INTEGRATED WATER<br />

RESOURCE MANAGEMENT II<br />

QUARTERLY REPORT<br />

YEAR 1: 3 RD QUARTER<br />

(JULY - SEPTEMBER 2009)<br />

REPORT NO. <strong>10</strong><br />

October 2009<br />

This report is made possible by the support of the American People through the United States Agency for<br />

International Development (USAID). It was prepared by International Resources Group (IRG).<br />

TITLE 1


INTEGRATED WATER<br />

RESOURCE MANAGEMENT II<br />

QUARTERLY REPORT<br />

YEAR 1: 3 RD QUARTER<br />

(JULY– SEPTEMBER 2009)<br />

REPORT NO. <strong>10</strong><br />

Contract No. EPP-I-00-04-00024-00 Task Order No. 06<br />

October 2009<br />

International Resources Group<br />

1211 Connecticut Avenue, NW, Suite 700<br />

Washington, DC 20036<br />

202-289-0<strong>10</strong>0 Fax 202-289-7601<br />

www.irgltd.com<br />

DISCLAIMER<br />

The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for<br />

International Development or the United States Government.


TABLE OF CONTENTS<br />

TABLE OF CONTENTS ··································································································· i<br />

ACRONYMS ··················································································································· ii<br />

1. SUMMARY ··········································································································· 1<br />

2. ACCOMPLISHMENTS DURING THE REPORT PERIOD ··································· 3<br />

3. ACTIVITIES PLANNED FOR NEXT QUARTER ················································ 12<br />

4. PROBLEMS AND ISSUES ················································································ 16<br />

5. STAFF LEVEL OF EFFORT ·············································································· 18<br />

6. STATUS OF FINANCES AND EXPENDITURES ·············································· 19<br />

7. LIST OF REPORTS ··························································································· 21<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)<br />

i


ACRONYMS<br />

AUC American University Cairo<br />

APRP Agricultural Policy Reform Program<br />

ARC Ministry of Agriculture and Land Reclamation Agriculture Research Center<br />

BCWUA Branch Canal Water User Association<br />

CTO Cognizant Technical Officer<br />

DWAT District Water Advisory Team<br />

EEAA Egyptian Environmental Affairs Agency<br />

EIA Environmental Impact Assessment<br />

EPADP Egyptian Public Authority for Drainage Projects<br />

EPIQ Environmental Policy and Institutional Governance (Indefinite Quantity Contract)<br />

GDA Global Development Alliance<br />

GOE Government of Egypt<br />

GPS–GIS Global Positioning System–Geographic Information System<br />

GTZ Gesellschaft für Technische Zusammenarbeit (the German International<br />

Development Agency)<br />

HCWW The Holding Company for Water and Wastewater<br />

IAS Irrigation Advisory Service<br />

IIIMP Integrated Irrigation Improvement and Management Project<br />

IIP Irrigation Improvement Project<br />

IQC Indefinite Quantity Contract<br />

IRG International Resource Group<br />

IRU Institutional Reform Unit of MWRI<br />

IWMD Integrated Water Management District<br />

IWMU Integrated Water Management Unit<br />

IWRM I USAID/Egypt funded LIFE Integrated Water Resource Management Project<br />

(2004-2008)<br />

IWRM II USAID/Egypt funded Integrated Water Resources Management II (2009-2012)<br />

JICA Japan International Cooperation Agency<br />

LIFE Livelihoods and Income from the Environment<br />

LOE Level of Effort<br />

LOP Life of Project<br />

M&E Monitoring and Evaluation<br />

MALR Ministry of Agriculture and Land Reclamation<br />

MISD Matching Irrigation Supply and Demand Program<br />

MOH Ministry of Housing<br />

MSEA Ministry of State for Environmental Affairs<br />

MWRI Ministry of Water Resources and Irrigation<br />

O&M Operation And Maintenance<br />

OJT On-the-job training<br />

PMP Performance Monitoring Plan<br />

PPP Private–public partnership<br />

PSD Office of Productive Sector Development<br />

RDNQ Renewal And Rehabilitation Of North Qena Drains<br />

RFTOP Request for Task Order Proposal<br />

RWMO Regional Water Management Organization<br />

SWERI Soil, Water and Environment Research Institute<br />

TA Technical Assistance<br />

TNA Training Needs Assessment<br />

US United States<br />

USAID United States Agency for International Development<br />

WADA Water & Development Alliance<br />

WCU Water Communication Unit<br />

WQU Water Quality Unit<br />

WUA Water User Associations<br />

ii <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


1. SUMMARY<br />

International Resource Group (IRG) under the USAID/Egypt Integrated Water Resources<br />

Management II Project (IWRM II), Contract No. EPP-I-00-04-00024-00 Task Order No. 06 is<br />

responsible for assisting the Government of Egypt (GOE) to promote integrated water resources<br />

management. The period of performance of the project is from January 25, 2009 to September 30,<br />

2012.<br />

The purpose of this report is to present the status and performance of IWRM II for Year 1 3 rd<br />

Quarter covering the period from July to September 2009. The quarterly report has the following<br />

content: summary of project activities, accomplishments for this quarter, planned activities for the<br />

following quarter, problems and issues, staff level of effort, status of finance and expenditures, and<br />

list of reports.<br />

A summary of the activities for the quarter follows:<br />

Steering Committee Meeting was held on 6 July. Year 1 Work Plan was approved.<br />

Mansoura Regional Office has been established. The office is under renovation. Eng. El Sayed Nagi<br />

was assigned as Mansoura regional advisor. The head of the IWMU was asked to assign an IWMU<br />

engineer in Mansoura to work with the IRG Mansoura regional advisor.<br />

Implementation Letter between USAID and MWRI to support IWMU was approved.<br />

COP Dr. Jeffrey Fredericks departed on medical leave and was replaced by Mr. Andrew Tczap from<br />

IRGs home office.<br />

Biweekly meetings were held with CTO (Eng. Wafaa Faltaous).<br />

Assignments by expat short term specialists during the reporting period included: Andy Tczap,<br />

IRG Senior Manager/Water IQC Project Director IRG Principal & IWRM II Home Office Project<br />

Manager, to replace COP during extended medical absence from project (7 August to 13 October); Firras<br />

Traish, HO Procurement & Financial Specialist, to review and modify procurement, financial, and<br />

administrative procedures (6 July -20 July); Ms. Joan Ablett, Communication Specialist, IRG Home<br />

Office Communications Director, to review and assist with Public Awareness & Communication<br />

Activities, finalize Communications Plan & prepare Qtr 3 Implementation plan (3- <strong>10</strong> July); and Dr.<br />

Mark Svendsen, M&E specialist, to make presentation to USAID on the Performance Monitoring<br />

Plan (7-<strong>10</strong> July).<br />

Under Task 1.1: Formation and Development of BCWUAs “Water User’s Staff Orientation”<br />

training course covering all 8 general directorates and 45 districts was conducted. Water advisory<br />

teams (WAT) are being established in all the 45 IWMDs and coordinators assigned at each<br />

