19.05.2014 Views

INSPECTOR'S NOTE: OUTSTANDING MATTERS FOR PROMOTER ...

INSPECTOR'S NOTE: OUTSTANDING MATTERS FOR PROMOTER ...

INSPECTOR'S NOTE: OUTSTANDING MATTERS FOR PROMOTER ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />

<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />

Topic<br />

Response<br />

1. Confirmation of compliance with statutory procedures. In preparation<br />

2. Response to inspector clarifications Q 15, 16, 21, 58, OA/167<br />

61.<br />

3. Letter from Business West withdrawing objection. OA/108<br />

4. Updated Promoter appearance list OA/105 (06.06.12)<br />

5. Note on position on Residents' Parking Schemes in OA/103, OA-110, OA/111<br />

Bristol.<br />

6. Equalities Impact Assessment OA/152<br />

7. Note on reduction in vehicle flow in BRT corridor – OA/113<br />

reference to 600 vehs and reduction in delay of 12%<br />

through town centre.<br />

8. Width available for peds/cyclists on Prince Street Bridge OA/185<br />

– reference 3.5m Mr Slattery, 2.9m Mr Dobinson.<br />

9. Note on interface with BCC cycling team during scheme REB 5<br />

development.<br />

10. Note on option of continuing scheme along proposed OA/186/ 186a<br />

corridor to Ashton Crescent then along Cumberland<br />

Rd/Wapping Rd/Prince St Bridge.<br />

11. Note on number of buses in total proposed to use the OA/122<br />

route in peak, off peak.<br />

12. Breakdown of economic efficiency ‘Business Users OA/154<br />

and Providers’ Table F2.<br />

13. Note on breakdown of scheme PVC. OA/193<br />

14. Note on references in evidence to assessment of Low OA/163<br />

Cost Alternatives.<br />

15. Note on number of trips from Temple Meads station OA/164<br />

using BRT service for scheme and for revised stop location<br />

assumed in sensitivity test.<br />

16. Response to document submitted by TfGB on DfT OA/151<br />

document “Accessible Train Stations----”.<br />

17. Update note on Environment Agency position on OA/190<br />

scheme with respect to flooding.<br />

18. Note on interface with Passenger Focus. OA/152<br />

19. Consultation leaflet on Portishead Rail consultation. OA/173<br />

20. Proposed ticketing system. OA/153<br />

21. OA/119 key to be added to plan. OA/119a<br />

22. Response on measures to protect Butterfly junction OA/182<br />

during operation of scheme.<br />

23. Note on assumptions made on number of buses on OA/214<br />

scheme for noise and ecology assessments.<br />

24. Note on revenue support for buses in Bristol and North OA/155<br />

Somerset for last year, this year and next year.<br />

25. Response from business community on business rate OA/184<br />

supplement and workplace parking levy.<br />

26. Forecast for CIL income. OA/150<br />

27. Position on bus subsidies by North Somerset Council OA/155<br />

on services into Bristol from Nailsea, Clevedon and<br />

ISSUE 12


<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />

<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />

Weston Super Mare.<br />

28. Update on funding the scheme. OA/184<br />

29. Information on recently announced Central Area Plan. OA/183<br />

30. Plan showing headroom at proposed bridge Silbury OA/204<br />

Road.<br />

31. Minutes of meeting with Network Rail regarding use of OA/207<br />

level crossing.<br />

32. Planning approvals for stadium relating to proposed OA/209<br />

footbridge.<br />

33. Effect of proposed works to retaining wall/embankment OA/189<br />

to rear of properties on Cumberland Road – reference<br />

concerns expressed by Mrs Fay.<br />

34. List of expected road closures during works. Paras 1.9 and 1.10 of<br />

OA/189<br />

35 Note on changes to detailed works which form part of OA/248<br />

LBC applications.<br />

36. Confirmation of Sweet Group audit of scheme costs.<br />

37. Note on concerns regarding works to lower<br />

OA/161<br />

carriageway below Cumberland Rd Bridge.<br />

38. Draft LBC and CAC conditions. OA/240<br />

39. Will guidance kerbs be used at the stops on the City OA/195<br />

Centre Loop?<br />

40. Doc OA-118 Q46 Please explain the breakdown of the OA/197<br />

standard (10.7m) and reduced width (10.15m) quoted for<br />

the BRT route.<br />

