19.05.2014 Views

the a46 trunk road (newark to widmerpool improvement and slip ...

the a46 trunk road (newark to widmerpool improvement and slip ...

the a46 trunk road (newark to widmerpool improvement and slip ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>the</strong> l<strong>and</strong> which is described in <strong>the</strong> Schedules <strong>to</strong> this Order <strong>and</strong> is<br />

delineated <strong>and</strong> shown coloured pink on <strong>the</strong> plan.<br />

(2) Copies of this Order <strong>and</strong> of <strong>the</strong> Side Roads Order with <strong>the</strong>ir<br />

accompanying plans are deposited along with <strong>the</strong> plan referred <strong>to</strong> in<br />

article 4.<br />

2. In relation <strong>to</strong> <strong>the</strong> purchase authorised by this Order, Parts II <strong>and</strong> III of<br />

Schedule 2 <strong>to</strong> <strong>the</strong> Acquisition of L<strong>and</strong> Act 1981 are incorporated with<br />

this Order subject <strong>to</strong> <strong>the</strong> modifications that references in those Parts <strong>to</strong><br />

<strong>the</strong> undertaking shall be construed as references <strong>to</strong> <strong>the</strong> l<strong>and</strong> authorised<br />

<strong>to</strong> be purchased <strong>and</strong> <strong>to</strong> any buildings or works constructed or <strong>to</strong> be<br />

constructed on it.<br />

3. For <strong>the</strong> purpose of <strong>the</strong> provisions of Schedule 2 <strong>to</strong> <strong>the</strong> Acquisition of<br />

L<strong>and</strong> Act 1981, as incorporated in this Order, <strong>the</strong> prescribed distance in<br />

relation <strong>to</strong> any seam of minerals lying under l<strong>and</strong> adjoining <strong>the</strong> works <strong>to</strong><br />

be constructed upon <strong>the</strong> l<strong>and</strong> described in <strong>the</strong> schedules <strong>to</strong> this Order<br />

shall be such a lateral distance from every side of those works as is<br />

equal at every point along those works <strong>to</strong> one half of <strong>the</strong> depth of <strong>the</strong><br />

seam below <strong>the</strong> natural surface of <strong>the</strong> ground at that point or forty yards<br />

whichever is <strong>the</strong> greater.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!