NEWS FLASH - City of Oshawa
NEWS FLASH - City of Oshawa
NEWS FLASH - City of Oshawa
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PIVAL LOGISTICS CENTRE<br />
Phase 1 <strong>of</strong> the <strong>Oshawa</strong> Logistics Centre is Nearing Completion<br />
Pival International is moving full steam ahead<br />
to completing the construction <strong>of</strong> a 360,000<br />
square foot <strong>Oshawa</strong> Logistics Centre.<br />
The logistics centre will represent an<br />
investment <strong>of</strong> over $40 million and will<br />
coincide with the production <strong>of</strong> the new<br />
Chevrolet Camaro at GM’s <strong>Oshawa</strong> plant.<br />
“This will be Pival’s new flagship facility and<br />
we are convinced that this is only the<br />
beginning <strong>of</strong> a long and prosperous future in<br />
<strong>Oshawa</strong>,” said company President Mario La<br />
Barbera.<br />
Pival’s investment will create hundreds <strong>of</strong> jobs<br />
and generate millions in revenues. With long<br />
term deals already in place, the <strong>Oshawa</strong><br />
Logistics Centre will be a permanent fixture<br />
in the city, helping to grow the local<br />
economy.<br />
The logistics centre will be built in two<br />
phases, with the first to be occupied in<br />
August 2007 and the second slated for<br />
completion in early 2009.<br />
The <strong>City</strong> <strong>of</strong> <strong>Oshawa</strong> <strong>of</strong>ficially welcomed Pival International to the city in September 2006 at Pival’s announcement <strong>of</strong> a new<br />
<strong>Oshawa</strong> Logistics Centre. Aerial View <strong>of</strong> Phase I shown above.<br />
HOPEWELL DEVELOPMENT CORPORATION’S<br />
Thornton Road Business Park<br />
Hopewell Development Corporation is building <strong>Oshawa</strong>’s newest industrial complex. Located on Thornton Road South just across from Pival<br />
International’s Logistic Centre and adjacent to Automodular it is strategically located for new business. The new development will consist <strong>of</strong> two<br />
buildings each approximately 112,000 square feet in size and can be divisible into 22,000 square foot units or greater. The buildings will be<br />
available in April 2008.<br />
3