May 30, 2012 NYS TIDAL ENERGY DEVELOPMENT NY ENERGY HIGHWAY<br />

Marine and Hydrokinetic - <strong>Project</strong> Data Summary based on model default values<br />

<strong>Project</strong> Location<br />

New York<br />

Year of Construction or Installation 2013<br />

Reference System Size - Nameplate Capacity (MW) 10.0<br />

Total <strong>Project</strong> Size - Nameplate Capacity (MW) 10.0<br />

Construction Period (months) 18<br />

System Type<br />

<strong>Tidal</strong> Power<br />

System Cost ($/KW) or ($4.724M per MW installed) $4,724<br />

Annualized O & M Cost (percent of Capital Cost) 7.3%<br />

Money Value (Dollar Year) 2012<br />

<strong>Project</strong> Construction or Installation Cost<br />

$47.2M<br />

Local Spending<br />

$34.3M<br />

Total Annual Operational Expenses<br />

$10.1M<br />

Direct Operating and Maintenance Costs<br />

$3.4M<br />

Local Spending<br />

$2.7M<br />

Other Annual Costs<br />

$6.8M<br />

Local Spending<br />

$0.1M<br />

Debt Payments<br />

$0.0M<br />

Property Taxes<br />

$0.0M<br />

Sales Tax<br />

$0.1M<br />

Jobs<br />

Earnings<br />

Local Economic Impacts - Summary Results<br />

Jobs / Year $MM (2012) Output<br />

During construction and installation period 17.0 $2.2 $MM (2012)<br />

<strong>Project</strong> Development and Onsite Labor Impacts 8.1 $1.1 $3.3<br />

Construction and Installation Labor 9.0 $1.1<br />

Construction and Installation Related Services 150.1 $12.4<br />

Module and Supply Chain Impacts 56.0 $4.0 $41.9<br />

Induced Impacts 223.1 $18.5 $10.3<br />

Total Impacts 223.1 $18.5 $55.5<br />

Annual Earnings Annual<br />

Jobs $MM (2012) Output<br />

During operating years $MM (2012)<br />

Onsite Labor Impacts 9.5 $0.7<br />

Hydro <strong>Project</strong> Labor Only 9.7 $0.9 $0.7<br />

Local Revenue and Supply Chain Impacts 4.7 $0.3 $2.9<br />

Induced Impacts 23.8 $2.0 $0.9<br />

Total Impacts 23.8 $2.0 $4.5<br />