May 30, 2012 NYS TIDAL ENERGY DEVELOPMENT NY ENERGY HIGHWAY<br />

16 U.S.C. § 661 Fish and Wildlife Impacts<br />

This act requires consultation with federal and state fish and wildlife agencies where a federal project<br />

impacts a body of water. FERC has its own independent consultation requirements under Section 10 (I)<br />

of the Federal Power Act.<br />

Endangered Species Act (ESA)<br />

16 U.S.C. § 1531 Endangered Species Impact<br />

Section 7 of the ESA requires consultation with the Secretary of the Interior prior to project<br />

development to determine if endangered species may be present or adversely impacted by the project<br />

development.<br />

Marine Mammals Protection Act<br />

16 U.S.C. § 1361 – 1407 Harassment of Endangered Mammals<br />

This federal law prohibits the harassment, hunting or capture of depleted endangered marine mammals.<br />

The project must prove that it does not “harass” protected marine mammals.<br />

Submerged Land Act<br />

43 U.S.C. § 1301 – Lease for Use of State Lands<br />

The application of this law depends on the project location. At a minimum, the land lease would be<br />

required for transmission lines to shore. Also, under the FPA, 16 U.S.C. § 814, licensee has the power of<br />

eminent domain, which could possibly be used to acquire state lands. It should also be noted that<br />

eminent domain authority has never been tested for in such an application.<br />

Production Tax Credits<br />

Section 45 IRS Code Renewable <strong>Energy</strong> Production Incentive (REPI)<br />

The REPI would apply for tidal and wave energy projects and is structured such that municipal entities<br />

may receive cash reimbursements from the federal government for capital projects which include<br />

production of power from renewable energy sources.<br />