Directorate.<br />

For Task 1.2: Sustainable Local Financing for Canal and Drain Maintenance MWRI has<br />

decided to reorganize Law 12 and prepare a separate law on Stakeholder Participation. MWRI with<br />

IWMU assistance prepared a draft of the law and sent it to the Minister’s office for review and<br />

approval.<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 1


Under Task 1.3: Improvements in Water Productivity and Efficiency a revised implementation<br />

plan was prepared. A pilot demonstration BCWUAs was identified in W. Sharkiya.<br />

For Task 1.4: Wastewater Reuse communications with potential investors was started. Support<br />

studies to the feasibility report on “MWRI Perspective on Wastewater Reuse for Irrigation”,<br />

“Technical Feasibility on Returning Treated Wastewater to the Drainage System in Egypt”, “Artificial<br />

Recharge of Groundwater, a Means for the Reuse of Treated Sewage Effluent”, and “Feasibility of<br />

Reuse of Treated Wastewater for Agriculture” are under preparation.<br />

Under the Global Development Alliance of Environmental Services for Improving Water<br />

Quality Management in Rural Areas retesting of El Toud Waste Water Treatment Facility<br />

(WWTF) was carried out in July as requested by the General Secretary of Luxor High Council.<br />

Water samples collected during the testing by Ministry of Health Cairo showed effluent from the<br />

WWTF met Law 48 standards. 16 persons from El Toud Community including 5 persons from<br />

Luxor Water and Wastewater Company were trained on O&M of the WWTF.<br />

Under Task 2.1: Regional Water Management Organizations meetings were held with MWRI<br />

Institutional Reform Unit regarding the different alternatives for establishing the RWMOs. A<br />

workshop is being planned for November to present options to HE Minister MWRI.<br />

For Task 2.2: Formation and Development of Integrated Water Management Districts the<br />

decrees assigning District Managers, head of sections, and defining boundaries to the 45 IWMDs in<br />

East Delta were signed. Staffing lists for general directorates, IWMD sections and water advisory<br />

teams have been prepared. Undersecretary decrees are being issued in all directorates & districts.<br />

Directorate monthly meetings were held. “Directorates and Districts Orientation Workshop” and<br />

“Basic Computer Skills” training was completed. Guidelines for preparing district business plans<br />

were prepared.<br />

Under Task 2.3: Establishment of Information Management Systems for Sustainable Water<br />

Resources Management water monitoring and distribution staff have been assigned in all general<br />

directorates and IWMDs. Procurement for computer equipment and peripherals, office equipment,<br />

training equipment, mapping equipment, water flow monitoring equipment, and water quality<br />

equipment continued. Training on the “Flow Monitoring” was completed. The inflow and outflow<br />

sites were defined for the 8 directorates & 45 IWMDs.<br />

For Task 2.4: Capacity Building of MWRI Personnel report on “MWRI Training needs<br />

Assessment” was submitted to USAID. 18 candidates have been identified for MS degree programs,<br />

<strong>10</strong> for American University at Cairo (AUC) and 8 for local universities. One person was accepted for<br />

the AUC MBA program. Two persons were accepted for the AUC environmental engineering<br />

program subject to completion of the AUC English Language training course. Seven AUC<br />

candidates are attending remedial English language training with Amid East and will take the TOEFL<br />

exam in November. Arrangements have been started to send MWRI staff on a study tour to Turkey.<br />

For Monitoring and Evaluation the Performance Monitoring Plan was submitted to USAID.<br />

For Public Awareness search continued for local communication specialist.<br />

For Procurement local and US procurement in accordance with the procurement plan continued.<br />

Under Training “Water Users’ Staff Orientation”, “Basic Computer Skills”, and “Flow Monitoring<br />

Orientation” training was completed. Over 500 trainees (37 % female) participated.<br />

2 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


2. ACCOMPLISHMENTS DURING<br />

THE REPORT PERIOD<br />

TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />

CANAL WATER USER ASSOCIATIONS<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the IRG coordinator<br />

for this task. Dr. Moamen El Sharkawy (IWMU) is IWMU Task Manager. Eng. Amira Abdel Hady<br />

(IWMU) is providing technical assistance. Dr. Stan Peabody (IRG), Sociologist, is providing<br />

expatriate STTA support. Eng. Essam Barakat (local consultant) provided support during the<br />

quarter. Activities carried out during the report period:<br />

• The “Water User’s Staff Orientation” training course was conducted in August. It covered<br />

the 8 general directorates and 45 districts. The training course was attended by the Irrigation<br />

and Drainage undersecretaries & general directors, district managers, and district head of<br />

sections.<br />

• The process of establishing water advisory teams (WAT) in all the 45 IWMDs and assigning<br />

coordinators at each Directorate is on-going. Decrees are being issued and the establishment<br />

of WATs should be completed for all Districts by end of October 2009.<br />

• Head of Irrigation Department has strongly encouraged IWRM II to get started with the<br />

BCWUA establishment program. The training schedule was revised to initiate these activities<br />

in October.<br />

• The draft IWRM I BCWUA Assessment report is being finalized. Over 80% (499) BCWUA<br />

chairman and all 27 IWMD District Managers responded to the assessment questionnaire.<br />

Task 1.1 PMP Indicators and Targets<br />

Target Actual<br />

Task Indicator Units Baseline (Yr 1) (Qtr 3)<br />

1.1 Formation and Development of Branch Canal Water User Associations<br />

1.1.a Number of IWMDs with staffed Water<br />

Advisory Teams<br />

Number 0 45 19<br />

1.1.b Number of GDs with staffed Water Advisory<br />

Teams<br />

Number 0 8 4<br />

1.1.c Share of planned BCWUAs established by<br />

Ministerial decree<br />

Percent 0 50 0<br />

1.1.d Share of BCWUAs with maintenance<br />

priorities and action plans<br />

Percent 0 0 0<br />

1.1.e Share of BCWUAs monitoring and reporting<br />

on Branch Canal water supply<br />

Percent 0 0 0<br />

TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />

DRAIN MAINTENANCE<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the IRG coordinator<br />

for this task. Dr. Moamen El Sharkawy (IWMU) is IWMU Task Manager. Eng. Amira Abdel Hady<br />

(IWMU) is providing technical assistance. Dr. Stan Peabody (IRG), Sociologist, is providing<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 3


expatriate STTA support. Dr. Ahmed Abdel Wanis, legal advisor, provided local STTA support.<br />

Activities carried out during the report period:<br />

• MWRI with IWMU assistance prepared a separate law on Stakeholder Participation and sent<br />

it to the Minister’s office for review and approval. The Minister approved the law on 18<br />

