<strong>Presentation</strong> on<br />
Hydel Business Plans<br />
6 October 2010 1
<strong>Presentation</strong> scheme<br />
• EXISTING HYDEL FACILITIES<br />
• REHABILITATION PLANS<br />
• EXPANSION SO PLANS<br />
• FINANCIAL PLANS<br />
6 October 2010 2
EXISTING HYDEL FACILITIES<br />
6 October 2010 3
EXISTING <strong>WAPDA</strong> HYDEL POWER STATIONS (6444.0 MW)<br />
STATION<br />
TARBELA<br />
GHAZI<br />
BAROTHA<br />
WATER WAY UNITS CAPACITY OF INSTALLED DATE OF<br />
(River/Canal) NO. EACH UNIT CAPACITY COMMISSIONING<br />
(MW) (MW)<br />
INDUS 1~4 175 700 Jul. 1977<br />
5~8<br />
(Reservoir) 175 700 Dec. 1982<br />
9~10 175 350 Apr. 1985<br />
11~14 432 1728 Feb. 1993<br />
TOTAL 3478<br />
INDUS 1 290 290 Jul. 2003<br />
(D/S Tarbela) 2 290 290 Aug. 2003<br />
3 290 290 Oct. 2003<br />
4 290 290 Dec. 2003<br />
5 290 290 Mar. 2004<br />
TOTAL 1450<br />
MANGLA<br />
WARSAK<br />
CHASHMA<br />
JHELUM<br />
1~4<br />
100 400 1967/1969<br />
(Reservoir) 5~6 100 200 Mar. 1974<br />
7~8<br />
100 200 1981<br />
9~10 100 200 1993-1994<br />
TOTAL 1000<br />
KABUL 1~4 40 160 Jul. 1960<br />
(Reservoir) 5~6 41.48 82.96 Mar. 1981<br />
TOTAL 242.96<br />
INDUS 1 23 23 May. 2001<br />
(Chashma 2 23 23 Apr. 2001<br />
Barrage) 3 23 23 Apr. 2001<br />
4 23 23 Mar. 2001<br />
5 23 23 Mar. 2001<br />
6 23 23 Feb. 2001<br />
7 23 23 Dec. 2000<br />
8 23 23 Dec. 2000<br />
TOTAL 184<br />
6 October 2010 4
EXISTING <strong>WAPDA</strong> SMALL HYDEL POWER STATIONS<br />
WATER WAY UNITS CAPACITY OF INSTALLED DATE OF<br />
STATION<br />
(River/Canal) NO. EACH UNIT CAPACITY COMMISSIONING<br />
(MW) (MW)<br />
RASUL<br />
UJC* 1~2 11 22 Jul. 1952<br />
DARGAI<br />
NANDIPUR<br />
SHADIWAL<br />
CHICHOKI<br />
K/GARHI<br />
RENALA<br />
CHITRAL<br />
Swat** 1~4 5 20 Dec. 1952<br />
UCC*** 1~3 4.6 13.8 Mar. 1963<br />
UJC* 1~2 6.75 13.5 Jan. 1961<br />
UCC*** 1~3 44 4.4 13.2 Aug. 1959<br />
KUCHKOT**** 1~4 1 4 Feb. 1958<br />
LBDC***** 1~5 0.22 1.1 Mar. 1925<br />
LUDKO 1~2 0.3 1.0 1975<br />
3~4 0.2 1982<br />
Total<br />
6,444<br />
* : Upper Jhelum Canal from River Jhelum<br />
** : Swat Canal from River Swat<br />
*** : Upper Chenab Canal from River Chenab<br />
**** : Kachkot Canal from River Kurram<br />
***** : Lower Bari Doab Canal from Balloki Headworks on River Ravi<br />
NOTE: The Jabban Hydel Pow er Station has been de-commissioned due to fire incident on 12-11-2006 and its capacit<br />
been included in total installed capacity <strong>of</strong> <strong>WAPDA</strong> Hydro Electric.<br />
6 October 2010 5
REHABILITATION PLANS<br />
6 October 2010 6
REHABILITATION OF HYDEL POWER STATIONS<br />
Aging E&M equipment <strong>of</strong> Hydel Power Plants are being<br />
rehabilitated. Rehabilitation / Up‐gradation required for the<br />
following power plants;<br />
• Jabban Rehabilitation Project (Unit 1‐4, each <strong>of</strong> 5.5 MW) Approved<br />
Cost Rs. 3734 Million. (Implementation underway)<br />
