<strong>Presentation</strong> on<br />

Hydel Business Plans<br />

6 October 2010 1


<strong>Presentation</strong> scheme<br />

• EXISTING HYDEL FACILITIES<br />

• REHABILITATION PLANS<br />

• EXPANSION SO PLANS<br />

• FINANCIAL PLANS<br />

6 October 2010 2


EXISTING HYDEL FACILITIES<br />

6 October 2010 3


EXISTING <strong>WAPDA</strong> HYDEL POWER STATIONS (6444.0 MW)<br />

STATION<br />

TARBELA<br />

GHAZI<br />

BAROTHA<br />

WATER WAY UNITS CAPACITY OF INSTALLED DATE OF<br />

(River/Canal) NO. EACH UNIT CAPACITY COMMISSIONING<br />

(MW) (MW)<br />

INDUS 1~4 175 700 Jul. 1977<br />

5~8<br />

(Reservoir) 175 700 Dec. 1982<br />

9~10 175 350 Apr. 1985<br />

11~14 432 1728 Feb. 1993<br />

TOTAL 3478<br />

INDUS 1 290 290 Jul. 2003<br />

(D/S Tarbela) 2 290 290 Aug. 2003<br />

3 290 290 Oct. 2003<br />

4 290 290 Dec. 2003<br />

5 290 290 Mar. 2004<br />

TOTAL 1450<br />

MANGLA<br />

WARSAK<br />

CHASHMA<br />

JHELUM<br />

1~4<br />

100 400 1967/1969<br />

(Reservoir) 5~6 100 200 Mar. 1974<br />

7~8<br />

100 200 1981<br />

9~10 100 200 1993-1994<br />

TOTAL 1000<br />

KABUL 1~4 40 160 Jul. 1960<br />

(Reservoir) 5~6 41.48 82.96 Mar. 1981<br />

TOTAL 242.96<br />

INDUS 1 23 23 May. 2001<br />

(Chashma 2 23 23 Apr. 2001<br />

Barrage) 3 23 23 Apr. 2001<br />

4 23 23 Mar. 2001<br />

5 23 23 Mar. 2001<br />

6 23 23 Feb. 2001<br />

7 23 23 Dec. 2000<br />

8 23 23 Dec. 2000<br />

TOTAL 184<br />

6 October 2010 4


EXISTING <strong>WAPDA</strong> SMALL HYDEL POWER STATIONS<br />

WATER WAY UNITS CAPACITY OF INSTALLED DATE OF<br />

STATION<br />

(River/Canal) NO. EACH UNIT CAPACITY COMMISSIONING<br />

(MW) (MW)<br />

RASUL<br />

UJC* 1~2 11 22 Jul. 1952<br />

DARGAI<br />

NANDIPUR<br />

SHADIWAL<br />

CHICHOKI<br />

K/GARHI<br />

RENALA<br />

CHITRAL<br />

Swat** 1~4 5 20 Dec. 1952<br />

UCC*** 1~3 4.6 13.8 Mar. 1963<br />

UJC* 1~2 6.75 13.5 Jan. 1961<br />

UCC*** 1~3 44 4.4 13.2 Aug. 1959<br />

KUCHKOT**** 1~4 1 4 Feb. 1958<br />

LBDC***** 1~5 0.22 1.1 Mar. 1925<br />

LUDKO 1~2 0.3 1.0 1975<br />

3~4 0.2 1982<br />

Total<br />

6,444<br />

* : Upper Jhelum Canal from River Jhelum<br />

** : Swat Canal from River Swat<br />

*** : Upper Chenab Canal from River Chenab<br />

**** : Kachkot Canal from River Kurram<br />

***** : Lower Bari Doab Canal from Balloki Headworks on River Ravi<br />

NOTE: The Jabban Hydel Pow er Station has been de-commissioned due to fire incident on 12-11-2006 and its capacit<br />

been included in total installed capacity <strong>of</strong> <strong>WAPDA</strong> Hydro Electric.<br />

