000</strong><br />

Oct.-<br />

Dec. <strong>2000</strong><br />

Bayside Trains was the only opera<strong>to</strong>r <strong>to</strong> achieve an improvement in punctuality for the <strong>December</strong> quarter <strong>2000</strong>, with a<br />

punctuality level of 96.5 per cent compared with 96.1 per cent for the September quarter <strong>2000</strong>. Levels of punctuality for<br />

metropolitan buses, Connex Trains and the tram opera<strong>to</strong>rs fell in the <strong>December</strong> quarter <strong>2000</strong> by comparison with the<br />

September quarter <strong>2000</strong>.<br />

All train and tram opera<strong>to</strong>rs showed lower levels of punctuality in the <strong>December</strong> quarter <strong>2000</strong> by comparison with the<br />

same period in 1999.<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!