08.05.2014 Views

Draft Scoping Information Document - Ontario Power Generation

Draft Scoping Information Document - Ontario Power Generation

Draft Scoping Information Document - Ontario Power Generation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

July 2011<br />

<strong>Draft</strong> <strong>Scoping</strong> <strong>Information</strong> <strong>Document</strong> - Proposal by OPG - Refurbishment and<br />

Continued Operation - Darlington Nuclear Generating Station, Clarington, <strong>Ontario</strong><br />

Rationale for determination<br />

these areas.<br />

Criterion 7.<br />

The NND JRP process represented a very thorough public participation process; however,<br />

elements of this project were not specifically included. Although OPG is actively engaging<br />

the public on this project, this would not completely meet the CNSC objectives. Given the<br />

anticipated public interest, this project will be subject to a CNSC project-specific public<br />

participation process.<br />

As a result of the scan above, is public participation appropriate in the circumstances of this<br />

screening-level EA?<br />

Yes<br />

<br />

or No <br />

If yes, indicate the level of participation required, based on the tabulated score.<br />

None<br />

0 to 2<br />

<br />

Low<br />

3 to 7<br />

<br />

Moderate<br />

8 to 14<br />

<br />

High<br />

15 to 21<br />

<br />

e-DOC 3734740 - 28 -<br />

CEAR 11-01-62516

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!