September and forwarded it on for Cabinet action.<br />

Target<br />

(Yr 1)<br />

Actual<br />

(Qtr 3)<br />

Task Indicator Units Baseline<br />

1.2 Sustainable Local Financing for Canal and Drain Maintenance<br />

1.2.a Decree prepared and submitted for approval 1/0 0 1 1<br />

1.2.b BCWUA cost sharing system guidelines<br />

1.2.c<br />

Task 1.2 PMP Indicators and Targets<br />

submitted for approval<br />

Cost sharing system guidelines implemented<br />

on Branch Canals<br />

1/0 0 1 0<br />

Number 0 0 0<br />

TASK 1.3: IMPROVEMENTS IN WATER PRODUCTIVITY AND<br />

EFFICIENCY<br />

Dr. Wadie Fahim Mankarious (Senior Organization/Institutional Development Specialist) is<br />

coordinator for this task. He is supported by Dr. Morsy Fawzi, Agricultural Economist; Dr. Ibrahim<br />

Siddik, Agricultural Economist and Rural Development Specialist; Dr. Ahmed Behiry, Agricultural<br />

Engineer and Farm Systems Development Specialist; and Dr. Walid Sallam, Agricultural Economist.<br />

Activities carried out during the report period:<br />

• A meeting was held with Horticultural Export Improvement Association (HEIA) on July 2 nd .<br />

USAID participated.<br />

• The CTO had a meeting with Dr. Beltagy, MALR Advisor and USAID requested from Dr.<br />

Beltagy the support of MALR to Task 1-3. IWRM II was informed that MALR will<br />

nominate some one to be the link with the project.<br />

• Work on a revised implementation plan was initiated. Dr. Ibrahim Siddik prepared a draft<br />

“Implementation Plan for Potential Collaboration between MALR and MWRI on<br />

Rationalizing Water Consumption”. Dr. Walid Sallam prepared a draft “Implementation Plan<br />

to Assist Farmers to Shift to High-value, Lower Water Consuming Crops”. Dr. Ahmed<br />

Behiry was assigned to prepare an “Implementation Plan to Introduce to Farmers Applicable<br />

Water Saving Technologies through BCWUAs”.<br />

• Dr. Ibrahim Siddik had individual meetings with Eng. Hassan Saleh – under secretary for<br />

agricultural extension, Prof. Mohamed El Garhy – Deputy Director of the Agricultural<br />

Research Center for Extension Affairs, and Prof. Adel El Beltagy –President of the<br />

Agricultural Research and Development Council to facilitate the field work with the Ag.<br />

Extension office in West Sharkiya.<br />

• Manshar BCWUA West Sharkiya was identified as a pilot area.<br />

• Task 1-3 Team (Dr. Wadie, Dr. Ibrahim, Dr. Walid and Dr. Behiry) had several meetings<br />

with Abu Kebeer IWMD District Manager, the Chairperson of the Manshar BCWUA and<br />

more than thirty farmers of the Manshar BCWUA. Farmers expressed their willingness to<br />

participate. Four farmers designated a total of 16 feddans to be used as demo sites for<br />

implementation.<br />

• Trainers were identified for providing training and OJT to farmers on growing vegetables,<br />

herbs and spices during the implementation of the activities in the selected pilot area.<br />

4 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


Task 1.3 PMP Indicators and Targets<br />

Target Actual<br />

Task Indicator Units Baseline (Yr 1) (Qtr 3)<br />

1.3<br />

1.3.a<br />

Improvements in Water Productivity and Efficiency<br />

Number of farmers receiving training on<br />

High-Value, Lower Water-Consuming<br />

Crops & water saving technology<br />

Number 0 <strong>10</strong>0 0<br />

TASK 1.4: WASTEWATER REUSE<br />

Dr. Wadie Fahim Mankarious (Senior Organization/Institutional Development Specialist) is<br />

coordinator for this task. Dr. Bahaa Saad, Senior Advisor MWRI; Dr. Fatma Abd El Rahman,<br />

Groundwater Specialist and Senior Advisor MWRI; Dr. Ziad El Menshawi, Agricultural Specialist<br />

and HCWW Advisor, provided short term technical assistance. Activities carried out during the<br />

report period:<br />

Waste Water Reuse:<br />

• Comments from HCWW and US Forest Service received on the report of the “Study of the<br />

Economic Feasibility of Alternative Crops with Potential for the Reuse of Treated<br />

Wastewater in Egypt” prepared by Dr. Swanberg.<br />

• The strategy for implementing Task 1-4 was discussed with the CTO on July 27. It was<br />

suggested to involve the Prime Minister’s office to help resolve investors’ issues.<br />

• Communications with potential investors was started. The COP and the Task Manager had<br />

a meeting with Cane Fiber Technologies on August 11.<br />

• Dr. Bahaa Saad completed a preliminary draft of a report on “MWRI Perspective on<br />

Wastewater Reuse for Irrigation” and “Technical Feasibility on Returning Treated<br />

Wastewater to the Drainage System in Egypt”.<br />

• Dr. Fatma Abd El Rahman prepared a draft report on “Artificial Recharge of Groundwater,<br />

a Means for the Reuse of Treated Sewage Effluent”<br />

• Dr. Ziad El Menshawi began preparation of a report on “Feasibility of Reuse of Treated<br />

Wastewater for Agriculture”.<br />

• A local consultant was identified to prepare a report on the steps required by potential<br />

investors for investment in use of treated waste water for commercial agriculture.<br />

• The COP and the Task Manager had a discussion with Mr. Jim Dempsey, Micro Enterprise<br />

Specialist, on a possible assignment for input to the Feasibility Study. A draft SOW was<br />

given to Mr. Jim Dempsey for review.<br />

Global Development Alliance (GDA)<br />

• Retesting of El Toud WWTF was carried out from July 13 to 15 as requested by the General<br />

Secretary of Luxor High Council. Water samples from the effluent of the facility were<br />

collected by Luxor Ministry of Health, Ministry of Health Cairo, and MWRI Water Quality<br />

Unit & Central Laboratory. Results from the MOH Cairo Lab and MWRI Central Lab<br />

showed effluent from the WWTF met Law 48 standards.<br />

• Results of the analysis of the water samples collected by Luxor Health Office during<br />

retesting of El Toud WWTF were not released. MWRI sent a letter to Head of Luxor<br />

Health Office and with a copy to the Luxor Governor requesting the release of the results.<br />

• The project sponsored a two week O&M training program for 11 persons from the El Toud<br />

community. Five trainees from Luxor Water & Wastewater Company also attended the<br />

training. The trainees were tested by the representative engineer from Luxor Water and<br />

Wastewater Company and Luxor IWMD District Manager.<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 5


Task 1.4 PMP Indicators and Targets<br />

Target<br />

(Yr 1)<br />

Actual<br />

(Qtr 3)<br />

Task Indicator Units Baseline<br />

1.4 Wastwater Reuse<br />

1.4.a Feasibility plan submitted for approval 1/0 0 1 0<br />

1.4.b Number of partnership agreements signed Number 0 0 0<br />

TASK 2.1: REGIONAL WATER MANAGEMENT<br />

ORGANIZATIONS (RWMO)<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator for this<br />

task. Eng. Mohamed Hamed (IWMU) is IWMU Task Manager. They are supported by Dr. Jeffrey<br />