6 October 2010 5


REHABILITATION PLANS<br />

6 October 2010 6


REHABILITATION OF HYDEL POWER STATIONS<br />

Aging E&M equipment <strong>of</strong> Hydel Power Plants are being<br />

rehabilitated. Rehabilitation / Up‐gradation required for the<br />

following power plants;<br />

• Jabban Rehabilitation Project (Unit 1‐4, each <strong>of</strong> 5.5 MW) Approved<br />

Cost Rs. 3734 Million. (Implementation underway)<br />

• Mangla Hydel Power Station (Unit 1‐10, each <strong>of</strong> 100 MW).<br />

Estimated Cost – US$ 500 Million. (Consultants approved)<br />

• Warsak Hydel Power station (Unit 1‐4, each <strong>of</strong> 40 MW).<br />

Estimated Cost – US$ 300 Million. (Consultant being approved)<br />

• Tarbela Hydel Power Station (Unit 1,3&4, each <strong>of</strong> 175 MW<br />

Estimated Cost – US$ 16.5 Million. (Implementation <strong>of</strong><br />

rehabilitation is underway)<br />

6 October 2010 7


EXPANSION PLANS<br />

6 October 2010 8


PAKISTAN’S HYDROPOWER POTENTIAL<br />

(RIVERWISE SUMMARY)<br />

S# River/ Tributary Power (MW)<br />

1. Indus River 37780<br />

2. Tributaries <strong>of</strong> Indus (Northern Areas) & NWFP 6006<br />

Sub Total (1+2) 43786<br />

3. Jhelum River 3143<br />

4. Kunhar River 1435<br />

5. Neelum River & its Tributaries 1844<br />

6. Poonch River 397<br />

Sub Total (3+4+5+6) 6819<br />

7. Swat River & its Tributaries 2371<br />

8. Chitral River & its Tributaries 2282<br />

Sub Total (7+8) 4653<br />

9. Schemes below 50 MW on Tributaries 1055<br />

10. Schemes below 50 MW on Canals 408<br />

Sub Total (9+10) 1463<br />

11. Small & Medium Dams 52<br />

TOTAL 56773<br />

6 October 2010 9<br />

9


HYDROPOWER PROJECTS UNDER IMPLEMENTATION<br />

PC-I Cost Gen Capty<br />

Progress/<br />

Sr # Name <strong>of</strong> Project Location (Rs. Billion) (MW) Donors/ lenders Completion<br />

