1 Sh.Ved Prakash ,CE/C/I<br />
Jaipur-Ringus-Churu & Sikar-Loharu GC (320.04 km) Project<br />
Alwar-Harsauli(34.86Km) doubling<br />
Harsauli-Rewari (39.35 km) doubling<br />
Jaipur - Yard Remodeling<br />
Rewari-Jhaijar ROB in lieu <strong>of</strong> LC No. 57-B<br />
Jaipur -Ajmer- ROB in lieu <strong>of</strong> LC No.28<br />
Alwar-ROB in lieu <strong>of</strong> LC No.111-C<br />
Phulera – Broad gauge diesel locomotive shed<br />
Phulera – Re-organisation <strong>of</strong> freight train examination facility from Madar<br />
Jaipur-Setting up <strong>of</strong> NWR-Zone<br />
Other Minor Works <strong>of</strong> Jaipur Division<br />
2 Sh.A.K.Sethi , Chief Engineer /C/V<br />
Dausa-Gangapurcity (92.67Kms) NL<br />
3. Sh. S.K.Jindal , Chief Engineer /C/II<br />
ROB in lieu <strong>of</strong> LC No. 181<br />
Ahmedabad-Himmatnagar-Udaipur GC<br />
Ratlam-Dungarpur vis Banswara (176.47 Km) NL<br />
Procurement <strong>of</strong> P.way Material & fittings<br />
4. Sh Sudhir Agarwal , Chief Engineer /C/III<br />
Ajmer-Pushkar (31.40 Kms) NL<br />
Bangurgram-Ras (27.8 km) NL<br />
Keshav Ganj - Swaroopganj –Doubling (26.48 km)<br />
Guriya-Marwar (43.50 km) & Karjoda-Palanpur Doubling (5.40 km)<br />
Ajmer-Bangurgram Doubling (48.43 km)<br />
Phalodi - Bypass line<br />
Jodhpur – Yard remodeling<br />
ROB in lieu <strong>of</strong> LC No.134-B<br />
ROB in lieu <strong>of</strong> LC No.63 Mandal<br />
ROB in lieu <strong>of</strong> LC No. 5A\2<br />
ROB in lieu <strong>of</strong> LC No. C-325<br />
ROB in lieu <strong>of</strong> LC No. 63-C Nagore-Basani<br />
ROB in lieu <strong>of</strong> LC No.36-C Kuchamancity-Makarana<br />
Ajmer - Modernization <strong>of</strong> carriage workshop<br />
Ajmer - Modernization <strong>of</strong> loco workshop<br />
Bhagat Ki Kothi – Augmenting capacity<br />
Madar – Shifting <strong>of</strong> coach maintenance facility from Ajmer<br />
Other Minor works <strong>of</strong> Ajmer and Jodhpur divisions<br />
5. Sh C.L.Meena, Chief Engineer /C/IV<br />
Sriganganagar-Sarupsar (116 Km) GC<br />
Suratpura-Hanumangarh-Sriganganagar GC<br />
Ratangarh-Sardarsahar (43.50 km) MM <strong>of</strong> Sadulpur-Bikaner & Ratangarh-Degana (394.35<br />
km)
Lalgarh-Suratgarh - standard III interlocking<br />
Suratgarh- Bhatinda - standard III<br />
Rohtak-Bhiwani - Std.-III interlocking<br />
Rewari-Hissar - Std.-III interlocking<br />
Bhiwani – Byepass line for movement <strong>of</strong> traffic from Rohtak to Hissar avoiding Bhiwani<br />
ROB in lieu <strong>of</strong> LC No. 143<br />
ROB in lieu <strong>of</strong> LC no. 53-C<br />
ROB in lieu <strong>of</strong> LC No. 33<br />
ROB in lieu <strong>of</strong> LC No. 138<br />
ROB in lieu <strong>of</strong> LC No. 53 B<br />
ROB in lieu <strong>of</strong> LC No. 19-C<br />
Bikaner-ROB LC No. -139<br />
Other Minor works <strong>of</strong> Bikaner division
Construction HQ Officers & staff<br />
S.No.<br />
Officer & Works assignments<br />
1 Secretary to CAO(C)<br />
Preparation <strong>of</strong> survey reports in consultation with concerned SAG <strong>of</strong>ficer, after receipt <strong>of</strong><br />
field survey estimate & details.<br />
RTI Nodal Officers for Construction Organization.<br />
Note:-<br />
(i) Nodal Officer will submit the information to PIO (RTI) in consultation with concerned<br />
SAG <strong>of</strong>ficer after receipt <strong>of</strong> the information directly from the concerned HQ <strong>of</strong>ficer/<br />