Fredericks (COP). Activities carried out during the report period:<br />

• Several meetings were held with Dr. Joachim Lehmann, GTZ – German Technical<br />

Cooperation Program Director, to discuss the GTZ activities and MWRI Institutional<br />

Reform Unit (IRU) progress on RWMO.<br />

• Meetings were held with IWMU & IRU regarding the different alternatives for establishing<br />

the RWMOs.<br />

• On September 27 a meeting was held with Dr. Mohsen Elarabawy, the Head of the IRU, and<br />

Dr. Lehmann, the GTZ Program Director, to discuss the upcoming workshop. The<br />

proposed date for the workshop to be held in Ain Sokhna is 7-9 November subject to<br />

approval from H.E. Minister MWRI.<br />

Task 2.1 PMP Indicators and Targets<br />

Target Actual<br />

Task Indicator Units Baseline (Yr 1) (Qtr 3)<br />

2.1 Regional Water Management Organizations<br />

2.1.a Business plan submitted to MWRI for<br />

approval<br />

1/0 0 0 0<br />

2.1.b Business plan implemented 1/0 0 0 0<br />

TASK 2.2: FORMATION AND DEVELOPMENT OF INTEGRATED<br />

WATER MANAGEMENT DISTRICTS<br />

Eng. Nabil Eng. Fawzi (LTTA, Senior Water Resources Management Specialist) and Eng. Maher<br />

Khodary (LTTA, Senior Water Resources Management Specialist) are the coordinators for this task.<br />

Eng. Mohamed Hamed (IWMU) is IWMU Task Manager. Eng. Ayman Shedid (IWMU) and Eng.<br />

Soha Mostafa (IWMU) are providing technical assistance support. Activities carried out during the<br />

report period:<br />

• The decree assigning District Managers to the 45 IWMDs in East Delta was signed on 26<br />

July.<br />

• The decree assigning heads of sections to the 45 IWMDs in East Delta was signed on 6<br />

August.<br />

• On September 24, H.E. Minister MWRI issued 8 decrees defining each of the East Delta<br />

Directorate boundaries.<br />

• Staffing lists for general directorates, IWMD sections and water advisory teams have been<br />

prepared. Undersecretary decrees are being prepared and issued for all directorates &<br />

districts.<br />

6 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


• Directorate monthly meetings were held in August and September for the 8 East Delta<br />

Directorates (East Sharkia, Salhea, Ismailiya, Qualubiya, Damietta, El Salam, East Dakahliya,<br />

and South Dakahliya). The meetings were attended by the irrigation & drainage<br />

undersecretaries, director generals, district managers, and IWRM II regional advisors.<br />

• “Directorates and Districts Orientation Workshop” training (7 events) was completed.<br />

• The 60 hour “Basic Computer Skills” training (7 events) was completed.<br />

• Guidelines for preparing district business plans were prepared. Training on the “Business<br />

Plan” originally scheduled for September was postponed to early October.<br />

Task 2.2 PMP Indicators and Targets<br />

Task Indicator Units Baseline<br />

Target<br />

(Yr 1)<br />

Actual<br />

(Qtr 3)<br />

2.2 Formation and Development of Integrated Water Management Districts<br />

2.2.a Number of IWMDs established with fully<br />

staffed senior positions<br />

Number 0 45 45<br />

2.1.b Number of IWMDs with completed integrated<br />

maintenance plans Number 0 0 0<br />

2.2.c Number of IWMDs with a training room<br />

established and equipped<br />

Number 0 20 0<br />

2.2.d Number of General Directorates with a<br />

computer training center established and Number 0 8 2<br />

equipped<br />

2.2.e Number of IWRM I IWMDs participating in<br />

coordination meetings<br />

Number 27 27 27<br />

TASK 2.3: ESTABLISHMENT OF INFORMATION MANAGEMENT<br />

SYSTEMS FOR SUSTAINABLE WATER<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is the coordinator for this<br />

task. Eng. Hisham Shehab (IWMU) is IWMU task manager. They will be assisted by Eng. Mohamed<br />

Hamed (IWMU). Dr. Tom S. Sheng (CADI), Water Resources Information Specialist, is providing<br />

expatriate STTA support. Activities carried out during the report period:<br />

• Water monitoring and distribution staff has been assigned in all general directorates and<br />

IWMDs.<br />

• Procurement for computer equipment and peripherals, office equipment, training equipment,<br />

mapping equipment, water flow monitoring equipment, and water quality equipment<br />

continued.<br />

• Training on the “Flow Monitoring” (7 events) was conducted in August. The district director<br />

and water distribution engineer for each IWMD and general directorate attended the course.<br />

The inflow and outflow sites were defined in the 8 directorates & 45 IWMDs.<br />

• Meetings were held with MWRI Ministry Information Center to discuss Water Level &<br />

Complaint data bases and related training courses. A PO for the development of data bases<br />

is under preparation. The IWMDs have been asked to furnish the data required for the<br />

design of the Water Level & Complaint databases.<br />

• Several meetings were held with the general director for water distribution to discuss<br />

“Concepts of Matching Irrigation Supply & Demand” training course. A PO for this training<br />

is under preparation.<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 7


Task Indicator Units Baseline<br />

Target<br />

(Yr 1)<br />

2.3 Establishment of information<br />

2.3.a Number of IWMDs with calibrations for all<br />

authorized inflow and outflow structures<br />

Number 0 0 0<br />

2.3.b<br />

Number 0 0 0<br />

2.3.c<br />

2.3.d<br />

2.3.e<br />

Task 2.3 PMP Indicators and Targets<br />

Number of IWMDs with MISD installed and<br />

operational<br />

Number of IWMDs with completed and<br />

approved water resource management plan<br />

Number of IWMDs with water resource<br />

information systems installed and<br />

operational<br />

Number of Branch Canals with flows<br />

monitored by IWMD<br />

Actual<br />

(Qtr 3)<br />

Number 0 0 0<br />

Number 0 0 0<br />

Number 0 0 0<br />

TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />

Dr. Ibrahim Elassiouti (STTA, Water Resources Management Specialist) is the coordinator for this<br />

task. He is being assisted by Dahlia Hamdy (LTTA, Training Specialist). Activities carried out during<br />

the report period:<br />

• Draft Final <strong>Report</strong> on “MWRI Training needs Assessment” submitted to USAID for<br />

comments.<br />

• A total of 18 candidates were identified to participate in the IWRM II MS degree program,<br />

<strong>10</strong> for American University Cairo (AUC) and 8 for local universities.<br />

• One person was accepted for the AUC MBA program and will start in January 20<strong>10</strong>.<br />