Addl 644<br />

GOP funding/<br />

Substantially<br />

1 Mangla Dam Raising Mirpur, AJK 62.558 GWh <strong>WAPDA</strong> bonds completed<br />

GOP funding/ Tariff<br />

2 Gomal Zam Dam FATA 12.829 17.4 financing 59%/ (Jan 2011)<br />

3 Satpara Dam Gilgit Baltistan 4.397 15.8 GOP funding 87% (Oct 2010)<br />

4 Khan Khwar Besham, KPK<br />

IDB/ <strong>WAPDA</strong> Bond,<br />

5.363 72.0 Tariff financing 94% (Oct/2010)<br />

IDB/ <strong>WAPDA</strong> Bond,<br />

5 Duber Khwar Kohistan, KPK 9.754 130.0 Tariff financing 74%(Jan/2011)<br />

6 Allai Khwar Battagram, KPK<br />

IDB/ <strong>WAPDA</strong> Bond,<br />

8.578 121.0 Tariff financing 51% (10/2011)<br />

7 Jinnah Jinnah Barrage<br />

Chinese Supplier's<br />

7.680 96.0 Credit/ Tariff Fin 94% (6/2011)<br />

8 Jabban Rehabilitation Malakand KPK 3.734 22.0 afd France/ Tariff Fin 5% (June 2013)<br />

Surcharge/ Middle<br />

9 Neelum Jhelum AJK 130.000000 969.0 East donors/ CEXIM 13% (10/2016)<br />

Total 241.159 1443.2<br />

6 October 2010 10


Future Hydel Projects to be undertaken<br />

Sr # Name <strong>of</strong> Project River Location<br />

Capacity<br />

(MW)<br />

Annual<br />

NEO<br />

(GWh)<br />

Estimated Cost (US$ M)<br />

LCC FCC Total<br />

Completion<br />

period<br />

1 Diamer Basha Dam Indus Chilas GB 4,500 18,000 7,266.4 3,911.8 11,178.2 2010-20<br />

2 Tarbela 4th Extension Indus Tarbela, KPK 960 1,600 - 700.0 700.0 2011-15<br />

3 Kurram Tangi Kurram North Waziristan 83 350 148.0 67.1 215.1 2010-14<br />

4 Golan Gol Mastuj Chitral, KPK 106 436 55.0 33.0 87.9 2010-1414<br />

5 Keyal Khwar Indus Kohistan KPK 122 479 83.0 97.0 180.0 2012-16<br />

6 Phandar Ghizar Gilgit Gg Baltistan sa 80 350 40.0 00 30.0 0 70.0 00 2011-15<br />

7 Munda Swat KPK 740 2,400 537.0 612.0 1,149.0 2011-17<br />

8 Dasu Indus Gilgit Baltistan 4,000 21,215 4,118.0 4,668.0 8,786.0 2012-20<br />

9 Bunji Indus Gilgit Baltistan 5,400 20,750 7,905.0 4,237.0 12,142.0 2015-24<br />

6 October 2010 11


FINANCIAL PLANS<br />

6 October 2010 12


Income statement<br />

Unaudited Audited<br />

[Thous.Rs]<br />

For the year ended on June 30 2010 2009<br />

Sales 29,092,610 29,013,170<br />

Cost <strong>of</strong> fElectricity i 9,151,587 587 9,091,051<br />

051<br />

Gross pr<strong>of</strong>it 19,941,023 19,922,119<br />

Operating Expenses 501,728 1,119,174<br />

Operating Pr<strong>of</strong>it 19,439,295 18,802,945<br />

Other Income 4,064,259 3,111,951<br />

Financial Cost 13,161,880 6,120,792<br />

Net pr<strong>of</strong>it for the year 10,341,674 15,794,104<br />

Less: NHP paid to Kyber PK 6,000,000 6,000,000<br />

Provision for Capital Reserves 4,341,674 9,794,104<br />

6 October 2010 13


Cash Flow Statement<br />

[Mln.Rs]<br />

[Mln.Rs]<br />

Receipts 2009-10 2008-09<br />

Receipts for power sale 18,948 20,063<br />

Foreign loan withdrawls 2,351 1,558<br />

GoP Cash Dev loans 1,373 87<br />

Bridge Financing loans - 2,045<br />

Dividends & misc income 2,609 2,046<br />

Disbursements<br />

Total receipts 25,281 25,799<br />

O&M 3,924 2,731<br />

Debt servicing 2,190 10,479<br />

NHP/WUC 7,455 4,916<br />

Hydel power development 8779 8,779 5,907<br />

Misc payments 1,675 5,620<br />

Total disbursements 24,023 29,653<br />

Incr / (decr) in cash balance 1,258 (3,854)<br />

6 October 2010 14


Balance Sheet<br />

(Thous - Rs.)<br />

2010 2009<br />

ASSETS Unaudited Audited<br />

NON - CURRENT ASSETS<br />

Property Plant & Equipments 111,197,509 , 114,545,887<br />

