INSPECTOR'S NOTE: OUTSTANDING MATTERS FOR PROMOTER ...
INSPECTOR'S NOTE: OUTSTANDING MATTERS FOR PROMOTER ...
INSPECTOR'S NOTE: OUTSTANDING MATTERS FOR PROMOTER ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />
<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />
Topic<br />
Response<br />
1. Confirmation of compliance with statutory procedures. In preparation<br />
2. Response to inspector clarifications Q 15, 16, 21, 58, OA/167<br />
61.<br />
3. Letter from Business West withdrawing objection. OA/108<br />
4. Updated Promoter appearance list OA/105 (06.06.12)<br />
5. Note on position on Residents' Parking Schemes in OA/103, OA-110, OA/111<br />
Bristol.<br />
6. Equalities Impact Assessment OA/152<br />
7. Note on reduction in vehicle flow in BRT corridor – OA/113<br />
reference to 600 vehs and reduction in delay of 12%<br />
through town centre.<br />
8. Width available for peds/cyclists on Prince Street Bridge OA/185<br />
– reference 3.5m Mr Slattery, 2.9m Mr Dobinson.<br />
9. Note on interface with BCC cycling team during scheme REB 5<br />
development.<br />
10. Note on option of continuing scheme along proposed OA/186/ 186a<br />
corridor to Ashton Crescent then along Cumberland<br />
Rd/Wapping Rd/Prince St Bridge.<br />
11. Note on number of buses in total proposed to use the OA/122<br />
route in peak, off peak.<br />
12. Breakdown of economic efficiency ‘Business Users OA/154<br />
and Providers’ Table F2.<br />
13. Note on breakdown of scheme PVC. OA/193<br />
14. Note on references in evidence to assessment of Low OA/163<br />
Cost Alternatives.<br />
15. Note on number of trips from Temple Meads station OA/164<br />
using BRT service for scheme and for revised stop location<br />
assumed in sensitivity test.<br />
16. Response to document submitted by TfGB on DfT OA/151<br />
document “Accessible Train Stations----”.<br />
17. Update note on Environment Agency position on OA/190<br />
scheme with respect to flooding.<br />
18. Note on interface with Passenger Focus. OA/152<br />
19. Consultation leaflet on Portishead Rail consultation. OA/173<br />
20. Proposed ticketing system. OA/153<br />
21. OA/119 key to be added to plan. OA/119a<br />
22. Response on measures to protect Butterfly junction OA/182<br />
during operation of scheme.<br />
23. Note on assumptions made on number of buses on OA/214<br />
scheme for noise and ecology assessments.<br />
24. Note on revenue support for buses in Bristol and North OA/155<br />
Somerset for last year, this year and next year.<br />
25. Response from business community on business rate OA/184<br />
supplement and workplace parking levy.<br />
26. Forecast for CIL income. OA/150<br />
27. Position on bus subsidies by North Somerset Council OA/155<br />
on services into Bristol from Nailsea, Clevedon and<br />
ISSUE 12
<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />
<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />
Weston Super Mare.<br />
28. Update on funding the scheme. OA/184<br />
29. Information on recently announced Central Area Plan. OA/183<br />
30. Plan showing headroom at proposed bridge Silbury OA/204<br />
Road.<br />
31. Minutes of meeting with Network Rail regarding use of OA/207<br />
level crossing.<br />
32. Planning approvals for stadium relating to proposed OA/209<br />
footbridge.<br />
33. Effect of proposed works to retaining wall/embankment OA/189<br />
to rear of properties on Cumberland Road – reference<br />
concerns expressed by Mrs Fay.<br />
34. List of expected road closures during works. Paras 1.9 and 1.10 of<br />
OA/189<br />
35 Note on changes to detailed works which form part of OA/248<br />
LBC applications.<br />
36. Confirmation of Sweet Group audit of scheme costs.<br />
37. Note on concerns regarding works to lower<br />
OA/161<br />
carriageway below Cumberland Rd Bridge.<br />
38. Draft LBC and CAC conditions. OA/240<br />
39. Will guidance kerbs be used at the stops on the City OA/195<br />
Centre Loop?<br />
40. Doc OA-118 Q46 Please explain the breakdown of the OA/197<br />
standard (10.7m) and reduced width (10.15m) quoted for<br />
the BRT route.<br />
41. Note that Section 1.11 of the TWA “A Guide to TWA OA/191<br />
