24.04.2014 Views

Summa Group News, May 2014

News from the Summa Group, May 2014.

News from the Summa Group, May 2014.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Summa</strong> <strong>News</strong> – <strong>May</strong> <strong>2014</strong><br />

Stroynovatsiya Wins Caucasus Highway Tender<br />

<strong>Summa</strong> <strong>Group</strong> subsidiary Stroynovatsiya has won a tender to build a new section of the<br />

M-29 Caucasus Highway in Russia, and reconstruct an existing section. Passing through<br />

the Kabardino-Balkaria territory, the project will construct a new 10km long section with<br />

two lanes in each direction.<br />

The section that will be reconstructed passes through Zalukokoazhe and Psyndakha of<br />

the Zolsky District. The reconstuction should be completed by the end of 2017. The<br />

tender, which is to the value of 3.92 billion RUB, was ordered by the North Caucasus<br />

Highway Administration.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!