- Page 1 and 2: GOVERNMENT OF INDIA OUTCOME BUDGET
- Page 3 and 4: 4.7 Schemes under National Water De
- Page 5 and 6: EXECUTIVE SUMMARY A system of perfo
- Page 7 and 8: Chapter Aspect(s) covered 2006-07 7
- Page 9 and 10: CHAPTER I BRIEF INTRODUCTORY NOTE O
- Page 11 and 12: certain projects on the Narmada, in
- Page 13 and 14: CENTRAL WATER AND POWER RESEARCH ST
- Page 15 and 16: in Madhya Pradesh. In addition to t
- Page 17 and 18: WATER RESOURCES DEVELOPMENT: PLANNI
- Page 19 and 20: • To make recommendations on the
- Page 21 and 22: • Private sector participation sh
- Page 23 and 24: Himachal Pradesh, Goa, Pondicherry
- Page 25 and 26: (C) Bilateral Assistance-Germany 10
- Page 27 and 28: The Treaty is valid for a period of
- Page 29 and 30: Standing Committee on Inundation Pr
- Page 31 and 32: India-Bangladesh co-operation 1.60
- Page 33 and 34: Sector X Plan Outlay (1) (2) Secret
- Page 35 and 36: 4 Ground Water Management and Regul
- Page 37 and 38: 1 0 1 1 1 2 1 3 Dam Safety Studies
- Page 39 and 40: CHAPTER-III Reform measures and pol
- Page 41 and 42: 4.1.4 A project launch workshop was
- Page 43 and 44: • One regional workshop for discu
- Page 45 and 46: have rapid access to information ab
- Page 47: upgraded at regular intervals to ke
- Page 51 and 52: 4.4.6 The DPR for the Kirthai H.E.
- Page 53 and 54: XI Plan, this scheme is proposed to
- Page 55 and 56: 4.4.25 Command areas of several irr
- Page 57 and 58: Upgradation of Facilities and Skill
- Page 59 and 60: Name of Scheme/ Activity 4. Hydrolo
- Page 61 and 62: Name of Scheme/ Activity Scope and
- Page 63 and 64: Name of Scheme/ Activity Scope and
- Page 65 and 66: Name of Scheme/ Activity Scope and
- Page 67 and 68: e. Training Programmes for In servi
- Page 69 and 70: S.No . Name of Scheme Objective/Out
- Page 71 and 72: 4.6. Central Water And Power Resear
- Page 73 and 74: 4.6.12 With an allocation of Rs.0.2
- Page 75 and 76: (C) Dissemination of Technical Know
- Page 77 and 78: 4.7 National Water Development Agen
- Page 79 and 80: 4.8 National Institute of Hydrology
- Page 81 and 82: 3. Training Course on Watershed Man
- Page 83 and 84: Hydrology Project 5. Participation
- Page 85 and 86: MINOR IRRIGATION 4.10 Rationalizati
- Page 87 and 88: 4.11. Central Ground Water Board(CG
- Page 89 and 90: programme in ground water sector an
- Page 91 and 92: Sl. No. Sector/ Scheme/ Organizati
- Page 93 and 94: Sl. No. Sector/ Scheme/ Organizati
- Page 95 and 96: Sl. No. Sector/ Scheme/ Organizati
- Page 97 and 98: Sl. No. Sector/ Scheme/ Organizati
- Page 99 and 100:
Sl. No. Sector/ Scheme/ Organizati
- Page 101 and 102:
with a minimum 10% beneficiary cont
- Page 103 and 104:
Flood Bulletins are some of the sig
- Page 105 and 106:
S.No. Name of Scheme/ Activity Sche
- Page 107 and 108:
S.No. Name of Scheme/ Activity Unit
- Page 109 and 110:
4.14 Brahmaputra Board(BB): 4.14.1
- Page 111 and 112:
Scheme Scope & Objective of the Sch
- Page 113 and 114:
Scheme Scope & Objective of the Sch
- Page 115 and 116:
Pradesh and the Tamluk drainage sch
- Page 117 and 118:
Sl. No. Name of Scheme Name of Stat
- Page 119 and 120:
TRANSPORT SECTOR 4.16 Farraka Barra
- Page 121 and 122:
Sl. No. Name of Scheme REVIEW OF PE
- Page 123 and 124:
(iii) (iv) Removing distinction of
- Page 125 and 126:
een transferred to the states secto
- Page 127 and 128:
CHAPTER - V OVERALL FINANCE REVIEW
- Page 129 and 130:
(ii) (iii) (iv) (v) Short fall of R
- Page 131 and 132:
Name of the scheme BE 2006-07 RE 20
- Page 133 and 134:
Project Maintenance of flood protec
- Page 135 and 136:
and procedures and in particularly
- Page 137 and 138:
evamping of CADWM for XI Plan is un
- Page 139 and 140:
15 Infrastructure Development M&M,
- Page 141 and 142:
Sl Sector/Organisation/Scheme Actua
- Page 143 and 144:
TABLE - C BUDGET AT A GLANCE (TYPE
- Page 145 and 146:
Sl. Sector/Organisation/Scheme Actu
- Page 147 and 148:
Brahmaputra Board 109.00 0.00 Brahm
- Page 149 and 150:
CHAPTER VI REVIEW OF PERFORMANCE OF
- Page 151 and 152:
6.1.9 Out of 34 nos. of identified
- Page 153 and 154:
Further, Brahmaputra Board proposed
- Page 155 and 156:
FINANCIAL OUTLAYS (Rs. in Crore) Sl
- Page 157 and 158:
6.4.2 The Board consists of a Chair
- Page 159 and 160:
inter-state river Cauvery and the r
- Page 161 and 162:
AUTONOMOUS BODIES (SOCIETIES): 6.8
- Page 163 and 164:
iv) To carry out activities that th
- Page 165 and 166:
Technology. WAPCOS has also been ve
- Page 167 and 168:
Guwahati, Imphal, Silchar, Shillong
- Page 169 and 170:
ANNEXURE-G STATEMENT SHOWING DETAIL
- Page 171 and 172:
`(1) `(2) (3) `(4) `(5) `(6) `(7) `