• Mangla Hydel Power Station (Unit 1‐10, each <strong>of</strong> 100 MW).<br />
Estimated Cost – US$ 500 Million. (Consultants approved)<br />
• Warsak Hydel Power station (Unit 1‐4, each <strong>of</strong> 40 MW).<br />
Estimated Cost – US$ 300 Million. (Consultant being approved)<br />
• Tarbela Hydel Power Station (Unit 1,3&4, each <strong>of</strong> 175 MW<br />
Estimated Cost – US$ 16.5 Million. (Implementation <strong>of</strong><br />
rehabilitation is underway)<br />
6 October 2010 7
EXPANSION PLANS<br />
6 October 2010 8
PAKISTAN’S HYDROPOWER POTENTIAL<br />
(RIVERWISE SUMMARY)<br />
S# River/ Tributary Power (MW)<br />
1. Indus River 37780<br />
2. Tributaries <strong>of</strong> Indus (Northern Areas) & NWFP 6006<br />
Sub Total (1+2) 43786<br />
3. Jhelum River 3143<br />
4. Kunhar River 1435<br />
5. Neelum River & its Tributaries 1844<br />
6. Poonch River 397<br />
Sub Total (3+4+5+6) 6819<br />
7. Swat River & its Tributaries 2371<br />
8. Chitral River & its Tributaries 2282<br />
Sub Total (7+8) 4653<br />
9. Schemes below 50 MW on Tributaries 1055<br />
10. Schemes below 50 MW on Canals 408<br />
Sub Total (9+10) 1463<br />
11. Small & Medium Dams 52<br />
TOTAL 56773<br />
6 October 2010 9<br />
9
HYDROPOWER PROJECTS UNDER IMPLEMENTATION<br />
PC-I Cost Gen Capty<br />
Progress/<br />
Sr # Name <strong>of</strong> Project Location (Rs. Billion) (MW) Donors/ lenders Completion<br />
Addl 644<br />
GOP funding/<br />
Substantially<br />
1 Mangla Dam Raising Mirpur, AJK 62.558 GWh <strong>WAPDA</strong> bonds completed<br />
GOP funding/ Tariff<br />
2 Gomal Zam Dam FATA 12.829 17.4 financing 59%/ (Jan 2011)<br />
3 Satpara Dam Gilgit Baltistan 4.397 15.8 GOP funding 87% (Oct 2010)<br />
4 Khan Khwar Besham, KPK<br />
IDB/ <strong>WAPDA</strong> Bond,<br />
5.363 72.0 Tariff financing 94% (Oct/2010)<br />
IDB/ <strong>WAPDA</strong> Bond,<br />
5 Duber Khwar Kohistan, KPK 9.754 130.0 Tariff financing 74%(Jan/2011)<br />
6 Allai Khwar Battagram, KPK<br />
IDB/ <strong>WAPDA</strong> Bond,<br />
8.578 121.0 Tariff financing 51% (10/2011)<br />
7 Jinnah Jinnah Barrage<br />
Chinese Supplier's<br />
7.680 96.0 Credit/ Tariff Fin 94% (6/2011)<br />
8 Jabban Rehabilitation Malakand KPK 3.734 22.0 afd France/ Tariff Fin 5% (June 2013)<br />
Surcharge/ Middle<br />
9 Neelum Jhelum AJK 130.000000 969.0 East donors/ CEXIM 13% (10/2016)<br />
Total 241.159 1443.2<br />
6 October 2010 10
Future Hydel Projects to be undertaken<br />
Sr # Name <strong>of</strong> Project River Location<br />
Capacity<br />
(MW)<br />
Annual<br />
NEO<br />
(GWh)<br />
Estimated Cost (US$ M)<br />
LCC FCC Total<br />
Completion<br />
period<br />
1 Diamer Basha Dam Indus Chilas GB 4,500 18,000 7,266.4 3,911.8 11,178.2 2010-20<br />
2 Tarbela 4th Extension Indus Tarbela, KPK 960 1,600 - 700.0 700.0 2011-15<br />
3 Kurram Tangi Kurram North Waziristan 83 350 148.0 67.1 215.1 2010-14<br />
4 Golan Gol Mastuj Chitral, KPK 106 436 55.0 33.0 87.9 2010-1414<br />