• Two persons were accepted for the AUC environmental engineering program, subject to<br />

successful completion of the AUC intensive English language course. They will start their<br />

technical degree courses in January 20<strong>10</strong>.<br />

• Seven AUC candidates are attending remedial English language training with Amideast. They<br />

will take the TOEFL exam in November. All those who pass with a mark of 550 will be<br />

accepted to AUC.<br />

• Eight MWRI staff were accepted for admission for MS degree programs at one of the<br />

following local universities in Cairo, Benha, Zagazig and Shebin.<br />

• Arrangements have been started to send <strong>10</strong> of East Delta Region water resources and<br />

irrigation engineers on a study tour to Turkey.<br />

Task 2.4 PMP Indicators and Targets<br />

Task Indicator Units Baseline<br />

Target<br />

(Yr 1)<br />

Actual<br />

(Qtr 3)<br />

2.4<br />

2.4.a<br />

Capacity Building of MWRI Personnel<br />

Candidates selected Number 0 20 18<br />

2.4.b Candidates accepted by American University<br />

Cairo and local universities<br />

Number 0 20 11<br />

2.4.c Candidates graduated with M.S. degrees Number 0 0 0<br />

8 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


MONITORING AND EVALUATION<br />

Dr. Ibrahim Elassiouti (STTA, Water Resources Management Specialist) is coordinator for this task.<br />

Dr. Mark Svendsen (IRG), Monitoring and Evaluation specialist is providing expatriate STTA<br />

support. Activities carried out during the report period included:<br />

• Dr. Mark Svendsen carried out an assignment from July 7 to July <strong>10</strong> to present the<br />

Performance Monitoring Plan (PMP) to USAID.<br />

• Performance Monitoring Plan was submitted to USAID.<br />

• A meeting was held with staff from IWMU, IWRM II, National Water Resources Plan, IRU<br />

and Integrated Irrigation Improvement Project to discuss the M&E Workshop proposed for<br />

October 2009.<br />

• Invitation letters for the Workshop on “Monitoring & Evaluating Egyptian Water Sector<br />

Reforms” on October 22 at Conrad Hotel were distributed by Dr. Hussein El-Atfi, MWRI<br />

Senior Undersecretary & Chairman of Irrigation Department.<br />

• Draft final Farmer Baseline Field Survey report prepared by El-Zanaty & Associates was<br />

revised.<br />

EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND<br />

PARTICIPATION<br />

Dr. Wadie Fahim Mankarious (Senior Organization/Institutional Development Specialist) is<br />

coordinator for this task. He is supported by Ms. Joan Ablett, IRG Communications Director.<br />

Activities carried out during the report period:<br />

• Ms. Joan Ablett carried out an assignment from 3-<strong>10</strong> July to review and assist with Public<br />

Awareness & Communication activities, finalize the Communications Plan, and prepare Qtr 3<br />

implementation plan.<br />

• New logo was approved.<br />

• The CTO requested to incorporate some ideas from the draft project brochure designed by a<br />

local provider to the one designed by IRG HO.<br />

• Search continued for LTTA local communication specialist.<br />

TRAINING<br />

Dahlia Hamdy (LTTA, Training Specialist) is coordinator for this component. Activities carried out<br />

during the report period included:<br />

• Preparation for the M&E Workshop to be held October 22, 2009 at Conrad Hotel, Cairo.<br />

• Updated the IWRM II Training Calendar for Year 1.<br />

• Follow-up and arranged Amideast TOEFL Exam and courses for the AUC Candidates<br />

The following table shows the number of participants which have been trained under the project<br />

excluding seasonal and monthly meetings through the end of the reporting period.<br />

Total to Date<br />

<strong>Quarterly</strong> Total<br />

al Tot Male Female Total Male Female<br />

797 582 215 521 327 194<br />

Training conducted during the reporting period is listed below:<br />

ID Course Title Task Events Date Total<br />

1.1<br />

Water Users’ Staff<br />

Orientation<br />

1.1 7<br />

Aug.<strong>10</strong>-<br />

Aug.18<br />

Female Venue<br />

Participants Participants<br />

200 67 East Delta<br />

Region<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 9


ID Course Title Task Events Date Total Female Venue<br />

Participants Participants<br />

2.2.5 Basic Computer Skills 2.2 15<br />

July 15- 222 97 East Delta<br />

Aug. 30<br />

Region<br />

2.3.4<br />

Flow Monitoring<br />

Aug. 12- 99 30 East Delta<br />

2.3 6<br />

Orientation<br />

Aug. 20<br />

Region<br />

PROCUREMENT<br />

Eng. Nabil Fawzi (LTTA, Senior Water Resources Management Specialist) is coordinator for this<br />

activity. He is assisted by Dr. Wadie Fahim Mankarious (Senior Organization/Institutional<br />

Development Specialist), Eng. Maher Khodary (LTTA, Senior Water Resources Management<br />

Specialist), Mrs. Amany Mahmoud (Office and Personnel Manager), and Eng. Safaa Khodary (IT<br />

Specialist). Firras Traish, Procurement/Financial Specialist, is supporting the project as IRG home<br />

office backstop. Activities carried out during the report period included:<br />

• Procurement in accordance with the procurement plan continued.<br />

• Firras Traish provided STTA from 6-20 July to review and modify procurement, financial,<br />

and admin procedures and ensure they are being implemented in accordance with USAID,<br />

GOE, and IRG regulations and standards. He assisted in finalizing the procurement of the<br />

vehicles & MWRI equipment and establishment of the Mansoura Regional Office.<br />