41. Note that Section 1.11 of the TWA “A Guide to TWA OA/191<br />

Procedures” Doc CD/63 refers to alternative routes.<br />

Justification still awaited for alternative routes in this case<br />

and the effect on uncertainty and blight as referred to in<br />

the Guide.<br />

42. OA/130 Para 1.29 Reference to GAV TMR-SK05-01.<br />

The plan attached to the note is GAV TMR-SK04-01. Do I<br />

have the correct plan?<br />

43. OA/148 Letter from DCLG – who were the recipients? OA/198<br />

44. OA/113 does not address the issue in clarification Q7.<br />

45. OA/130 does not address the issue in clarification Q9. See Q9<br />

46. OA/130 does not address the issue in clarification Q10. See Q10<br />

47. SW/5 and SW/6 Consultation Leaflets on the North<br />

Fringe to Hengrove Package – (i) are the plans for the city<br />

centre on SW/5 as proposed for the AVTM scheme? (ii)<br />

which elements of the NF to HP would be guided?<br />

ISSUE 12<br />

Yes the plan is GAV TMR-<br />

SK04-01. The Ref in 1.29<br />

was in error<br />

OA/183<br />

48. Noise levels both to front and rear of relevant<br />

OA/205<br />

properties on Cumberland Road<br />

49. Information regarding “tranquil areas” OA/202<br />

50. Noise emission level standards assumed for buses on<br />

scheme.<br />

51. Noise barrier – confirmation of start and stopping<br />

chainages<br />

OA/199


<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />

<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />

52. Disconnect between stopped up and diverted PROW OA/210<br />

at western end of scheme<br />

53. Central Area Action Plan Public realm document OA/192<br />

54. Note on Wapping Wharf consent details relating to OA/208<br />

frontages with scheme and public realm obligations<br />

55. OA/186 plan showing alternative scheme costed. OA/200<br />

TUBA economic analysis of alternative<br />

56. City Docks Mooring Policy 2008 OA/194<br />

57. Plan to clarify the width of the different elements of the OA/241<br />

corridor between Wapping Wharf and M Shed.<br />

58. Coal Authority – clarification in relation to location of<br />

works and zone for notifications.<br />

59. Plan view of BCFC footbridge OA/209a<br />

60. In response to Mr McDonnell - clarification on whether OA/227<br />

there would be any physical or regulatory restrictions on<br />

the use of the east side<br />

of Prince Street Bridge in relation to use by pedestrians<br />

and cyclists during normal operations of the scheme and<br />

during events<br />

61. Responses to Mrs Flint's questions submitted 20 June OA/228<br />

2012.<br />

62. In response to Mr Garrett - number of passengers<br />

boarding at Temple Meads for both the proposed stop<br />

location and for the sensitivity test with the stop on the<br />

Friary.<br />

63. To consider availability of Technical Note on modelling OA/233<br />

of delays at single track sections (in response to Mr<br />

Buchan).<br />

64. To consider availability of Technical Note on P and R OA/232<br />

(in response to Mr Buchan).<br />

65. To consider availability of Technical Note on changes<br />

to model at each stage (in response to Mr Buchan).<br />

66. Reference Rebuttal 10 para. 3.4 - clarification of claim<br />

that the impact on mode choice is in line with TAG unit<br />

3.10.3.<br />

67. Information on through and non-through trips to city<br />

centre.<br />

Update of OA/167 regarding Open Space, Exchange Land<br />

and the application for Town and Village Green status<br />

69. Promoters response to all outstanding statutory<br />

objections<br />

70. Copies of letters/correspondence confirming<br />

withdrawal of objections .<br />

71. Response, as the promoters consider necessary, to<br />

other written objections<br />

TFGBA/1/17<br />

OA/236<br />

OA/243<br />

Ongoing<br />

ISSUE 12


<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />

<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />

72. Response to Civic Society supplementary proof.<br />

73. Updated version of " filled order". OA/237, OA/238, OA/239<br />

74. North Somerset Council Consultation Document on<br />

Parking<br />

OA/244/OA244A<br />

ISSUE 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!