Field <strong>of</strong>ficer. Nodal Officer shall also pin point each and every asked information’s<br />
concerning to whom.<br />
(ii) Ajay Sharma Head Typist will work under SPO/C & Secy for RTI file work.<br />
Training programme for <strong>of</strong>ficers and staff.<br />
Keeping updated Bio data <strong>of</strong> <strong>of</strong>ficers & supervisor<br />
Allotment <strong>of</strong> ORH (Const)<br />
Construction Library<br />
Surprise Inspection <strong>of</strong> various on going works<br />
Any other work assigned by CAO/C/JP<br />
2 Dy Chief Engineer /C/P&D<br />
Assisted by<br />
A A.K.Sharma AEN/C/Planning (In charge <strong>of</strong> General & Budget Section)<br />
(a) General & Planning Section<br />
Roop Chand,O.S.-I (In charge <strong>of</strong> General & planning Section), Pyara Lal, H .C. Sardar<br />
Singh, O.S.-II ,Kishan Sen OS(T)<br />
(i) PCDO /MCDO/ progress report (other then works contracts) <strong>of</strong> on going works <strong>of</strong> CAO(C)<br />
,which are sent to GM/<strong>Railway</strong> Board/other <strong>of</strong>ficial.<br />
(ii) Reply <strong>of</strong> Parliament Questions & CA-III Reference<br />
(iii) Presentations <strong>of</strong> <strong>construction</strong> Deptt<br />
(iv) Compliance <strong>of</strong> Inspection Note/Safety drives<br />
(v) P&T telephone bills <strong>of</strong> CAO/C/ HQ <strong>of</strong>fice.<br />
(vi) Dealing Cash imprest proposals <strong>of</strong> HQ <strong>of</strong>ficials & Field <strong>of</strong>ficials<br />
and upkeep <strong>of</strong> Cash Imprest <strong>of</strong> CAO/C & Dy CE/C/P&D<br />
(vii) Arrangement <strong>of</strong> Air tickets <strong>of</strong> <strong>of</strong>ficers<br />
(viii) Circulation <strong>of</strong> Policy circular including SOP other then works, store, track & establishment<br />
(ix) Misc. correspondence <strong>of</strong> General & other works assigned by Dy CE/C/P&D<br />
(b)<br />
(c)<br />
Dispatch Section<br />
Nand Kishore, OS-II, Jitendera Sharma, Sr .Clerk<br />
Receipt & dispatch work<br />
Budget Section<br />
Rohitas Meena, Sr. SO A/Cs
Budget statements for <strong>construction</strong> organization, Distribution <strong>of</strong> budget grants, budgetary<br />
reviews, arrangement <strong>of</strong> funds and all other related matters including re-appropriation etc.<br />
B<br />
(a)<br />
(b)<br />
C<br />
Avtar Singh XEN/C/Design/II/JP<br />
Design section (CE/C/I&IV)<br />
Alok Vyas SE/Drg<br />
Design <strong>of</strong> all the structures <strong>of</strong> CE/C/I &CE/C/IV/JP<br />
Drawing section (CE/C/I&IV)<br />
Binod Khugsal, SSE/Drg , Balbir Singh SSE/Drg & DD Yadav SE/C/Drg<br />
Finalization <strong>of</strong> design and drawings <strong>of</strong> all the civil Engg. Works, Yard plans and L-sections<br />
under CE/C/I&IV/JP.<br />
Technical inspection <strong>of</strong> ongoing projects including ROB /RUB.<br />
Sh G.S.Chauhan AEN/C/D/JP<br />
IT and FTP related matters<br />
D Shiv Charan Bairwa (Rajbhasa Officer )<br />
Rajbhasa Section<br />
(a) Smt Gambhir Rathod OS/I/Rajbhasa<br />
Rajbhasa work <strong>of</strong> Construction Organization.<br />
3 Dy Chief Engineer /C/W<br />
(a)<br />
Assisted by XEN/C/W (Sh. M.L.Meena), Ch. OS/W/I (Sh. S.K.Sharma), OS (Sh.<br />
S.K.Dutta), Ch. O.S (Sh. Suraj Singh Yadav), OS (Sh. R.K.Meena), Typist (Sh. Ashok Sen).<br />
Works Section<br />
(i) Works section policy matter including circulation policy circulars <strong>of</strong> <strong>construction</strong><br />