Status of the procurement is shown below:<br />

<strong>10</strong> <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


Procurements for MWRI<br />

Total<br />

Quantity<br />

Tenders in<br />

Preparation<br />

Tenders<br />

Out for<br />

Bid Awarded Delivered<br />

No.<br />

Item<br />

1 Computer Equipment and Peripherals<br />

1-1 Standard Computer 132 Yes Yes Yes Yes No<br />

1-2 Database Computer 67 Yes Yes Yes Yes No<br />

1-3 Laptop 12 Yes Yes Yes Yes No<br />

1-4 A0 Plotter 9 No No No No No<br />

1-5 Ink Color Printer (A3) 63 Yes Yes Yes Yes No<br />

1-6 Desk Jet Printer 12 Yes Yes Yes Yes No<br />

1-7 Laser Printer (A3) 3 Yes Yes Yes Yes No<br />

1-8 Laser Printer (A4) 63 Yes Yes Yes Yes No<br />

1-9 Scanner (A4) 59 Yes Yes Yes Yes No<br />

1-<strong>10</strong> Scanner (A3) 4 No No No Qtr 4 09 No<br />

1-11 USB Hard Drive 71 Yes Yes Yes Yes No<br />

1-12 Smart UPS 187 Yes Yes Yes Yes No<br />

1-13 Table 181 Yes Yes Yes Yes No<br />

1-14 Chair 186 Yes Yes Yes Yes No<br />

2<br />

2-1<br />

Office Equipment<br />

Air-conditioning (3 HP) 61 Yes Yes Yes Qtr 4 09 No<br />

2-2 Ceiling Fan 118 No No No Qtr 4 09 No<br />

2-3 Photocopier 60 Yes Yes Yes Yes No<br />

2-4 Fax Machine 61 Yes Yes Yes Yes No<br />

3<br />

3-1<br />

Training Equipment<br />

Flip Chart and Stand 59 Yes Yes Yes Yes No<br />

3-2 TV <strong>10</strong> No No No Qtr 4 09 No<br />

3-3 VCR & DVD Player 9 No No No Qtr 4 09 No<br />

3-4 Laptop 5 Yes Yes Yes Yes No<br />

3-6 Furniture 63 No No No Qtr 4 09 No<br />

3-7 White Board 59 Yes Yes Yes Yes No<br />

3-8 Digital Camera (>=5 MB) 66 Yes Yes No Yes No<br />

3-9 Sony 950 HD Camera 1 Yes Yes No Yes No<br />

3-<strong>10</strong> Flash Cannon 3 Yes Yes No Yes No<br />

3-11 Tele Lens Cannon 1 Yes Yes No Yes No<br />

3-12 English Language Book 53 No No No Qtr 4 09 No<br />

3-13 Data Show and screen 21 Yes Yes Yes Yes No<br />

4<br />

4-1<br />

Local Area Network Equipment<br />

Wireless Router (4 ports) 59 Yes Yes Yes Yes No<br />

4-2 DSL Modem 59 Yes Yes Yes Yes No<br />

5<br />

5-1<br />

Mapping Equipment<br />

GPS 1<strong>10</strong> Yes Yes Yes Yes No<br />

5-2 GIS Computer 3 Yes Yes Yes Yes No<br />

5-3 Satellite Images - Maps - Software 1 No No No Qtr 4 09 No<br />

6<br />

6-1<br />

Water Flow Monitoring Equipment<br />

Fiber Glass Boat 53 Yes Yes Yes Qtr 4 09 No<br />

6-2 Winch + Tagline (Depth Meter) 61 Yes Yes Yes Qtr 4 09 No<br />

6-3 Winch + Tagline (Bank to Bank) 61 Yes Yes Yes Qtr 4 09 No<br />

6-4 Stop Watch 61 Yes Yes Yes Qtr 4 09 No<br />

6-5 Current Meter & LCD Digital 61 Yes Yes No Qtr 4 09 No<br />

6-6 Flow Tracker 1 No No No TBD No<br />

6-7 Measurement Gage (Installed) 490<br />

To be done by MWRI<br />

6-8 GW Measure Tape 53 No No No TBD No<br />

6-9 Data Logger Modem <strong>10</strong> Yes Yes Yes Yes No<br />

6-<strong>10</strong> Data Logger <strong>10</strong> Yes Yes Yes Yes No<br />

7<br />

7-1<br />

Water Quality Monitoring Equipment<br />

Portable TDS <strong>10</strong><br />

Cancelled<br />

7-2 PH Conductivity Do TM 55 Yes Yes No Qtr 4 09 No<br />

8<br />

8-1<br />

Training Center Equipment<br />

Standard Computer 48 Yes Yes Yes Yes No<br />

8-2 Laptop 16 Yes Yes Yes Yes No<br />

8-3 Ink Color Printer (A3)<br />

Cancelled<br />

8-4 All-in-one B&W Laser Printer (A4) 8 Yes Yes Yes Yes No<br />

8-5 USB Hard Drive 8 Yes Yes Yes Yes No<br />

8-6 Smart UPS 48 Yes Yes Yes Yes No<br />

8-7 Table 48 No No Yes Yes No<br />

8-8 Chair 48 No No Yes Yes No<br />

Transfer<br />

to MWRI<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 11


3. ACTIVITIES PLANNED FOR<br />

NEXT QUARTER<br />

TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />

CANAL WATER USER ASSOCIATIONS<br />

The following activities are planned for the next quarter:<br />

• Dr. Stan Peabody, Expat Senior Participatory Water Management Sociologist will carry out<br />

an assignment in October 2009 to assess Year 1 progress and assist in preparation of the<br />

Year 2 work plan.<br />

• Complete report for the assessment of IWRM I BCWUAs.<br />

• Monitor IWRM I BCWUAs.<br />

• Conduct “BCWUAs Formation-Preparation Phase 1” and “BCWUAs Formation-<br />

Establishment Phase 2” training.<br />

• Begin BCWUA formation phase (data collection, election of representative assemblies &<br />

boards and signing the MOUs.)<br />

• Prepare Year 1 achievement report<br />

• Prepare input to Year 2 Work Plan<br />

TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />

DRAIN MAINTENANCE<br />

The following activity is planned for next quarter:<br />

• Dr. Stan Peabody, Expat Senior Participatory Water Management Sociologist, will carry out<br />

an assignment in October 2009 to assess Year 1 progress and assist in preparation of the<br />

Year 2 work plan.<br />

• Prepare Year 1 achievement report<br />

• Prepare input to Year 2 Work Plan<br />

TASK 1.3: IMPROVEMENTS IN WATER PRODUCTIVITY AND<br />

EFFICIENCY<br />

The following activities are planned for next quarter:<br />

• Final approval of the pilot area in West Sharkiya.<br />

• Develop an action plan for implementing the activities in the Pilot Area<br />

• Prepare Year 1 achievement report<br />

• Input to Year 2 Work Plan<br />

• Prepare protocols of collaboration with MALR Agencies<br />

• Prepare protocols of collaboration with NGOs<br />

• Start orientation of BCWUA farmers<br />

TASK 1.4: WASTEWATER REUSE<br />

The following activities are planned for next quarter:<br />

12 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


• Complete the task force team of local consultants to work on the feasibility study.<br />

• Complete first draft of the feasibility study.<br />

• Conduct a presentation to USAID on findings of the feasibility study.<br />

• Continue working with the identified private investors and searching for additional private<br />

investors.<br />

• Prepare Year 1 achievement report<br />

• Prepare input to Year 2 Work Plan<br />

TASK 2.1: REGIONAL WATER MANAGEMENT<br />

ORGANIZATIONS<br />

The following activities are planned for next quarter:<br />

• In cooperation with MWRI and IRU review the concepts and requirements for establishing a<br />

RWMO for the E. Nile Delta Region.<br />

• Participate in the IRU sponsored workshop to be held in November.<br />

• Prepare Year 2 Work Plan<br />

TASK 2.2: FORMATION AND DEVELOPMENT OF INTEGRATED<br />

WATER MANAGEMENT DISTRICTS<br />

The following activities are planned for next quarter:<br />

• Support preparation of organizational plans and transfer of staff.<br />

• Support transfer of facilities and equipments.<br />

• Support preparation of maintenance plans and budget requests.<br />

• Provide computer equipment and software procurement.<br />

• Participate in Directorate Monthly Meetings<br />

• Conduct “Preparation of Business Plan” training.<br />

• Conduct “Integrated & Preventive Maintenance” training.<br />

• Provide limited follow up support to IWRM I.<br />

• Prepare Year 1 achievement report.<br />

• Prepare input to Year 2 Work Plan.<br />

TASK 2.3: ESTABLISHMENT OF INFORMATION MANAGEMENT<br />

SYSTEMS FOR SUSTAINABLE WATER<br />

The following activities are planned for next quarter:<br />

• Dr. Tom Sheng, Computer Assisted Development, Inc. Expat Senior Water Resources<br />

