English - Version - Putzmeister Akademie
English - Version - Putzmeister Akademie
English - Version - Putzmeister Akademie
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Safety manual<br />
Concrete delivery and placing machines<br />
2.5 Placing booms<br />
2.5.1 Unfolding the<br />
placing boom<br />
Only raise a mobile placing boom from the driving position once<br />
the machine has been supported in accordance with the Operating<br />
Instructions. Stationary booms may only be raised after the proper<br />
set–up has been checked by a subject expert.<br />
Only raise the placing boom in the sequence described in the<br />
Operating Instructions. The correct sequence depends on the<br />
folding system (roll–and–fold system, Z–fold system, etc.).<br />
Always ask the site management to supply you with an assistant to<br />
act as a signaller. Agree clear hand signals or other signals with the<br />
signaller so that you can communicate with each other. You should<br />
position the signaller such that he can always observe the whole of<br />
the placing boom. Your primary duty as the machine operator is to<br />
observe the site of concrete placement.<br />
Only slew the placing boom over persons when the end hose is<br />
empty. There is a risk of concrete falling out of the end hose.<br />
01/2011 Rev08 EN<br />
41