Procedures” Doc CD/63 refers to alternative routes.<br />
Justification still awaited for alternative routes in this case<br />
and the effect on uncertainty and blight as referred to in<br />
the Guide.<br />
42. OA/130 Para 1.29 Reference to GAV TMR-SK05-01.<br />
The plan attached to the note is GAV TMR-SK04-01. Do I<br />
have the correct plan?<br />
43. OA/148 Letter from DCLG – who were the recipients? OA/198<br />
44. OA/113 does not address the issue in clarification Q7.<br />
45. OA/130 does not address the issue in clarification Q9. See Q9<br />
46. OA/130 does not address the issue in clarification Q10. See Q10<br />
47. SW/5 and SW/6 Consultation Leaflets on the North<br />
Fringe to Hengrove Package – (i) are the plans for the city<br />
centre on SW/5 as proposed for the AVTM scheme? (ii)<br />
which elements of the NF to HP would be guided?<br />
ISSUE 12<br />
Yes the plan is GAV TMR-<br />
SK04-01. The Ref in 1.29<br />
was in error<br />
OA/183<br />
48. Noise levels both to front and rear of relevant<br />
OA/205<br />
properties on Cumberland Road<br />
49. Information regarding “tranquil areas” OA/202<br />
50. Noise emission level standards assumed for buses on<br />
scheme.<br />
51. Noise barrier – confirmation of start and stopping<br />
chainages<br />
OA/199
<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />
<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />
52. Disconnect between stopped up and diverted PROW OA/210<br />
at western end of scheme<br />
53. Central Area Action Plan Public realm document OA/192<br />
54. Note on Wapping Wharf consent details relating to OA/208<br />
frontages with scheme and public realm obligations<br />
55. OA/186 plan showing alternative scheme costed. OA/200<br />
TUBA economic analysis of alternative<br />
56. City Docks Mooring Policy 2008 OA/194<br />
57. Plan to clarify the width of the different elements of the OA/241<br />
corridor between Wapping Wharf and M Shed.<br />
58. Coal Authority – clarification in relation to location of<br />
works and zone for notifications.<br />
59. Plan view of BCFC footbridge OA/209a<br />
60. In response to Mr McDonnell - clarification on whether OA/227<br />
there would be any physical or regulatory restrictions on<br />
the use of the east side<br />
of Prince Street Bridge in relation to use by pedestrians<br />
and cyclists during normal operations of the scheme and<br />
during events<br />
61. Responses to Mrs Flint's questions submitted 20 June OA/228<br />
2012.<br />
62. In response to Mr Garrett - number of passengers<br />
boarding at Temple Meads for both the proposed stop<br />
location and for the sensitivity test with the stop on the<br />
Friary.<br />
63. To consider availability of Technical Note on modelling OA/233<br />
of delays at single track sections (in response to Mr<br />
Buchan).<br />
64. To consider availability of Technical Note on P and R OA/232<br />
(in response to Mr Buchan).<br />
65. To consider availability of Technical Note on changes<br />
to model at each stage (in response to Mr Buchan).<br />
66. Reference Rebuttal 10 para. 3.4 - clarification of claim<br />
that the impact on mode choice is in line with TAG unit<br />
3.10.3.<br />
67. Information on through and non-through trips to city<br />
centre.<br />
Update of OA/167 regarding Open Space, Exchange Land<br />
and the application for Town and Village Green status<br />
69. Promoters response to all outstanding statutory<br />
objections<br />
70. Copies of letters/correspondence confirming<br />
withdrawal of objections .<br />
71. Response, as the promoters consider necessary, to<br />
other written objections<br />
TFGBA/1/17<br />
OA/236<br />
OA/243<br />
Ongoing<br />
ISSUE 12
<strong>INSPECTOR'S</strong> <strong>NOTE</strong>: A/ 1<br />
<strong>OUTSTANDING</strong> <strong>MATTERS</strong> <strong>FOR</strong> <strong>PROMOTER</strong> AS OF 6pm 26 JUNE 2012<br />
72. Response to Civic Society supplementary proof.<br />
73. Updated version of " filled order". OA/237, OA/238, OA/239<br />
74. North Somerset Council Consultation Document on<br />
Parking<br />
OA/244/OA244A<br />
ISSUE 12