Management Information Systems Specialist, will carry out an assignment in October 2009 to<br />

assess Year 1 progress and assist in preparation of the Year 2 work plan.<br />

• Continue procurement process.<br />

• Start developing water resources databases.<br />

• Conduct “GPS & Digital Mapping” training<br />

• Conduct “MISD Concept” training.<br />

• Prepare Year 1 achievement report.<br />

• Prepare input to Year 2 Work Plan.<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 13


TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />

The following activities are planned for next quarter:<br />

• Assist MS candidates with application processes.<br />

• Follow-up on AUC applicants taking TOEFL in Nov 2009.<br />

• Follow-up with two AUC students taking AUC language training.<br />

• Hold orientation seminar for selected AUC candidates that are enrolled for MS degree in<br />

January 20<strong>10</strong>.<br />

• Prepare input to Year 2 Work Plan.<br />

• Continue planning study tour to Turkey.<br />

MONITORING AND EVALUATION<br />

The following activities are planned for the next quarter:<br />

• Dr. Mark Svendsen (Expat. STTA) will carry out an assignment in October 2009 to assist<br />

with the M&E Workshop, prepare M&E report for Project Year 1, and prepare input to<br />

M&E plan for the second year.<br />

• Hold Ministry-wide M&E Workshop on 22 October at Conrad Hotel.<br />

• Provide input to Year 2 Work Plan.<br />

EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND<br />

PARTICIPATION<br />

The following activities are planned for the next quarter:<br />

• Mobilize a long term communication specialist.<br />

• Print the project brochure.<br />

• Prepare PA material to support the other tasks as needed.<br />

TRAINING<br />

The following training courses are planned for next quarter:<br />

ID Course Title Task Events Venue<br />

2.2.2.11 Directorate Monthly Meetings 2.2 12 Each Directorate<br />

2.3.12.1 Introduction to GPS 2.3 8 Each Directorate<br />

1.1.2.1 BCWUAs Formation-Preparation<br />

Phase 1<br />

1.1 7 Each Directorate<br />

2.2.3.1 Preparation of Business Plan 2.2 7 Each Directorate<br />

2.2.7.1 Integrated & Preventive<br />

Maintenance<br />

2.2 7 Each Directorate<br />

2.3.12.6 Intro. To GPS & Digital Mapping 2.3 8 Each Directorate<br />

1.1.4.1 BCWUAs Formation-Establishment<br />

Phase 2<br />

2.3.1.1 Concepts of Matching Irrigation<br />

Supply & Demand<br />

1.1 7 Each Directorate<br />

2.3 8 Each Directorate<br />

14 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


PROCUREMENT<br />

Procurement activities for next quarter include:<br />

• Continue procurement process. Supply, deliver, and transfer all supplied equipment to<br />

IWMDs and IWM Directorates.<br />

• Receive project vehicles.<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 15


4. PROBLEMS AND ISSUES<br />

TASK 1.1: FORMATION AND DEVELOPMENT OF BRANCH<br />

CANAL WATER USER ASSOCIATIONS<br />

Water advisory teams (WATs) in the general directorates and districts are being established. It is<br />

expected that all WATs will be formed and staff assigned not later than October 2009.<br />

TASK 1.2: SUSTAINABLE LOCAL FINANCING FOR CANAL AND<br />

DRAIN MAINTENANCE<br />

MWRI is preparing a separate law on user participation. This law is expected to cover the necessary<br />

legal framework necessary to initiate sustainable local financing for canal and drain maintenance; if<br />

approved this will facilitate the implementation of Task 1.2. IWMU will follow-up on the status of<br />

the promulgation of the law.<br />

TASK 1.3: IMPROVEMENTS IN WATER PRODUCTIVITY AND<br />

EFFICIENCY<br />

BCWUAs will play a key role in the successful implementation of Task 1.3. Until BCWUAs are<br />

formed in the 8 project target directorates in the East Delta, initial efforts will focus on a BCWUA<br />

formed under IWRM I in West Sharkiya Directorate. Experience and lessons learned will be<br />

transferred and extended to other East Delta Directorates after establishment of the new BCWUAs.<br />

USAID is encouraging IWRM II to work with MALR entities, private sector and NGOs on this task.<br />

Procurement funds proposed for carrying out demonstration site activities for Task 1.3<br />

(Improvements in Water Productivity and Efficiency) were not approved by USAID. Therefore<br />

IWRM II is investigating ways to leverage funds or maximize the use of existing programs from<br />

these potential partners.<br />

TASK 1.4: WASTEWATER REUSE<br />

None at this time.<br />

TASK 2.1: REGIONAL WATER MANAGEMENT<br />

ORGANIZATIONS<br />

The position of MWRI under the new Minister towards regional authorities is under review. IWRM<br />

II is relying on IRU to clarify the MWRI model for implementing RWMO. Until this model is<br />

decided this task will focus on providing support and assistance to MWRI and the IRU in selecting<br />

this model. H.E. Minister MWRI has requested that a special one day workshop be held to decide<br />

this issue. The date for the workshop is under discussion.<br />

TASK 2.2: FORMATION AND DEVELOPMENT OF INTEGRATED<br />

WATER MANAGEMENT DISTRICTS<br />

Most of the IWMD’s offices are in need of maintenance. Several of the offices need furniture.<br />

MWRI is aware of this situation and has promised to address this issue.<br />

16 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


IWMD & general directorate staff sections have still not been officially assigned in several general<br />

directorate and districts. MWRI is aware of this situation and is addressing the issue.<br />

General Directorate Computer Training Rooms have not been assigned in 6/8 of the directorates.<br />

MWRI is aware of this situation and has promised to solve this problem.<br />

In a number of directorates sub-surface drainage maintenance centers, drainage equipment and the<br />

drainage flushing machines have not been transferred from EPADP to the newly formed IWMDs.<br />

MWRI is aware of the situation.<br />

TASK 2.3: ESTABLISHMENT OF INFORMATION MANAGEMENT<br />

SYSTEMS FOR SUSTAINABLE WATER<br />

MWRI promised to have staff lists for the new IWMDs/Directorates by mid-July. The assigning of<br />

staff is still on-going. MWRI is aware of the situation and is addressing the issue. Training schedules<br />

are being adjusted to account for these delays.<br />

TASK 2.4: CAPACITY BUILDING OF MWRI PERSONNEL<br />

Out of 50 MWRI personnel expected to enroll in MS programs 18 were identified by MWRI. It is<br />

expected that 8 persons will be enrolled at AUC and <strong>10</strong> persons will be registered at local universities<br />

by January 20<strong>10</strong>. The MS degree at AUC takes two years for full time graduate students and at least<br />

three years for local universities part time. This means that 32 additional MWRI staff should be<br />

identified and registered during year 2009/20<strong>10</strong> in order to finish before the end of the project (Sept.<br />