5 Keyal Khwar Indus Kohistan KPK 122 479 83.0 97.0 180.0 2012-16<br />
6 Phandar Ghizar Gilgit Gg Baltistan sa 80 350 40.0 00 30.0 0 70.0 00 2011-15<br />
7 Munda Swat KPK 740 2,400 537.0 612.0 1,149.0 2011-17<br />
8 Dasu Indus Gilgit Baltistan 4,000 21,215 4,118.0 4,668.0 8,786.0 2012-20<br />
9 Bunji Indus Gilgit Baltistan 5,400 20,750 7,905.0 4,237.0 12,142.0 2015-24<br />
6 October 2010 11
FINANCIAL PLANS<br />
6 October 2010 12
Income statement<br />
Unaudited Audited<br />
[Thous.Rs]<br />
For the year ended on June 30 2010 2009<br />
Sales 29,092,610 29,013,170<br />
Cost <strong>of</strong> fElectricity i 9,151,587 587 9,091,051<br />
051<br />
Gross pr<strong>of</strong>it 19,941,023 19,922,119<br />
Operating Expenses 501,728 1,119,174<br />
Operating Pr<strong>of</strong>it 19,439,295 18,802,945<br />
Other Income 4,064,259 3,111,951<br />
Financial Cost 13,161,880 6,120,792<br />
Net pr<strong>of</strong>it for the year 10,341,674 15,794,104<br />
Less: NHP paid to Kyber PK 6,000,000 6,000,000<br />
Provision for Capital Reserves 4,341,674 9,794,104<br />
6 October 2010 13
Cash Flow Statement<br />
[Mln.Rs]<br />
[Mln.Rs]<br />
Receipts 2009-10 2008-09<br />
Receipts for power sale 18,948 20,063<br />
Foreign loan withdrawls 2,351 1,558<br />
GoP Cash Dev loans 1,373 87<br />
Bridge Financing loans - 2,045<br />
Dividends & misc income 2,609 2,046<br />
Disbursements<br />
Total receipts 25,281 25,799<br />
O&M 3,924 2,731<br />
Debt servicing 2,190 10,479<br />
NHP/WUC 7,455 4,916<br />
Hydel power development 8779 8,779 5,907<br />
Misc payments 1,675 5,620<br />
Total disbursements 24,023 29,653<br />
Incr / (decr) in cash balance 1,258 (3,854)<br />
6 October 2010 14
Balance Sheet<br />
(Thous - Rs.)<br />
2010 2009<br />
ASSETS Unaudited Audited<br />
NON - CURRENT ASSETS<br />
Property Plant & Equipments 111,197,509 , 114,545,887<br />
,<br />
Capital work-in-progress 45,922,819 27,280,839<br />
157,120,328 141,826,726<br />
Long Term Investments 184,298,081 184,298,081<br />
Investment in Associates 4,053,363 363 4053363 4,053,363<br />
Investment in Subsidiaries 1,542,826 1,542,826<br />
Notes Receivables 18,561,183 18,535,638<br />
Long Term Advances, Deposits 241,525 200,143<br />
365,817,305 350,456,777<br />
CURRENT ASSETS<br />
Stores, Spares & Loose Tools 1,422,760 1,441,536<br />
Trade Debtors - CPPA 111,316,430 104,208,132<br />
Advances and Other Receivables 30,967,281 64,882,410<br />
Short term investmenst 261,000 271,000<br />
Cash & Bank Balances 2,699,903 772,191<br />
146,667,374 171,575,269<br />
TOTAL ASSETS 512,484,679 522,032,046<br />
6 October 2010 15
Balance Sheet<br />
(Thous - Rs.)<br />
2010 2009<br />
EQUITY AND LIABILITIES Unaudited Audited<br />
Share Capital 9,522,000 9,522,000<br />
Capital Reserves for GoP investment in 184,298,080 184,298,080<br />
Capital Reserves for development projects 172,970,160 168,628,558<br />