(ii) Matters related to works tenders and contract including sale/opening <strong>of</strong> works tenders at JP<br />
HQ <strong>of</strong>fice.<br />
(iii) Progress report <strong>of</strong> works contracts<br />
(iv) Land acquisition matters<br />
(v) Arbitration matter pertains to <strong>construction</strong><br />
(vi) Audit objections special letters , draft para, provisional para, audit para, DATN pertaining to<br />
<strong>construction</strong><br />
(vii) Enlistment /registration <strong>of</strong> contractors.<br />
4 Dy Chief Engineer /C/HQ<br />
(a)<br />
ROB/RUB Cell<br />
Assisted by G.L.Pandar XEN/C/HQ Sh.Rajendra Singh Ch OS& (Smt. Sapna Mathur)<br />
(i) Sanction <strong>of</strong> Detailed Estimate <strong>of</strong> ROBs<br />
(ii) Approval <strong>of</strong> design <strong>of</strong> ROBs being constructed by IRCON<br />
(iii) Compiling weekly review position ROB for GM<br />
(iv) DFCCIL works(ROB,LHS and other Civil & P.Way works)<br />
(b) Any other works/responsibility assigned by CAO/C<br />
(b)<br />
Estimate section<br />
V K Gupta SSE/Drg & M. Singh, JE/C/W<br />
Processing sanction <strong>of</strong> detailed estimate/material modification/revised estimates/completion
eports/Project Report.<br />
Jaipur & Ajmer World class station project and Jaipur Metro Project.<br />
5 Dy Chief Engineer /C/TP<br />
Assisted by XEN/TS-I &AEN/TS- II<br />
(a) Track cell<br />
Ram Narayan OS-, Sashi Kala Rao, OS-I<br />
H.S.Nagpal, OS-II, Ram Kripal, OS-II,Bina Rudhani Typiest<br />
Track Policy matter<br />
Compilation & issue <strong>of</strong> instructions/circulars regarding track works<br />
Planning, procurement, distribution & auction <strong>of</strong> P.Way materials.<br />
Demurrage and warfage; Write <strong>of</strong>f <strong>of</strong> P.Way material.<br />
Deployment <strong>of</strong> Track Machine.<br />
Stock Sheets /Audit /Drafts Paras pertaining to P Way material.<br />
Note: - Dy.CE/C/TP shall also do surprise inspection <strong>of</strong> store <strong>of</strong> field units.<br />
(b) Legal Cell<br />
Bhanwar Lal Meena, CLA & Bhawan Singh, Head Clerk<br />
Court cases ,Payment <strong>of</strong> the advocates etc.<br />
6 Dy Chief Engineer /C/Design<br />
Assisted by XEN/C/D/I<br />
(a) Design Section<br />
R.K.Sharma, SE/C/D, Binod Khugsal, SSE/Drg, D.D.Yadav, SE/C/D, Balvir Singh,<br />
SE/C/D .<br />
Finalization <strong>of</strong> design and drawings <strong>of</strong> all the civil Engg. Works including Yard plans and L-<br />
sections <strong>of</strong> CE/C/II&III/JP under Dy CE/C/D and CEC/I&IV under Dy CE/C/P&D<br />
CRS sanctions and CRS inspection notes.<br />
Computer cell – Installation & Maintenance <strong>of</strong> work station capable <strong>of</strong> handling design,<br />
drawing & estimating. Maintenance <strong>of</strong> digitized records/ reference drawings/codes and<br />
manuals.<br />
(b) Store section<br />
Tarun Kumar, OS-I, , Preetam Singh, Head Clerk<br />
General up keep <strong>of</strong> <strong>of</strong>fice equipments<br />
Indent <strong>of</strong> stationery items <strong>of</strong> CAO/C <strong>of</strong>fice.<br />
Indent & Maintenance <strong>of</strong> Printer, Computer, Furniture, Xerox Machine and other Non-stock<br />
items. House keeping items <strong>of</strong> Store<br />
Maintenance & DS-8 <strong>of</strong> T&P, Machine & Motor vehicle<br />
7 Senior Personnel Officer /C (In charge <strong>of</strong> Establishment Section)<br />
