26.05.2014 Views

English - Version - Putzmeister Akademie

English - Version - Putzmeister Akademie

English - Version - Putzmeister Akademie

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Index of key words<br />

Index of key words<br />

Concrete delivery and placing machines<br />

A<br />

Accessories and attachments, 21<br />

After Sales Service personnel, Definition<br />

of terms, 11<br />

Arm assembly, Definition of terms, 9<br />

Authorized inspector, Definition of<br />

terms, 11<br />

Auxiliary personnel, Definition of<br />

terms, 10<br />

B<br />

Base structure, Definition of terms, 9<br />

Blockages, 46<br />

Boom pedestal, Definition of terms, 9<br />

C<br />

Cleaning, 51<br />

- Cleaning agents, 52<br />

- Compressed air, 53<br />

- Hazards, 52<br />

- Post–cleaning procedure, 54<br />

Cleaning agents, 52<br />

Clearances<br />

- From high–voltage lines, 29<br />

- To delivery lines, 47<br />

Cold weather, 44<br />

Components<br />

- Electrical components, 61<br />

- Safety–relevant components, 58<br />

Compressed air cleaning, 53<br />

Concrete pump, Definition of terms, 9<br />

Corner bearing load, 36<br />

D<br />

Danger zone, 12, 15<br />

- Delivery line systems, 16<br />

- End hose, 16, 43<br />

- Hopper, 16<br />

- Machine, 16<br />

- Placing boom, 15<br />

- Support legs and support feet, 15<br />

Definition of terms<br />

- After Sales Service personnel, 11<br />

- Arm assembly, 9<br />

- Authorized inspector, 11<br />

- Auxiliary personnel, 10<br />

- Base structure, 9<br />

- Boom pedestal, 9<br />

- Concrete pump, 9<br />

- Danger zone, 12, 15<br />

- Delivery line systems, 9<br />

- Hoseman, 10<br />

- Machine, 10<br />

- Machine operator, 10<br />

- Maintenance, 11<br />

- Operator, 10<br />

- Place of work, 12, 14<br />

- Placing boom, 9<br />

- Qualified personnel, 11<br />

- Signaller, 10<br />

- Subject expert, 11<br />

- Truck mixer, 9<br />

- Truck mixer driver, 11<br />

- Working area, 12, 14<br />

Delivery line systems, 45<br />

- Clearance to delivery lines, 47<br />

- Continuation delivery lines, 47<br />

- Danger zone, 16<br />

- Definition of terms, 9<br />

- Fastening delivery lines, 47<br />

- Opening the delivery line, 47<br />

- Securing delivery lines, 45<br />

- Shutting–off, diverting, cleaning, 48<br />

- Suitable delivery line, 45<br />

- Tightness and blockages, 46<br />

Designated use, 17<br />

- Inspection intervals, 18<br />

Discharge voltage pattern, 29<br />

Driving, 38<br />

E<br />

Earthing, 32<br />

Electrical components, 61<br />

Electrical power, 60<br />

- Power at the construction site, 61<br />

Electrostatic charging, 32<br />

EMERGENCY STOP button, 28, 42<br />

Emissions, Noise, 63<br />

End hose, 43<br />

- Danger zone, 16, 43<br />

- Extending, 20<br />

- Impermissible end hose, 20<br />

Exhaust fumes, 64<br />

Extensions, End hose and placing<br />

boom, 20<br />

F<br />

Face mask, 26<br />

Flash over, 31<br />

Fumes, Exhaust, 64<br />

Functional fluids, 64<br />

H<br />

Hearing protectors, 25<br />

High–pressure delivery, 21<br />

High–voltage lines, 29<br />

- Clearances, 29<br />

- High–voltage warning device, 31<br />

- Procedure in the event of a flash over,<br />

31<br />

High–voltage warning device, 31<br />

Hopper, Danger zone, 16<br />

Hoseman, Definition of terms, 10<br />

Hydraulic hoses, 63<br />

Hydraulic systems, 62<br />

I<br />

Impermissible end hose, 20<br />

Impermissible working area, 14, 20<br />

Inspection intervals, 18<br />

L<br />

Liability, Exclusion, 21<br />

Lifting loads, 19, 33<br />

Lifting points, 40<br />

Loading, 33, 40<br />

- Lifting points, 40<br />

M<br />

Machine<br />

- Danger zone, 16<br />

- Definition of terms, 10<br />

- Moving machine components, 50<br />

- Observing, 50<br />

Machine operator<br />

- Definition of terms, 10<br />

- Responsibility of the machine operator,<br />

22<br />

Maintenance, Definition of terms, 11<br />

Maintenance and special work, 55<br />

Mobile machines, 34<br />

- Set–up site, 34<br />

- Supporting ground, 35<br />

N<br />

Noise emissions, 63<br />

01/2011 Rev08 EN<br />

67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!