366,790,240 362,448,638<br />
Non - Current Liabilities<br />
Long Term Loans 56,181,958 49,196,251<br />
Grants 1,593,391 1,593,391<br />
Liability Against Assets Subject to Finance 8,000,000 8,000,000<br />
Deferred liabilities 2,530,869 1,239,890<br />
68,306,218 60,029,532<br />
Current Liabilities<br />
Current Maturity <strong>of</strong> Loans 6,127,812 4,765,631<br />
Accrued Liabilities 1,221,025 1,285,883<br />
Short Term Borrowings 8,409,163 47,162,908<br />
Short Term Liabilities 46,564,021 34,263,371<br />
Other Payables 15,066,200 12,076,083<br />
77,388,221 99,553,876<br />
TOTAL EQUITY & LIABILITIES 512,484,679 522,032,046<br />
6 October 2010 16
<strong>WAPDA</strong> Hydroelectric<br />
NEPRA determined Revenue Requirement for FY 2009-10<br />
Sr.No.<br />
Hydel Power<br />
Station<br />
Installed<br />
Capacity<br />
Net<br />
Electrical<br />
Output<br />
Regulatory<br />
assets base<br />
Return on<br />
Investment<br />
O&M Depr WUC<br />
Cost at<br />
Bus Bar<br />
Cost at<br />
Bus Bar<br />
MW GWh Mln. Rs. Mln. Rs. Mln. Rs. Mln. Rs. Mln. Rs. Mln. Rs. Rs/kWh<br />
1 Tarbela 3,478 14,650 8,263 1,133 1,281 2,022 4,436 0.3028<br />
2 Ghazi Brotha 1,450 6,200 79,070 10,845 549 2,127 13,521 2.1808<br />
3 Mangla 1,000 5,400 8,637 1,185 1,251 582 720 3,738 0.6921<br />
4 Warsak 243 910 1,102 151 386 60 597 0.6558<br />
5 Chashma 184 1,062 14,563 1,997 334 598 2,929 2.7578<br />
6 Rasul 22 35 141 19 42 6 68 1.9298<br />
7 Dargai 20 155 31 4 92 1 97 0.6255<br />
8 Nandipur 14 35 13 2 50 1 52 1.4978<br />
9 Shadiwal 14 47 13 2 36 1 39 0.8242<br />
10 Chichoki 13 31 - - 36 - 36 1.1599<br />
11 Kuram Garhi 4 17 - - 19 - 19 1.0940<br />
12 Renala Khurd 1 3 14 2 12 - 14 4.7933<br />
13 Chitral 1 5 - - 27 - 27 5.4556<br />
Total 6,444 28,550 111,847 15,340 4,114 5,398 720 25,572 0.8957<br />
Capital Work in Progress 31,207 4,280 4,280<br />
Adhoc NHP to GoKPK 6,000<br />
Other Income (2,152)<br />
Total<br />
143,054 19,620 33,700 1.1804<br />
6 October 2010 17
<strong>WAPDA</strong> Hydroelectric<br />
Power Sale Billing and Settlement Plan for FY 2010-11<br />
Unit Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Total<br />
Contracted Capacity MW 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444 6,444<br />
Estimated Sale <strong>of</strong> Power Gwh 3,894 4,064 4,100 2,100 2,471 1,045 514 1,532 1,419 1,553 2,847 3,011 28,550<br />
Fixed Charges Rs./kW/M 265.96 265.96 265.96 414.02 414.02 414.02 414.02 414.02 414.02 414.02 414.02 414.02<br />
Variable Charges Rs/kWh 0.3087 0.3087 0.3087 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590 0.0590<br />
Revenue invoices<br />
Fixed Charges Mln. Rs. 1,714 1,714 1,714 2,668 2,668 2,668 2,668 2,668 2,668 2,668 2,668 2,668 29,153<br />
Variable Charges Mln. Rs. 1202 1,202 1254 1,254 1266 1,266 124 146 62 30 90 84 92 168 178 4695 4,695<br />
Total Billing Mln. Rs. 2,916 2,968 2,979 2,792 2,814 2,730 2,698 2,758 2,752 2,760 2,836 2,846 33,848<br />
