M1 JUNCTION 19 IMPROVEMENT SCHEME PUBLIC INQUIRY<br />
INQUIRY DOCUMENT LIST<br />
HA/13/02<br />
HA/13/03<br />
HA/14/01<br />
HA/15/01<br />
Appendices to Proof of Evidence<br />
Summary to Proof<br />
Engineering Design and Construction Figures and Drawings<br />
(includes drawings / figures that are referenced in both HA/02/01 (Construction by Gordon<br />
Gray) and HA/03/01 (Engineering and Design by Peter Kirk)<br />
A3 Environmental Figures and Drawings Appendix<br />
( includes drawings / figures that are referenced in HA/05/01, HA/06/01, HA/07/01,<br />
HA/08/01, HA/09/01, HA/10/01, HA/11/01, HA/12/01 & HA/13/01 which have been written by<br />
8 expert witness<br />
HA/16/01 Line, Scheme, Side Road and Compulsory Purchase Orders Post Draft Order <strong>Public</strong>ation<br />
Modifications Report<br />
HA/17/01 Not Used<br />
HA/18/01 Not Used<br />
HA/19/01 Not Used<br />
HA/20/01 Alternative Junction Report, Alternative 1<br />
HA/20/02 Alternative Junction Report, Alternative 3<br />
HA/20/03 Alternative Junction Report, Alternative 7<br />
HA/20/04 Alternative Junction Report, Alternative 8<br />
HA/20/05 Alternative Junction Report, Alternative 9<br />
HA/20/06 Alternative Junction Report, Alternative 10<br />
HA/20/07 Alternative Junction Layout & Movement Summaries (Submitted at <strong>Inquiry</strong>)<br />
HA/21/01 Alternative Bridleway Report, Options 1 and 2<br />
HA/21/02 Alternative Bridleway Report, Options 3 and 4<br />
HA/22/01 Future Junction Feasibility Report, Option 1<br />
HA/23/01 Response by the HA - Messrs M.G., S.M., J.H. and J.M. Grindal and the M.G. & S.M.<br />
Grindal Partnership<br />
HA/24/01 Response by the HA - Messrs A.C. and R.C.W. Turney<br />
HA/25/01 Response by the HA - Messrs S, J.R, J.R and P Morris<br />
HA/26/01 Response by the HA - Mr R. Deacon<br />
DOCUMENTS SUBMITTED BY THE HIGHWAYS AGENCY DURING THE INQUIRY<br />
HA/27<br />
HA/28<br />
HA/29<br />
HA/30<br />
HA/31<br />
HA/32<br />
Opening Statement on behalf of the Highways Agency<br />
Compliance Folders (4 off) (Not available to view on the web)<br />
Amendment document to HA/15-01 referenced in several witnesses proofs<br />
Answers to questions asked by the Inspector<br />
Extract of document “ <strong>Public</strong> Rights of Way” – (GAEC8)<br />
Alternative Bridleway costing’s document (Revised extract)<br />