26.05.2014 Views

English - Version - Putzmeister Akademie

English - Version - Putzmeister Akademie

English - Version - Putzmeister Akademie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Safety manual<br />

Concrete delivery and placing machines<br />

2.5 Placing booms<br />

2.5.1 Unfolding the<br />

placing boom<br />

Only raise a mobile placing boom from the driving position once<br />

the machine has been supported in accordance with the Operating<br />

Instructions. Stationary booms may only be raised after the proper<br />

set–up has been checked by a subject expert.<br />

Only raise the placing boom in the sequence described in the<br />

Operating Instructions. The correct sequence depends on the<br />

folding system (roll–and–fold system, Z–fold system, etc.).<br />

Always ask the site management to supply you with an assistant to<br />

act as a signaller. Agree clear hand signals or other signals with the<br />

signaller so that you can communicate with each other. You should<br />

position the signaller such that he can always observe the whole of<br />

the placing boom. Your primary duty as the machine operator is to<br />

observe the site of concrete placement.<br />

Only slew the placing boom over persons when the end hose is<br />

empty. There is a risk of concrete falling out of the end hose.<br />

01/2011 Rev08 EN<br />

41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!