Payments required<br />
Employees Salaries & Benefit Mln. Rs. 248 248 248 248 248 266 266 266 266 266 266 266 3,102<br />
Administration Costs Mln. Rs. 80 80 80 80 80 80 80 80 80 80 80 80 960<br />
Plant Maintenance Cost Mln. Rs. 100 100 100 925 838 89 110 110 110 120 120 122 2,844<br />
Net Hydel Pr<strong>of</strong>it to KPK Mln. Rs. 500 500 500 500 500 500 500 500 500 500 500 500 6,000<br />
Water Usage Charges to AJK Mln. Rs. 71 72 64 62 53 39 4 73 42 70 88 82 720<br />
Sukuk Rental 480 - - 516 - - 488 - - 514 - - 1,998<br />
Supplier's Credit payment Mln. Rs. - 794 - - - - 781 - - - - - 1,575<br />
total Mln. Rs. 1,479 1,794 992 2,331 1,719 974 2,229 1,029 998 1,550 1,054 1,050 17,199<br />
Debt servicing <strong>of</strong> GoP loans Mln. Rs. - - - - - 5,915 - - - - - 5,915 11,830<br />
Surplus for Power dev projects Mln. Rs. 1,437 1,174 1,987 461 1,095 (4,159) 469 1,729 1,754 1,210 1,782 (4,119) 4,819<br />
KAPCO dividends / misc income Mln. Rs. 45 1106 1,106 25 804 50 2030 2,030<br />
Surplus for Power dev projects Total 1,437 1,174 2,032 461 2,200 (4,159) 494 1,729 2,558 1,210 1,782 (4,069) 6,849<br />
6 October 2010 18
PSDP FY 2010-11<br />
Khan Khwar Allai Khwar Duber Khwar Jinnah Jabban Rehab DBDP Thakot Bridge Golan Gol Keyal Khwar F.studies Total<br />
Land Acquisition & settlement 1 10 12,776 12,787<br />
Contract Civil works 351 956 2,747 581 286 200 203 1,238 - - 6,563<br />
Contract E&M works 268 392 552 1 345 1 - 350 - - 1,909<br />
Consultancy & Engineering 36 34 41 100 25 293 45 100 427 1,101<br />
Interest during Construction 50 400 400 80 731 30 1,691<br />
Custom duties, Taxes & Insurance 20 50 30 50 30 10 190<br />
Project Management Expenses 92 116 148 68 33 999 0 42 250 150 1,898<br />
Total<br />
818 1,948 3,928 800 800 15,000 203 1,715 350 577 26,139<br />
6 October 2010 19
Hydel Development Financing Plan<br />
FY 2010-11<br />
11 [Mln.Rs]<br />
Funds required for PSDP 26,139<br />
Foreign relent loans 6,267<br />
GoP Cash Development loans 5,000<br />
Tariff revenue surplus 6,849<br />
Resources committed 18,116116<br />
Sukuk Bond/ TFC 8,023<br />
6 October 2010 20
Projected Capital Investments<br />
Figure are in million Rupees<br />
Name <strong>of</strong> Project 2010-11 (*) 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20<br />
On-going projects 11,139 9,856 10,540 9,567 6,850 6,960 5,870 - - -<br />
Diamer Basha 15,000 4,300 75,250 93,998 104,920 123,582 133,988 116,960 92,106 90,214<br />
Kurram Tangi Dam - 9,890 10,320 13,330 10,750 - - - - -<br />
Tarbela 4th Ext - - - 25,800 34,400400<br />
- - - - -<br />
Munda Dam - 10,320 10,320 18,060 23,220 23,220 16,512 11,868 - -<br />
Dasu HPP - - - 44,720 55,900 78,260 89,440 89,440 78,260 67,080<br />
Bunji HPP - - - - - 41,280 51,600 72,240 82,560 82,560<br />
Total 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />
(*) Budget provisions in Annual PSDP.<br />
6 October 2010 21
Financing Plans for Capital Investment<br />