2012).<br />

MONITORING AND EVALUATION<br />

None at this time.<br />

EDUCATION, COMMUNICATION, PUBLIC AWARENESS AND<br />

PARTICIPATION<br />

The project is continuing the search for a permanent communication specialist. IRG home office has<br />

been assisting the project until this position can be filled.<br />

TRAINING<br />

The training program has been revised to adjust to the delays in forming IWMDs and assigning staff.<br />

PROCUREMENT<br />

Because of delays in forming the IWMDs, delivery and installation of computer equipment has been<br />

delayed in several locations. MWRI is aware of this problem and is actively trying to solve this issue.<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 17


5. STAFF LEVEL OF EFFORT<br />

The IWRM II LTTA and STTA professional, technical, and administrative support staff for the<br />

quarter are shown below:<br />

RESIDENT STAFF<br />

EXPATRIATE<br />

NAME<br />

Dr. Jeff Fredericks<br />

LOCAL EGYPTIAN<br />

NAME<br />

Eng. Nabil Fawzi<br />

Dr. Wadie Mankarious<br />

Eng. Maher Khodary<br />

Eng. El-Sayed Nagi<br />

Amany Mahmoud<br />

Dahlia Hamdy<br />

Alaa Hafez<br />

Ramy Ghaly<br />

Waleed El Rifaie<br />

POSITION<br />

Chief of Party<br />

POSITION<br />

Senior Water Resource Management Specialist<br />

Senior Organization/Institutional Development Specialist<br />

Senior Water Resource Management Specialist - Zagazig<br />

Senior Water Resource Management Specialist - Mansoura<br />

Office Manager – Cairo<br />

Training Specialist – Cairo<br />

Accountant – Cairo<br />

Regional Office – Zagazig<br />

Regional Office – Mansoura<br />

SHORT TERM STAFF DURING THE REPORT PERIOD<br />

EXPATRIATE<br />

NAME<br />

Andy Tczap (IRG)<br />

Dr. Mark Svendsen (IRG)<br />

Firras Traish (IRG)<br />

Joan Ablett (IRG)<br />

LOCAL EGYPTIAN<br />

NAME<br />

Dr. Ibrahim Elassiouty<br />

POSITION<br />

Acting COP<br />

M&E Specialist<br />

Procurement/Financial Specialist<br />

Public Awareness & Communication Specialist<br />

POSITION<br />

Water Resources Training Specialist<br />

18 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


6. STATUS OF FINANCES AND EXPENDITURES<br />

Financial summary for the reporting period July – September 2009 is presented below:<br />

USD Budget<br />

Budget Line Item Budgeted Obligated Current<br />

Claim<br />

Claims to<br />

Date<br />

Projected<br />

Expenses for<br />

Next Quarter<br />

Remaining<br />

Budget<br />

Balance<br />

% Budget<br />

Claimed<br />

Salaries 1,121,498 71,393 207,031 75,000 914,467 18%<br />

Overhead and<br />

Fringes<br />

345,848 41,401 83,347 43,000 262,501 24%<br />

Consultant Labor 267,212 6,096 32,001 6,000 235,211 12%<br />

Other Direct<br />

Costs<br />

676,501 43,120 136,218 50,000 540,283 20%<br />

Procurement 525,000 200,407 238,565 50,000 286,435 45%<br />

G&A 611,7<strong>10</strong> 88,792 166,890 42,630 444,820 27%<br />

Subcontractors 188,487 0 8,784 12,000 179,703 5%<br />

Subcontractor<br />

Handling<br />

7,539 0 991 480 6,548 13%<br />

Subtotal 3,743,795 451,2<strong>10</strong> 873,828 279,1<strong>10</strong> 2,869,967 23%<br />

Fixed Fee 187,190 22,560 43,692 13,956 143,498 23%<br />

Total Cost Plus<br />

Fixed Fee<br />

Remaining<br />

Obligation<br />

Balance<br />

% Obligation<br />

Claimed<br />

3,930,985 2,000,000 473,770 917,519 293,066 3,013,466 23% 1,082,481 46%<br />

Source: IRG Invoices # 506<strong>10</strong>6, 506<strong>10</strong>7, 506<strong>10</strong>8<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 19


LE Budget<br />

Budget Line Item Budgeted Obligated Current<br />

Claim<br />

Claims to<br />

Date<br />

Projected<br />

Expenses for<br />

Next Quarter<br />

Remaining<br />

Budget<br />

Balance<br />

% Budget<br />

Claimed<br />

Remaining<br />

Obligation<br />

Balance<br />

% Obligation<br />

Claimed<br />

Salaries 5,779,775 329,656 823,392 335,000 4,956,383 14%<br />

Overhead and<br />

Fringe<br />

1,142,061 0 0 0 1,142,061 0%<br />

Consultant Labor 2,554,435 92,925 124,425 <strong>10</strong>0,000 2,430,0<strong>10</strong> 5%<br />

Other Direct Costs 9,445,842 656,821 1,021,267 500,000 8,424,575 11%<br />

Procurement 7,000,000 2,396,051 2,534,566 2,400,000 4,465,434 36%<br />

G&A 4,943,918 373,588 599,742 337,075 4,344,176 12%<br />

Subcontractors 700,000 332,317 398,335 300000 301,666 57%<br />

Subcontract<br />

Handling<br />

0 0 0 0 0 0%<br />

Subtotal 31,566,031 4,181,357 5,501,727 3,972,075 26,064,304 17%<br />

Fixed Fee 1,578,302 209,068 275,086 198,604 1,303,216 17%<br />

Total Cost Plus<br />

Fixed Fee<br />

Source: IRG Invoices #506204, 506205, 506206<br />

33,144,333 14,000,000 4,390,425 5,776,813 4,170,679 27,367,520 17% 8,223,187 41%<br />

20 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009)


7. LIST OF REPORTS<br />

No. NAME DATE<br />

1 Annual Work Plan Year 1(January – December 2009) March 2009<br />

2 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 1st Quarter (January–March 2009) April 2009<br />

3 Economic Feasibility of Alternative Crops with Potential for the Reuse May 2009<br />

of Treated Wastewater in Egypt<br />

4 Communication Plan May 2009<br />

5 IWRM I BCWUA Assessment (Draft) July 2009<br />

6 Performance Monitoring Plan July 2009<br />

7 Farmer Baseline Survey July 2009<br />

8 MWRI Training Needs Assessment July 2009<br />

9 <strong>Quarterly</strong> <strong>Report</strong> Year 1: 2nd Quarter (April – June 2009) July 2009<br />

<strong>Quarterly</strong> <strong>Report</strong> Year 1: 3 rd Quarter (July – September 2009) 21


U.S. Agency for International Development<br />

1300 Pennsylvania Avenue, NW<br />

Washington, DC 20523<br />

Tel: (202) 712-0000<br />

Fax: (202) 216-3524<br />

www.usaid.gov<br />

DOCUMENTITLE<br />

SECTION TITLE<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!