(a) Establishment Section<br />
R.G.Yadav, OS-I, Y.R.Yadav, OS-II<br />
,Rajendra Kumar, HC, Ramji Lal, Sr. Clerk, Ramchand, Clerk`<br />
In charge <strong>of</strong> <strong>of</strong>fice establishment <strong>of</strong> CAO/C/ Office.<br />
CR <strong>of</strong> non Gazetted staff<br />
DAR Gazetted and non Gazetted<br />
Transfer and Promotion <strong>of</strong> Gazetted & Non Gazetted staff.<br />
Posting <strong>of</strong> class-III & IV staff<br />
Union items, House keeping items <strong>of</strong> Establishment<br />
Seminar, training etc.<br />
Pay sheet work<br />
Policy matter <strong>of</strong> Establishment<br />
Quarter dealing <strong>of</strong> Construction pool<br />
Misc. establishment correspondence.<br />
Attendance register will be closed at specified time by OS/I & put up to SPO/C.In absence <strong>of</strong>
SPO/C it will be put up to Dy CE/C/P&D.<br />
FIELD DY CHIEF ENGINEERS OF CONST DEPTT<br />
(a) Chief Engineer /Construction /I/ UNIT<br />
S.No. Officer & Works assignments<br />
1 Dy Chief Engineer/C/II/JP<br />
Phulera – Broad gauge diesel locomotive shed<br />
Phulera – Re-organization <strong>of</strong> freight train examination facility from Madar.<br />
Jaipur – Yard Remodeling<br />
Jaipur –Ajmer- ROB in lieu <strong>of</strong> LC No.28<br />
RUB at Military Area and Ajmer Puliya (Deposit Work)<br />
Résidual Works <strong>of</strong> Jaipur-Phulera and Jaipur-Dausa Doublings.<br />
Shifting <strong>of</strong> station building at Kishangarh in connection with DFCCIL Work.<br />
2 Dy Chief Engineer /C/III/JP<br />
Harsauli-Rewari (39.35 km) doubling<br />
Residual works <strong>of</strong> Alwar-Harsauli (34.86Km) doubling<br />
Rewari-Jhaijar ROB in lieu <strong>of</strong> LC No. 57-B<br />
Alwar-ROB in lieu <strong>of</strong> LC No.111-C<br />
Alwar-ROB in lieu <strong>of</strong> LC No.117-C (Deposit Work )<br />
Residual Works <strong>of</strong> Agra fort-Bandikui GC<br />
ROB in lieu <strong>of</strong> LC -61 (Anajmandi)<br />
Survey <strong>of</strong> AWR- Charkhi- Dadri new line<br />
Survey <strong>of</strong> RE bye Pass<br />
Jaipur-Setting up <strong>of</strong> NWR-Zone: Head Quarter <strong>of</strong>fice building residual works.<br />
Jaipur-Setting up <strong>of</strong> NWR-Zone: Officers & staff Quarter at Jagatpura.<br />
Vehicle hiring for HQ <strong>of</strong>ficers & Field <strong>of</strong>ficers at Jaipur Head quarters.<br />
Shifting <strong>of</strong> Kisangarhgarh station at new location in connection with DFCCIL.<br />
Shifting <strong>of</strong> Utility on DFC alignment in Jaipur Division.<br />
ROB /RUB at JP area (LC. No. 232 &234)<br />
Jaipur setting up <strong>of</strong> NWR None HQ <strong>of</strong>fice building residual works<br />
JP-Setting up <strong>of</strong> NWR –Zone <strong>of</strong>ficers & staff quarters at Jagatpura<br />
Vehicl for HQ <strong>of</strong>ficers & Field <strong>of</strong>ficers at Jaipu Head quartar<br />
3 Dy Chief Engineer /C/GC/JP<br />
Sīkar (incl.) – Churu (incl.) & Sikar (incl.) –Loharu (incl.) Gauge Conversion (212.61<br />
Km) part <strong>of</strong> Jaipur-Ringus-Churu & Sikar-Loharu GC (320.04 km) Project.<br />
(b) Chief Engineer /Construction /II/ UNIT<br />
1 Dy Chief Engineer /C/DO<br />
Dausa-Gangapurcity Newline<br />
ROB in lieu <strong>of</strong> LC No.181 at Dausa<br />
2 Dy Chief Engineer /C/UDZ<br />
Udaipur-Himmatnagar Gauge Conversion<br />
Residual works <strong>of</strong> Mavli-Nathdwara GC.