,<br />

Capital work-in-progress 45,922,819 27,280,839<br />

157,120,328 141,826,726<br />

Long Term Investments 184,298,081 184,298,081<br />

Investment in Associates 4,053,363 363 4053363 4,053,363<br />

Investment in Subsidiaries 1,542,826 1,542,826<br />

Notes Receivables 18,561,183 18,535,638<br />

Long Term Advances, Deposits 241,525 200,143<br />

365,817,305 350,456,777<br />

CURRENT ASSETS<br />

Stores, Spares & Loose Tools 1,422,760 1,441,536<br />

Trade Debtors - CPPA 111,316,430 104,208,132<br />

Advances and Other Receivables 30,967,281 64,882,410<br />

Short term investmenst 261,000 271,000<br />

Cash & Bank Balances 2,699,903 772,191<br />

146,667,374 171,575,269<br />

TOTAL ASSETS 512,484,679 522,032,046<br />

6 October 2010 15


Balance Sheet<br />

(Thous - Rs.)<br />

2010 2009<br />

EQUITY AND LIABILITIES Unaudited Audited<br />

Share Capital 9,522,000 9,522,000<br />

Capital Reserves for GoP investment in 184,298,080 184,298,080<br />

Capital Reserves for development projects 172,970,160 168,628,558<br />

366,790,240 362,448,638<br />

Non - Current Liabilities<br />

Long Term Loans 56,181,958 49,196,251<br />

Grants 1,593,391 1,593,391<br />

Liability Against Assets Subject to Finance 8,000,000 8,000,000<br />

Deferred liabilities 2,530,869 1,239,890<br />

68,306,218 60,029,532<br />

Current Liabilities<br />

Current Maturity <strong>of</strong> Loans 6,127,812 4,765,631<br />

Accrued Liabilities 1,221,025 1,285,883<br />

Short Term Borrowings 8,409,163 47,162,908<br />

Short Term Liabilities 46,564,021 34,263,371<br />

Other Payables 15,066,200 12,076,083<br />

77,388,221 99,553,876<br />

TOTAL EQUITY & LIABILITIES 512,484,679 522,032,046<br />

6 October 2010 16


<strong>WAPDA</strong> Hydroelectric<br />

NEPRA determined Revenue Requirement for FY 2009-10<br />

Sr.No.<br />

Hydel Power<br />

Station<br />

Installed<br />

Capacity<br />

Net<br />

Electrical<br />

Output<br />

Regulatory<br />

assets base<br />

Return on<br />

Investment<br />

O&M Depr WUC<br />

Cost at<br />

Bus Bar<br />

Cost at<br />

Bus Bar<br />

MW GWh Mln. Rs. Mln. Rs. Mln. Rs. Mln. Rs. Mln. Rs. Mln. Rs. Rs/kWh<br />

1 Tarbela 3,478 14,650 8,263 1,133 1,281 2,022 4,436 0.3028<br />

2 Ghazi Brotha 1,450 6,200 79,070 10,845 549 2,127 13,521 2.1808<br />

3 Mangla 1,000 5,400 8,637 1,185 1,251 582 720 3,738 0.6921<br />

4 Warsak 243 910 1,102 151 386 60 597 0.6558<br />

5 Chashma 184 1,062 14,563 1,997 334 598 2,929 2.7578<br />

6 Rasul 22 35 141 19 42 6 68 1.9298<br />

7 Dargai 20 155 31 4 92 1 97 0.6255<br />

8 Nandipur 14 35 13 2 50 1 52 1.4978<br />

9 Shadiwal 14 47 13 2 36 1 39 0.8242<br />

10 Chichoki 13 31 - - 36 - 36 1.1599<br />

11 Kuram Garhi 4 17 - - 19 - 19 1.0940<br />

12 Renala Khurd 1 3 14 2 12 - 14 4.7933<br />

13 Chitral 1 5 - - 27 - 27 5.4556<br />

Total 6,444 28,550 111,847 15,340 4,114 5,398 720 25,572 0.8957<br />

Capital Work in Progress 31,207 4,280 4,280<br />

Adhoc NHP to GoKPK 6,000<br />

Other Income (2,152)<br />

Total<br />

143,054 19,620 33,700 1.1804<br />

6 October 2010 17


<strong>WAPDA</strong> Hydroelectric<br />

Power Sale Billing and Settlement Plan for FY 2010-11<br />

Unit Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Total<br />

Contracted Capacity MW 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444<br />

Estimated Sale <strong>of</strong> Power Gwh 3,894 4,064 4,100 2,100 2,471 1,045 514 1,532 1,419 1,553 2,847 3,011 28,550<br />