• Get enhancing debt ratio from 60% to 80% for foreign loans,<br />
• Get enhancing GoP Cash Development loans size for Hydel<br />
projects,<br />
• Requesting NEPRA to revise tariff fixation method and fix it at<br />
the level to meet with debt servicing as well as projects self<br />
financing needs so that enough funds are internally available,<br />
• Creating special purpose vehicles (SPV) for mega projects and<br />
inviting private investments in these projects,<br />
• Tapping local and foreign capital markets to raise reasonable<br />
funding in the shape <strong>of</strong> issuing Sukuk, Bonds and TFCs etc<br />
regularly l by securitizing iii <strong>WAPDA</strong> assets.<br />
• Recovery <strong>of</strong> overdue receivables from NTDC/CPPA.<br />
• Deferring the project initiations by prioritization.<br />
6 October 2010 22
<strong>WAPDA</strong> Hydroelectric<br />
Funding Mechanism<br />
Figure are in million Rupees<br />
Financial Year 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20<br />
Capital Investment 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />
World Bank self financing Model<br />
loans- 60% <strong>of</strong> Capex 15,683 20,620 63,858 123,285 141,624 163,981 178,446 174,305 151,756 143,912<br />
Self financing -40% <strong>of</strong> Capex 10,456 13,746 42,572 82,190 94,416 109,321 118,964 116,203 101,170 95,942<br />
Total 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />
Change in Tariff fixing method<br />
Revenue surplus - WB Model 10,456 13,746 42,572 82,190 94,416 109,321 118,964 116,203 101,170 95,942<br />
Revenue surplus - existing tariff 5,581 (2,636) 6,772 6,876 6,691 6,525 7,645 14,193 13,784 13,149<br />
Self financing gap 4,875 16,382 35,800 75,314 87,725 102,796 111,319 102,010 87,386 82,793<br />
Effect on tariff<br />
Net Electrical Output [GWh] 29,337 30,693 30,710 31,400 32,320 35,264 37,532 37,532 37,532<br />
Avg. sale rate at existing tariff [Rs/kWh] 124 1.24 118 1.18 116 1.16 111 1.11 105 1.05 093 0.93 085 0.85 083 0.83 080 0.80<br />
Avg. sale rate at WB model [Rs/kWh] 1.80 2.35 3.62 3.90 4.23 4.09 3.57 3.15 3.01<br />
6 October 2010 23
<strong>WAPDA</strong> Hydroelectric<br />
Funding Mechanism<br />
Figure are in million Rupees<br />
Financial Year 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20<br />
Capital Investment 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />
Projected financing<br />
loans- 60% <strong>of</strong> Capex 5,716 20,620 63,858 123,285 141,624 163,981 178,446 174,305 151,756 143,912<br />
GoP CDL for Land 5,000 5,000 25,000 18,000 7,000 6,000 5,000 5,000 5,000 5,000<br />
Sukuk Bonds,IPO 10,000 5,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000<br />
Tariff surplus 5,423 3,746 7,572 54,190 77,416 93,321 103,964 101,203 86,170 80,942<br />
Total 26,139 34,366 106,430 205,475 236,040 273,302 297,410 290,508 252,926 239,854<br />
6 October 2010 24
Thank You<br />
6 October 2010 25