3 Dy Chief Engineer /C/DNRP<br />
Dungarpur-Ratlam via Banswara New BG line from Km.00 to Km.88.00 Km.<br />
4 Dy Chief Engineer /C/Banswara,<br />
Dungarpur-Ratlam via Banswara New BG line from Km.88.00 to 176.47 .<br />
(c) Chief Engineer /Construction /III/ UNIT<br />
1 Dy Chief Engineer /C/I/AII<br />
(i) Ajmer -Pushkar Line (31.40 Km)<br />
(ii) Bangurgram-Ras New line (27.8 Km)<br />
(iii) Ajmer -Bangurgram Doubling (48.43 Km)<br />
(iv) Bangurgram –Guriya Doubling (47 Km)<br />
(v) Ajmer –Modernization <strong>of</strong> carriage works shop<br />
(vi) Ajmer –Modernization <strong>of</strong> loco works shop<br />
(vii) Madar-Shifting <strong>of</strong> coach maintenance facilities from Ajmer<br />
(viii) Shifting <strong>of</strong> utilities in connection with DFC work between Ajmer –Guriya<br />
(ix) LHS works between Ajmer –Guriya &<br />
(x) Other minor work <strong>of</strong> Ajmer Division<br />
2 Dy Chief Engineer /C/II/AII<br />
(i) Keshvganj –Swaroopganj –doubling (26.48 Km), ,<br />
(ii) Guriya –Marwar (43.50 Km.)doubling<br />
(iii) Marwar-Rani (54.5 Km) doubling<br />
(iv) Shifting <strong>of</strong> utilities in connection with DFC work bet.Guriya –Palanpur section<br />
(v) LHS works bet.Guriya-Palanpur sect ,.<br />
(vi) ROB in lieu <strong>of</strong> LC No.81 at Phalna<br />
3 Dy Chief Engineer /C/JU<br />
(i) JU-Yard remodeling<br />
(ii) RUB in lieu <strong>of</strong> LC No.C-325<br />
(iii) ROB in lieu <strong>of</strong> LC no.21 & 293<br />
(iv) Balance works <strong>of</strong> ROB in lieu <strong>of</strong> LC no.63-C&36-C<br />
(v) Bhagat ki kothi Diesel shed works,<br />
(vi) Marrana –Bidiyad track track diversion<br />
(vii) LHS in lieu <strong>of</strong> lCs <strong>of</strong> JU Divn.<br />
(viii) Other minor works <strong>of</strong> JU Div.
(d) Chief Engineer /Construction /IV/ UNIT<br />
1 Dy Chief Engineer /C/I/BKN<br />
(i) Ratangarh-Sardarshahar GC (47.54 Km)<br />
(ii) Residual works<strong>of</strong> Bikaner- Ratangarh-Sadulpur GC & Kolayat-Phalodi new BG line<br />
(iii) Bikaner X-ing stations (02 nos.)<br />
(iv) BKN yard remodeling<br />
(v) ROB at LC 138<br />
(vi) Deposit work Sudharna &Jharli<br />
(vii) Rewari-Hissar Std.III<br />
(viii) RE-HSR ROB at LC 19-C<br />
2 Dy Chief Engineer /C/II/BKN<br />
(i) Sriganganagar-Sarupsar GC<br />
(ii) Diplana (excl) –Suratpura (incl) GC<br />
(iii) Rohtak-Bhiwani Std-III<br />
(iv) ROB at Bhiwani on LC No. 53C & 53B<br />
(v) Bhiwani Byepass<br />
3 Dy Chief Engineer /C/HMH<br />
(i) Sriganganagar-Hanumangarh-Diplana GC<br />
(ii) Residual works <strong>of</strong> Rewari-Sadulpur-Hissar GC<br />
(iii) Residual works <strong>of</strong> Sirsa-ROB at LC no.143 ,RE-SDLP ROB at LC no.100 & RE-HSR<br />
ROB at LC at no.33<br />
(iv) Residual works Lalgarh-Suratgarh –Std III (13 Stations)<br />
(e)Chief Engineer /Construction /V/ UNIT<br />
4 Dy Chief Engineer /C/LHS/JP<br />
(a)(i) LHS works: He will coordinae the following works in HQ<br />
(ii) Site Survey<br />
(iii) Sanction <strong>of</strong> details<br />
(iv) Approval <strong>of</strong> GAD<br />
(v) Consent for closure <strong>of</strong> LC from Stat Gov.<br />
(vi) Tendering and planning <strong>of</strong> execution at HQ level<br />
(vii) C0-ordination with operating and S&T Departments regarding traffic blocks<br />
(viii) Compiling weekly review position for GM<br />
(b) He will lookafter the work <strong>of</strong> DO-GGC New line<br />
(c) Any other works/responsibility assigned by CAO/C