Fixed Charges Rs./kW/M 265.96 265.96 265.96 414.02 414.02 414.02 414.02 414.02 414.02 414.02 414.02 414.02<br />

Variable Charges Rs/kWh 0.3087 0.3087 0.3087 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590<br />

Revenue invoices<br />

Fixed Charges Mln. Rs. 1,714 1,714 1,714 2,668 2,668 2,668 2,668 2,668 2,668 2,668 2,668 2,668 29,153<br />

Variable Charges Mln. Rs. 1202 1,202 1254 1,254 1266 1,266 124 146 62 30 90 84 92 168 178 4695 4,695<br />

Total Billing Mln. Rs. 2,916 2,968 2,979 2,792 2,814 2,730 2,698 2,758 2,752 2,760 2,836 2,846 33,848<br />

Payments required<br />

Employees Salaries & Benefit Mln. Rs. 248 248 248 248 248 266 266 266 266 266 266 266 3,102<br />

Administration Costs Mln. Rs. 80 80 80 80 80 80 80 80 80 80 80 80 960<br />

Plant Maintenance Cost Mln. Rs. 100 100 100 925 838 89 110 110 110 120 120 122 2,844<br />

Net Hydel Pr<strong>of</strong>it to KPK Mln. Rs. 500 500 500 500 500 500 500 500 500 500 500 500 6,000<br />

Water Usage Charges to AJK Mln. Rs. 71 72 64 62 53 39 4 73 42 70 88 82 720<br />

Sukuk Rental 480 - - 516 - - 488 - - 514 - - 1,998<br />

Supplier's Credit payment Mln. Rs. - 794 - - - - 781 - - - - - 1,575<br />

total Mln. Rs. 1,479 1,794 992 2,331 1,719 974 2,229 1,029 998 1,550 1,054 1,050 17,199<br />

Debt servicing <strong>of</strong> GoP loans Mln. Rs. - - - - - 5,915 - - - - - 5,915 11,830<br />

Surplus for Power dev projects Mln. Rs. 1,437 1,174 1,987 461 1,095 (4,159) 469 1,729 1,754 1,210 1,782 (4,119) 4,819<br />

KAPCO dividends / misc income Mln. Rs. 45 1106 1,106 25 804 50 2030 2,030<br />

Surplus for Power dev projects Total 1,437 1,174 2,032 461 2,200 (4,159) 494 1,729 2,558 1,210 1,782 (4,069) 6,849<br />

6 October 2010 18


PSDP FY 2010-11<br />

Khan Khwar Allai Khwar Duber Khwar Jinnah Jabban Rehab DBDP Thakot Bridge Golan Gol Keyal Khwar F.studies Total<br />

Land Acquisition & settlement 1 10 12,776 12,787<br />

Contract Civil works 351 956 2,747 581 286 200 203 1,238 - - 6,563<br />

Contract E&M works 268 392 552 1 345 1 - 350 - - 1,909<br />

Consultancy & Engineering 36 34 41 100 25 293 45 100 427 1,101<br />

Interest during Construction 50 400 400 80 731 30 1,691<br />

Custom duties, Taxes & Insurance 20 50 30 50 30 10 190<br />

Project Management Expenses 92 116 148 68 33 999 0 42 250 150 1,898<br />

Total<br />

818 1,948 3,928 800 800 15,000 203 1,715 350 577 26,139<br />

6 October 2010 19


Hydel Development Financing Plan<br />

FY 2010-11<br />

11 [Mln.Rs]<br />

Funds required for PSDP 26,139<br />

Foreign relent loans 6,267<br />

GoP Cash Development loans 5,000<br />

Tariff revenue surplus 6,849<br />

Resources committed 18,116116<br />

Sukuk Bond/ TFC 8,023<br />

6 October 2010 20


Projected Capital Investments<br />

Figure are in million Rupees<br />

Name <strong>of</strong> Project 2010-11 (*) 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20<br />

