28.05.2014 Views

port of los angeles handbook & business directory 2011-2012

port of los angeles handbook & business directory 2011-2012

port of los angeles handbook & business directory 2011-2012

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CONTAINER continued<br />

BERTHS 302-305<br />

APL CONTAINER TERMINAL/GLOBAL GATEWAY SOUTH<br />

Terminal operator: Eagle Marine<br />

614 Terminal Way, Terminal Island, CA 90731<br />

Contact: Jack Cutler, Terminal Manager<br />

Phone: (310) 548-8700<br />

Website: www.eaglemarineservices.com<br />

Mode <strong>of</strong> operation: Containerized cargo; wheeled and grounded<br />

Land area: 292 acres<br />

Total berth length: 4,000’ Berths: 4<br />

Height: 15’ Water depth: 45’<br />

Cranes: 12 post-Panamax cranes<br />

Terminal features: 55,000-square-foot maintenance and repair facility; on-dock rail<br />

service accommodates up to 64 five-platform double-stack railcars (equivalent to<br />

nearly three full trains); two dedicated lead rail tracks provide flexible entrance/exit<br />

points <strong>of</strong>f the main rail line within the Alameda Corridor; gate complex includes<br />

intermodal control tower; 13 inbound and 8 outbound lanes; integrated, real-time<br />

computer system for vessel, rail and gate operations; 600 refrigerated container plugs;<br />

wash system for interior/exterior <strong>of</strong> containers<br />

Shipping lines served: APL, Hyundai, MOL, Evergreen, Hapag-Lloyd, Maersk<br />

BERTHS 401-404<br />

APM TERMINALS/PIER 400 CONTAINER TERMINAL<br />

Terminal operator: APM Terminals<br />

2500 Navy Way, Terminal Island, CA 90731<br />

Contact: Alan McCorkle, Senior Vice President<br />

Phone: (310) 221-4000<br />

Website: www.apmterminals.com<br />

Mode <strong>of</strong> operation: Containerized cargo; wheeled and grounded<br />

Land area: 484 acres<br />

Total berth length: 7,190’ Berths: 6<br />

Height: 15.2’ Water depth: 55’<br />

Cranes: 14 Super post-Panamax cranes<br />

Terminal features: Administration building; vessel operations building; rail operations<br />

building; maintenance and repair facility/multi-purpose dock; on-dock service is<br />

designed for 12 loading tracks, each approximately 2,500 feet, and capable <strong>of</strong><br />

handling eight 305-foot double-stack railcars for a total capacity <strong>of</strong> 96 railcars; six<br />

adjacent storage tracks, each 6,400 feet, and capable <strong>of</strong> handling twenty-one 305-<br />

foot double-stack railcars, for a total capacity <strong>of</strong> 126 railcars; trans<strong>port</strong>ation corridor<br />

for rail and highway traffic; three advanced gate complexes with 36 inbound lanes<br />

and 20 outbound lanes; 1,800 refrigerated container plugs<br />

Shipping lines served: Maersk, Horizon Lines Inc.<br />

BERTHS 405-406<br />

CALIFORNIA UNITED TERMINALS<br />

Terminal operator: California United Terminals<br />

2525 Navy Way, Terminal Island, CA 90731<br />

Contact: George Lang, Chief Operating Officer<br />

Phone: (310) 521-5000<br />

Website: www.shipcut.com<br />

Mode <strong>of</strong> operation: Containerized cargo; wheeled and grounded<br />

Land area: 91 acres<br />

Total berth length: 2000’ Berths: 1<br />

Height: 15.2’ Water depth: 55’<br />

Cranes: 4 Super post-Panamax cranes<br />

Terminal features: Administration building; vessel operations building; on-dock rail;<br />

advanced gate complexes with 10 inbound lanes and 10 outbound lanes; refrigerated<br />

container plugs<br />

Shipping lines served: Hyundai, APL, MOL<br />

38<br />

PORT OF LOS ANGELES HANDBOOK & BUSINESS DIRECTORY <strong>2011</strong>-<strong>2012</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!