July 2011<br />
<strong>Draft</strong> <strong>Scoping</strong> <strong>Information</strong> <strong>Document</strong> - Proposal by OPG - Refurbishment and<br />
Continued Operation - Darlington Nuclear Generating Station, Clarington, <strong>Ontario</strong><br />
Rationale for determination<br />
these areas.<br />
Criterion 7.<br />
The NND JRP process represented a very thorough public participation process; however,<br />
elements of this project were not specifically included. Although OPG is actively engaging<br />
the public on this project, this would not completely meet the CNSC objectives. Given the<br />
anticipated public interest, this project will be subject to a CNSC project-specific public<br />
participation process.<br />
As a result of the scan above, is public participation appropriate in the circumstances of this<br />
screening-level EA?<br />
Yes<br />
<br />
or No <br />
If yes, indicate the level of participation required, based on the tabulated score.<br />
None<br />
0 to 2<br />
<br />
Low<br />
3 to 7<br />
<br />
Moderate<br />
8 to 14<br />
<br />
High<br />
15 to 21<br />
<br />
e-DOC 3734740 - 28 -<br />
CEAR 11-01-62516