Track Record 5, October to December 2000 - Public Transport Victoria
Track Record 5, October to December 2000 - Public Transport Victoria
Track Record 5, October to December 2000 - Public Transport Victoria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Track</strong> <strong>Record</strong><br />
Vic<strong>to</strong>ria’s Train, Tram and Bus Services<br />
Figure 5. Cancellation of trams<br />
Percentage of tram services cancelled<br />
2.0<br />
1.5<br />
1.0<br />
0.5<br />
Swans<strong>to</strong>n Trams<br />
Yarra Trams<br />
0.0<br />
Oct.-<br />
Dec. 1999<br />
Jan.-<br />
Mar. <strong>2000</strong><br />
Apr.-<br />
Jun. <strong>2000</strong><br />
Jul.-<br />
Sept. <strong>2000</strong><br />
Oct.-<br />
Dec. <strong>2000</strong><br />
Figure 6. Cancellation of buses<br />
2.0<br />
Metro buses<br />
Percentage of bus services cancelled<br />
1.5<br />
1.0<br />
0.5<br />
0.0<br />
Oct.-<br />
Dec. 1999<br />
Jan.-<br />
Mar. <strong>2000</strong><br />
Apr.-<br />
Jun. <strong>2000</strong><br />
Jul.-<br />
Sept. <strong>2000</strong><br />
Oct.-<br />
Dec. <strong>2000</strong><br />
The level of cancellations for Bayside Trains showed improvement for the second consecutive quarter, while the<br />
cancellation rate for Connex Trains increased slightly. Cancellation rates for the tram opera<strong>to</strong>rs improved marginally in the<br />
<strong>December</strong> quarter <strong>2000</strong> by comparison with the September quarter <strong>2000</strong>. Metropolitan bus service cancellations remained<br />
at the low level of 0.1 per cent.<br />
Cancellations of V/Line Passenger train rose significantly in the <strong>December</strong> quarter <strong>2000</strong>, increasing <strong>to</strong> 0.8 per cent from 0.1<br />
per cent in the September quarter <strong>2000</strong>. The rate of V/Line Passenger train cancellations for the <strong>December</strong> quarter <strong>2000</strong><br />
was affected by industrial action in November <strong>2000</strong>. It should be noted that the reported figure of 0.8 per cent has been<br />
adjusted for the Corio overpass collapse by removing cancelled services in <strong>Oc<strong>to</strong>ber</strong> for which a replacement bus service<br />
was provided. As explained in footnote 4 <strong>to</strong> Table 2, the cancellation rate for V/Line Passenger train for the <strong>December</strong><br />
quarter <strong>2000</strong>, with the cancelled services affected by the Corio incident included, rises <strong>to</strong> 3.0 per cent.<br />
Bayside Trains, Connex Trains and Swans<strong>to</strong>n Trams all showed a higher level of cancellations during the <strong>December</strong> quarter<br />
<strong>2000</strong> by comparison with the <strong>December</strong> quarter 1999. Yarra Trams showed a marginal improvement over the same period.<br />
6