On-going projects 11,139 9,856 10,540 9,567 6,850 6,960 5,870 - - -<br />

Diamer Basha 15,000 4,300 75,250 93,998 104,920 123,582 133,988 116,960 92,106 90,214<br />

Kurram Tangi Dam - 9,890 10,320 13,330 10,750 - - - - -<br />

Tarbela 4th Ext - - - 25,800 34,400400<br />

- - - - -<br />

Munda Dam - 10,320 10,320 18,060 23,220 23,220 16,512 11,868 - -<br />

Dasu HPP - - - 44,720 55,900 78,260 89,440 89,440 78,260 67,080<br />

Bunji HPP - - - - - 41,280 51,600 72,240 82,560 82,560<br />

Total 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />

(*) Budget provisions in Annual PSDP.<br />

6 October 2010 21


Financing Plans for Capital Investment<br />

• Get enhancing debt ratio from 60% to 80% for foreign loans,<br />

• Get enhancing GoP Cash Development loans size for Hydel<br />

projects,<br />

• Requesting NEPRA to revise tariff fixation method and fix it at<br />

the level to meet with debt servicing as well as projects self<br />

financing needs so that enough funds are internally available,<br />

• Creating special purpose vehicles (SPV) for mega projects and<br />

inviting private investments in these projects,<br />

• Tapping local and foreign capital markets to raise reasonable<br />

funding in the shape <strong>of</strong> issuing Sukuk, Bonds and TFCs etc<br />

regularly l by securitizing iii <strong>WAPDA</strong> assets.<br />

• Recovery <strong>of</strong> overdue receivables from NTDC/CPPA.<br />

• Deferring the project initiations by prioritization.<br />

6 October 2010 22


<strong>WAPDA</strong> Hydroelectric<br />

Funding Mechanism<br />

Figure are in million Rupees<br />

Financial Year 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20<br />

Capital Investment 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />

World Bank self financing Model<br />

loans- 60% <strong>of</strong> Capex 15,683 20,620 63,858 123,285 141,624 163,981 178,446 174,305 151,756 143,912<br />

Self financing -40% <strong>of</strong> Capex 10,456 13,746 42,572 82,190 94,416 109,321 118,964 116,203 101,170 95,942<br />

Total 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />

Change in Tariff fixing method<br />

Revenue surplus - WB Model 10,456 13,746 42,572 82,190 94,416 109,321 118,964 116,203 101,170 95,942<br />

Revenue surplus - existing tariff 5,581 (2,636) 6,772 6,876 6,691 6,525 7,645 14,193 13,784 13,149<br />

Self financing gap 4,875 16,382 35,800 75,314 87,725 102,796 111,319 102,010 87,386 82,793<br />

Effect on tariff<br />

Net Electrical Output [GWh] 29,337 30,693 30,710 31,400 32,320 35,264 37,532 37,532 37,532<br />

Avg. sale rate at existing tariff [Rs/kWh] 124 1.24 118 1.18 116 1.16 111 1.11 105 1.05 093 0.93 085 0.85 083 0.83 080 0.80<br />

Avg. sale rate at WB model [Rs/kWh] 1.80 2.35 3.62 3.90 4.23 4.09 3.57 3.15 3.01<br />

6 October 2010 23


<strong>WAPDA</strong> Hydroelectric<br />

Funding Mechanism<br />

Figure are in million Rupees<br />

Financial Year 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20<br />

Capital Investment 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />

Projected financing<br />

loans- 60% <strong>of</strong> Capex 5,716 20,620 63,858 123,285 141,624 163,981 178,446 174,305 151,756 143,912<br />

GoP CDL for Land 5,000 5,000 25,000 18,000 7,000 6,000 5,000 5,000 5,000 5,000<br />

Sukuk Bonds,IPO 10,000 5,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000<br />

Tariff surplus 5,423 3,746 7,572 54,190 77,416 93,321 103,964 101,203 86,170 80,942<br />

Total 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />

6 October 2010 24


Thank You<br />

6 October 2010 25